Professional Documents
Culture Documents
Prepared By:
Check Figures
Total Building Supply Air (based on a 17° TD): 761 CFM
Total Building Vent. Air (100.00% of Supply): 761 CFM
Total Conditioned Air Space: 87 Sq.ft
Supply Air Per Unit Area: 8.7473 CFM/Sq.ft
Area Per Cooling Capacity: 21.1385 Sq.ft/Ton
Cooling Capacity Per Area: 0.0473 Tons/Sq.ft
Heating Capacity Per Area: 77.96 Btuh/Sq.ft
Total Heating Required With Outside Air: 6,786 Btuh
Total Cooling Required With Outside Air: 4.12 Tons
Check Figures
Total Air Handler Supply Air (based on a 17° TD): 761 CFM
Total Air Handler Vent. Air (100.00% of Supply): 761 CFM
Total Conditioned Air Space: 87 Sq.ft
Supply Air Per Unit Area: 8.7473 CFM/Sq.ft
Area Per Cooling Capacity: 21.1385 Sq.ft/Ton
Cooling Capacity Per Area: 0.0473 Tons/Sq.ft
Heating Capacity Per Area: 77.96 Btuh/Sq.ft
Total Heating Required With Outside Air: 6,786 Btuh
Total Cooling Required With Outside Air: 4.12 Tons
Partition - 9.27%
Air Handler
#1
Net Gain
49,411
Btuh
Wall - 11.64%
Heat. Vent. - 21.14%
Glass - 6.07%
Air Handler
#1
Loss 6,786
Btuh
Partition - 61.15%