Hospital Padre Carollo

HVAC Load Analysis


for

Fundacion Tierra Nueva

Prepared By:

Clima Tech

viernes, 26 de abril de 2019


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 2

Building Summary Loads


Building peaks in August at 5pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 0 0 0.00 0 0 0 0.00
Wall 348 0 0.00 0 618 618 0.59
Glass 0 0 0.00 0 0 0 0.00
Floor Slab 0 0 0.00 0 0 0 0.00
Skin Loads 0 0.00 0 618 618 0.59
Lighting 1,006 0 0.00 0 3,748 3,748 3.57
Equipment 4,000 0 0.00 0 15,013 15,013 14.30
Pool Latent 0 0 0.00 0 0 0 0.00
People 20 0 0.00 6,050 6,019 12,069 11.50
Partition 502 0 0.00 0 535 535 0.51
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 4,400 0 0.00 35,063 -4,015 31,048 29.58
Heat. Vent. 0 0 0.00 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 415 415 0.40
Blow-Thru Fan 0 0 0.00 0 0 0 0.00
Reserve Cap. 0 0 0.00 0 41,528 41,528 39.56
Reheat Cap. 0 0 0.00 0 0 0 0.00
Supply Duct 0 0 0.00 0 0 0 0.00
Return Duct 0 0 0.00 0 0 0 0.00
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00
Building Totals 0 0.00 41,113 63,861 104,973 100.00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 0 0.00 35,063 -4,015 31,048 29.58
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Room Loads 0 0.00 6,050 67,460 73,510 70.03
Plenum Loads 0 0.00 0 0 0 0.00
Fan/Duct/Misc Loads 0 0.00 0 415 415 0.40
Building Totals 0 0.00 41,113 63,860 104,973 100.00

Check Figures
Total Building Supply Air (based on a 20° TD): 4,398 CFM
Total Building Vent. Air (100.04% of Supply): 4,400 CFM
Total Conditioned Air Space: 914 Sq.ft
Supply Air Per Unit Area: 4.8097 CFM/Sq.ft
Area Per Cooling Capacity: 104.5 Sq.ft/Ton
Cooling Capacity Per Area: 0.0096 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 8.75 Tons

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 3

Air Handler #1 - Uma-01 - Summary Loads


Rm Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Room Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
1 Salas De Parto 235 0 10,895 1,210 Direct Direct
6pm August 4 0 1,399 0 0 1,400
1,881 0.00 5.95 0 0 1,400
Room Peak Totals: 235 0 10,895 1,210
Total Rooms: 1 4 0 1,399 0 0 1,400
Unique Rooms: 1 1,881 0.00 5.95 0 0 1,400

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 4

Air Handler #1 - Uma-01 - Total Load Summary


Air Handler Description: Uma-01 Constant Volume - Sum of Peaks
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.07 HP
Fan Input: 90% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio: 0.95 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 5pm in August.
Outdoor Conditions: Clg: 74° DB, 64° WB, 110.46 grains
Indoor Conditions: Clg: 75° DB, 50% RH
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Room Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (.709 X 1.08 X 0) = 0 CFM
Winter Vent Outside Air (0.0% of supply) = 0 CFM
Room space sensible gain: 10,781 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 132 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 10,786 Btuh
Total sensible gain on supply side of coil: 21,699 Btuh
Cooling Supply Air: 21,813 / (.709 X 1.1 X 20) = 1,399 CFM
Summer Vent Outside Air (100.1% of supply) = 1,400 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -1,091 Btuh 1,400 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: -1,091 Btuh
Total sensible gain on air handling system: 20,608 Btuh
Room space latent gain: 1,210 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 12,781 Btuh
Total latent gain on air handling system: 13,991 Btuh
Total system sensible and latent gain: 34,598 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 1,399 CFM
Total Air Handler Vent. Air (100.06% of Supply): 1,400 CFM
Total Conditioned Air Space: 235 Sq.ft
Supply Air Per Unit Area: 5.9498 CFM/Sq.ft
Area Per Cooling Capacity: 81.6 Sq.ft/Ton
Cooling Capacity Per Area: 0.0123 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 2.88 Tons

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 5

Air Handler #2 - Uma-03,04,05,06 - Summary Loads


Rm Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Room Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
2 Quirofanos ST 362 0 7,669 2,420 None Direct
12am August 8 0 1,500 0 0 1,500
2,899 0.00 4.14 0 0 1,500
Room Peak Totals: 362 0 7,669 2,420
Total Rooms: 1 8 0 1,500 0 0 1,500
Unique Rooms: 1 2,899 0.00 4.14 0 0 1,500

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 6

Air Handler #2 - Uma-03,04,05,06 - Total Load Summary


Air Handler Description: Uma-03,04,05,06 Constant Volume - Sum of Peaks
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.08 HP
Fan Input: 90% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio: 0.91 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 5pm in August.
Outdoor Conditions: Clg: 74° DB, 64° WB, 110.46 grains
Indoor Conditions: Clg: 75° DB, 50% RH
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Room Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (.709 X 1.08 X 0) = 0 CFM
Winter Vent Outside Air (0.0% of supply) = 0 CFM
Room space sensible gain: 7,669 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 141 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 15,569 Btuh
Total sensible gain on supply side of coil: 23,380 Btuh
Cooling Supply Air: 23,380 / (.709 X 1.1 X 20) = 1,500 CFM
Summer Vent Outside Air (100.0% of supply) = 1,500 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -1,169 Btuh 1,500 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: -1,169 Btuh
Total sensible gain on air handling system: 22,210 Btuh
Room space latent gain: 2,420 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 13,693 Btuh
Total latent gain on air handling system: 16,113 Btuh
Total system sensible and latent gain: 38,324 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 1,500 CFM
Total Air Handler Vent. Air (100.03% of Supply): 1,500 CFM
Total Conditioned Air Space: 362 Sq.ft
Supply Air Per Unit Area: 4.1389 CFM/Sq.ft
Area Per Cooling Capacity: 113.4 Sq.ft/Ton
Cooling Capacity Per Area: 0.0088 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 3.19 Tons

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 7

Air Handler #3 - Uma-03 - Summary Loads


Rm Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Room Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
3 Quirofano H. Dia 317 0 7,482 2,420 None Direct
12am August 8 0 1,500 0 0 1,500
2,536 0.00 4.73 0 0 1,500
Room Peak Totals: 317 0 7,482 2,420
Total Rooms: 1 8 0 1,500 0 0 1,500
Unique Rooms: 1 2,536 0.00 4.73 0 0 1,500

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 8

Air Handler #3 - Uma-03 - Total Load Summary


Air Handler Description: Uma-03 Constant Volume - Sum of Peaks
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.08 HP
Fan Input: 90% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio: 0.90 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 5pm in August.
Outdoor Conditions: Clg: 74° DB, 64° WB, 110.46 grains
Indoor Conditions: Clg: 76° DB, 52% RH
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Room Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (.709 X 1.08 X 0) = 0 CFM
Winter Vent Outside Air (0.0% of supply) = 0 CFM
Room space sensible gain: 7,482 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 141 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 15,173 Btuh
Total sensible gain on supply side of coil: 22,796 Btuh
Cooling Supply Air: 22,796 / (.709 X 1.1 X 20) = 1,500 CFM
Summer Vent Outside Air (100.0% of supply) = 1,500 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -1,754 Btuh 1,500 CFM
Blow-thru fan sensible gain: 0 Btuh
Total sensible gain on return side of coil: -1,754 Btuh
Total sensible gain on air handling system: 21,042 Btuh
Room space latent gain: 2,420 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 8,589 Btuh
Total latent gain on air handling system: 11,009 Btuh
Total system sensible and latent gain: 32,051 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 1,500 CFM
Total Air Handler Vent. Air (100.02% of Supply): 1,500 CFM
Total Conditioned Air Space: 317 Sq.ft
Supply Air Per Unit Area: 4.7307 CFM/Sq.ft
Area Per Cooling Capacity: 118.7 Sq.ft/Ton
Cooling Capacity Per Area: 0.0084 Tons/Sq.ft
Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 2.67 Tons

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 9

Zone Detailed Loads (At Zone Peak Times)


Load Unit U.Fac/ Conv. Radiant Total Lat. Htg. Htg.
Description Quan Usage S.Gain S.Gain S.Gain Gain Mult. Loss
Room 1-Salas De Parto - Air Handler 1 (Uma-01), Zone 0 peaks (sensible) in August at 6pm.
Wall-2-SE-Type:11 348 0.500 315 332 647 14.500 5,046
Partition-1-1 502 0.242 486 0 486 0.968 486
Lights-Prof=1 259 1.000 291 575 866
Equipment-Prof=3 2,000 1.000 5,459 1,365 6,824 0
People-Prof=1 4.0 1.000 440 642 1,082 1,100
Sub-total 9,905 1,100 0
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 10,895 1,210 0

Room 2-Quirofanos ST - Air Handler 2 (Uma-03,04,05,06), Zone 0 peaks (sensible) in August at 12am.
Lights-Prof=2 399 1.000 449 911 1,360
Equipment-Prof=3 1,000 1.000 2,730 682 3,412 0
People-Prof=2 8.0 1.000 880 1,320 2,200 2,200
Sub-total 6,972 2,200 0
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 7,669 2,420 0

Room 3-Quirofano H. Dia - Air Handler 3 (Uma-03), Zone 0 peaks (sensible) in August at 12am.
Lights-Prof=2 349 1.000 393 797 1,190
Equipment-Prof=2 1,000 1.000 2,730 682 3,412 0
People-Prof=2 8.0 1.000 880 1,320 2,200 2,200
Sub-total 6,802 2,200 0
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 7,482 2,420 0

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 10

Room Detailed Loads (At Room Peak Times)


Load Unit U.Fac/ Conv. Radiant Total Lat. Htg. Htg.
Description Quan Usage S.Gain S.Gain S.Gain Gain Mult. Loss
Room 1-Salas De Parto peaks (sensible) in August at 6pm, Air Handler 1 (Uma-01), Zone 0, 16.6 x
14.2, Construction Type: 1 (Exterior, Light Construction, With Carpet, 10% Glass)
Wall-2-SE-Type:11 348 0.500 315 332 647 14.500 5,046
Partition-1-1 502 0.242 486 0 486 0.968 486
Lights-Prof=1 259 1.000 291 575 866
Equipment-Prof=3 2,000 1.000 5,459 1,365 6,824 0
People-Prof=1 4.0 1.000 440 642 1,082 1,100
Sub-total 9,905 1,100 0
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 10,895 1,210 0

Room 2-Quirofanos ST peaks (sensible) in August at 12am, Air Handler 2 (Uma-03,04,05,06), Zone 0,
23.3 x 15.6, Construction Type: 1 (Exterior, Light Construction, With Carpet, 10% Glass)
Lights-Prof=2 399 1.000 449 911 1,360
Equipment-Prof=3 1,000 1.000 2,730 682 3,412 0
People-Prof=2 8.0 1.000 880 1,320 2,200 2,200
Sub-total 6,972 2,200 0
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 7,669 2,420 0

Equipment Cooling Loads


Nominal Quantity Nominal Quantity Sensible Latent
Item Output Type Output Type Load Load
Name Sensible Sensible Latent Latent (Btuh) (Btuh)
Miselanius Equipment 1,000 watts 0 Btuh 3,412 0
Total 3,412 0

Room 3-Quirofano H. Dia peaks (sensible) in August at 12am, Air Handler 3 (Uma-03), Zone 0, 20.0 x
15.9, Construction Type: 1 (Exterior, Light Construction, With Carpet, 10% Glass)
Lights-Prof=2 349 1.000 393 797 1,190
Equipment-Prof=2 1,000 1.000 2,730 682 3,412 0
People-Prof=2 8.0 1.000 880 1,320 2,200 2,200
Sub-total 6,802 2,200 0
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 7,482 2,420 0

Equipment Cooling Loads


Nominal Quantity Nominal Quantity Sensible Latent
Item Output Type Output Type Load Load
Name Sensible Sensible Latent Latent (Btuh) (Btuh)
Miselaniun Equiment 1,000 watts 0 Btuh 3,412 0
Total 3,412 0

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 11

Air System #1 (Uma-01) Psychrometric Chart


RC Room Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain MR Return Side Miscellaneous Gain
PRE Pretreated Air Condition HRV Heat Recovery Ventilator Condition
MIX Mixed Air Condition RML Return Miscellaneous Latent Gain

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 12

Air System #2 (Uma-03,04,05,06) Psychrometric Chart


RC Room Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain MR Return Side Miscellaneous Gain
PRE Pretreated Air Condition HRV Heat Recovery Ventilator Condition
MIX Mixed Air Condition RML Return Miscellaneous Latent Gain

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Blueroomsa S.A Hospital Padre Carollo
Guayaquil, Ecuador, Page 13

Air System #3 (Uma-03) Psychrometric Chart


RC Room Condition OC Outdoor Condition
LC Leaving Coil Condition EC Entering Coil Condition
SD Supply Duct Temperature Rise RD Return Duct Temperature Rise
DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain
RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain
SM Supply Side Miscellaneous Sensible Gain MR Return Side Miscellaneous Gain
PRE Pretreated Air Condition HRV Heat Recovery Ventilator Condition
MIX Mixed Air Condition RML Return Miscellaneous Latent Gain

D:\ ...\HPC.CH8 viernes, 26 de abril de 2019, 09:54 a. m.