You are on page 1of 33

Centro De Salud Capachica

HVAC Load Analysis


for

Gobierno Regional De Puno


Puno
Puno

Prepared By:

Emcap

viernes, 5 de mayo de 2023


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 2

Building Summary Loads


Building peaks in October at 5pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 4.179 75.299 23,95 0 25.270 25.270 27,54
Wall 1.541 24.916 7,93 0 -8.471 -8.471 -9,23
Glass 0 0 0,00 0 0 0 0,00
Floor Slab 0 0 0,00 0 0 0 0,00
Skin Loads 100.215 31,88 0 16.799 16.799 18,31
Lighting 5.202 0 0,00 0 19.527 19.527 21,28
Equipment 9.563 0 0,00 0 35.893 35.893 39,11
People 63 0 0,00 0 17.387 17.387 18,95
Partition 23.376 120.187 38,23 0 80.124 80.124 87,31
Cool. Pret. 0 0 0,00 0 0 0 0,00
Heat. Pret. 0 0 0,00 0 0 0 0,00
Cool. Vent. 6.969 0 0,00 0 -99.977 -99.977 -108,94
Heat. Vent. 1.452 57.244 18,21 0 0 0 0,00
Cool. Infil. 0 0 0,00 0 0 0 0,00
Heat. Infil. 0 0 0,00 0 0 0 0,00
Draw-Thru Fan 0 0 0,00 0 0 0 0,00
Blow-Thru Fan 0 0 0,00 0 10.263 10.263 11,18
Reserve Cap. 0 0 0,00 0 0 0 0,00
Reheat Cap. 0 0 0,00 0 0 0 0,00
Supply Duct 0 24.489 7,79 0 10.057 10.057 10,96
Return Duct 0 12.245 3,89 0 1.696 1.696 1,85
Misc. Supply 0 0 0,00 0 0 0 0,00
Misc. Return 0 0 0,00 0 0 0 0,00
Building Totals 314.380 100,00 0 91.770 91.770 100,00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 57.244 18,21 0 -99.977 -99.977 -108,94
Infiltration 0 0,00 0 0 0 0,00
Pretreated Air 0 0,00 0 0 0 0,00
Zone Loads 220.402 70,11 0 169.731 169.731 184,95
Plenum Loads 0 0,00 0 0 0 0,00
Fan/Duct/Misc Loads 36.734 11,68 0 22.017 22.017 23,99
Building Totals 314.380 100,00 0 91.770 91.770 100,00

Check Figures
Total Building Supply Air (based on a 19° TD): 10.516 CFM
Total Building Vent. Air (66,27% of Supply): 6.969 CFM
Total Conditioned Air Space: 4.433 Sq.ft
Supply Air Per Unit Area: 2,3723 CFM/Sq.ft
Area Per Cooling Capacity: 579,7 Sq.ft/Ton
Cooling Capacity Per Area: 0,0017 Tons/Sq.ft
Heating Capacity Per Area: 70,92 Btuh/Sq.ft
Total Heating Required With Outside Air: 314.380 Btuh
Total Cooling Required With Outside Air: 7,65 Tons

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 3

Air Handler #3 - Uma-Sala De Parto - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
1 Sala De Partos 363 19.549 18.634 1.760 2AC/Hr 100%
7pm October 8 1.157 1.052 0 119 0
3.570 3,19 2,90 0 119 1.052
Zone Peak Totals: 363 19.549 18.634 1.760
Total Zones: 1 8 1.157 1.052 0 119 0
Unique Zones: 1 3.570 3,19 2,90 0 119 1.052

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 4

Air Handler #3 - Uma-Sala De Parto - Total Load Summary


Air Handler Description: Uma-Sala De Parto Variable Air Volume
Supply Air Fan: Blow-Thru with program estimated horsepower of 0,55 HP
Fan Input: 75% motor and fan efficiency with 2,5 in. water across the fan
Sensible Heat Ratio: 0,92 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 5pm in October. Method for finding peak time: Adjusted (based on percent sensible capacity)
Outdoor Conditions: Clg: 60° DB, 46° WB, 30,96 grains, Htg: 33° DB
Indoor Conditions: Clg: 75° DB, 50% RH, Htg: 75° DB
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in October at 7pm is different from the
total system peak time, hence the air system CFM was computed using a zone sensible load of 18.634.
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 19.549 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 4.693 Btuh 119 CFM
Supply Duct sensible loss: 2.172 Btuh
Return Duct sensible loss: 1.086 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 27.500 Btuh
Heating Supply Air: 21.722 / (,869 X 1,08 X 20) = 1.157 CFM
Winter Vent Outside Air (10,3% of supply) = 119 CFM
Zone space sensible gain: 16.693 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 1.006 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 17.700 Btuh
Cooling Supply Air: 19.640 / (,869 X 1,1 X 20) = 1.052 CFM
Summer Vent Outside Air (100,0% of supply) = 1.052 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -15.094 Btuh 1.052 CFM
Blow-thru fan sensible gain: 1.218 Btuh
Total sensible gain on return side of coil: -13.877 Btuh
Total sensible gain on air handling system: 3.823 Btuh
Zone space latent gain: 1.760 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: -27.287 Btuh
Total latent gain on air handling system: -25.527 Btuh
Total system sensible and latent gain: -21.704 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 1.052 CFM
Total Air Handler Vent. Air (100,00% of Supply): 1.052 CFM
Total Conditioned Air Space: 363 Sq.ft
Supply Air Per Unit Area: 2,9003 CFM/Sq.ft
Area Per Cooling Capacity: 0,0 Sq.ft/Ton
Cooling Capacity Per Area: 0,0000 Tons/Sq.ft
Heating Capacity Per Area: 75,80 Btuh/Sq.ft
Total Heating Required With Outside Air: 27.500 Btuh
Total Cooling Required With Outside Air: 0,00 Tons
Note: Tonnages are 'adjusted' tons, based on percent sensible capacity of the air handler.
Note: Due to the system's negative latent gain, tonnage is based solely on sensible gain.

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 5

Air Handler #7 - Uma-100 % A.f. Atencion De Gestantes - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
2 Sala De Dilatacion 407 17.871 18.913 1.760 2AC/Hr 100%
7pm October 8 1.057 1.060 0 134 0
4.007 2,60 2,60 0 128 1.060

3 La Puerperio Enmediato 354 15.663 18.712 1.760 2AC/Hr 100%


7pm October 8 927 1.049 0 116 0
3.482 2,62 2,96 0 113 1.049

Atencion Recien
124 6.844 12.546 1.760 2AC/Hr 100%
4 Nacidos
8 405 703 0 41 0
7pm October
1.218 3,27 5,68 0 49 703

Zone Peak Totals: 885 40.379 50.172 5.280


Total Zones: 3 24 2.389 2.813 0 290 0
Unique Zones: 3 8.706 2,70 3,18 0 290 2.813

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 6

Air Handler #7 - Uma-100 % A.f. Atencion De Gestantes - Total Load Summary


Air Handler Description: Uma-100 % A.f. Atencion De Gestantes Variable Air Volume
Supply Air Fan: Blow-Thru with program estimated horsepower of 1,47 HP
Fan Input: 75% motor and fan efficiency with 2,5 in. water across the fan
Sensible Heat Ratio: 0,91 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 3pm in October. Method for finding peak time: Adjusted (based on percent sensible capacity)
Outdoor Conditions: Clg: 62° DB, 46° WB, 27,19 grains, Htg: 33° DB
Indoor Conditions: Clg: 75° DB, 50% RH, Htg: 75° DB
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in October at 7pm is different from the
total system peak time, hence the air system CFM was computed using a zone sensible load of 50.172.
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 40.379 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 11.445 Btuh 290 CFM
Supply Duct sensible loss: 4.487 Btuh
Return Duct sensible loss: 2.243 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 58.553 Btuh
Heating Supply Air: 44.865 / (,869 X 1,08 X 20) = 2.389 CFM
Winter Vent Outside Air (12,1% of supply) = 290 CFM
Zone space sensible gain: 42.577 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 2.690 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 45.267 Btuh
Cooling Supply Air: 52.862 / (,869 X 1,1 X 20) = 2.813 CFM
Summer Vent Outside Air (100,0% of supply) = 2.813 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -34.972 Btuh 2.813 CFM
Blow-thru fan sensible gain: 3.255 Btuh
Total sensible gain on return side of coil: -31.717 Btuh
Total sensible gain on air handling system: 13.550 Btuh
Zone space latent gain: 5.280 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: -78.193 Btuh
Total latent gain on air handling system: -72.913 Btuh
Total system sensible and latent gain: -59.362 Btuh

Check Figures
Total Air Handler Supply Air (based on a 20° TD): 2.813 CFM
Total Air Handler Vent. Air (100,00% of Supply): 2.813 CFM
Total Conditioned Air Space: 885 Sq.ft
Supply Air Per Unit Area: 3,1780 CFM/Sq.ft
Area Per Cooling Capacity: 0,0 Sq.ft/Ton
Cooling Capacity Per Area: 0,0000 Tons/Sq.ft
Heating Capacity Per Area: 66,15 Btuh/Sq.ft
Total Heating Required With Outside Air: 58.553 Btuh
Total Cooling Required With Outside Air: 0,00 Tons
Note: Tonnages are 'adjusted' tons, based on percent sensible capacity of the air handler.
Note: Due to the system's negative latent gain, tonnage is based solely on sensible gain.

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 7

Air Handler #8 - Uma 100% Aire Fresco At. Urg. Emerg. - Summary Loads
Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
Obs. Emerg Hombre
192 11.266 6.077 414 2AC/Hr 100%
5 Mujeres
2 667 350 0 61 0
7pm October
1.820 3,47 1,82 0 68 350

6 Obs. Emerg NiÑos 180 10.673 6.435 387 2AC/Hr 100%


7pm October 2 632 371 0 59 0
1.766 3,52 2,07 0 65 371

Tipico Urgencias
264 12.019 10.534 568 2AC/Hr 100%
7 Emergencias
3 711 607 0 86 0
7pm October
2.593 2,70 2,30 0 73 607

Zone Peak Totals: 635 33.958 23.046 1.370


Total Zones: 3 6 2.009 1.328 0 206 0
Unique Zones: 3 6.180 3,16 2,09 0 206 1.328

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 8

Air Handler #8 - Uma 100% Aire Fresco At. Urg. Emerg. - Total Load Summary
Air Handler Description: Uma 100% Aire Fresco At. Urg. Emerg. Variable Air Volume
Supply Air Fan: Blow-Thru with program estimated horsepower of 0,70 HP
Fan Input: 75% motor and fan efficiency with 2,5 in. water across the fan
Sensible Heat Ratio: 0,94 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 5pm in October.
Outdoor Conditions: Clg: 60° DB, 46° WB, 30,96 grains, Htg: 33° DB
Indoor Conditions: Clg: 75° DB, 50% RH, Htg: 75° DB
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in October at 7pm is different from the
total system peak time, hence the air system CFM was computed using a zone sensible load of 23.046.
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 33.958 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 8.123 Btuh 206 CFM
Supply Duct sensible loss: 3.773 Btuh
Return Duct sensible loss: 1.887 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 47.741 Btuh
Heating Supply Air: 37.731 / (,869 X 1,08 X 20) = 2.009 CFM
Winter Vent Outside Air (10,3% of supply) = 206 CFM
Zone space sensible gain: 20.279 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 1.270 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 21.549 Btuh
Cooling Supply Air: 24.316 / (,869 X 1,1 X 19) = 1.328 CFM
Summer Vent Outside Air (100,0% of supply) = 1.328 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -19.053 Btuh 1.328 CFM
Blow-thru fan sensible gain: 1.537 Btuh
Total sensible gain on return side of coil: -17.516 Btuh
Total sensible gain on air handling system: 4.033 Btuh
Zone space latent gain: 1.370 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: -34.443 Btuh
Total latent gain on air handling system: -33.073 Btuh
Total system sensible and latent gain: -29.040 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1.328 CFM
Total Air Handler Vent. Air (100,00% of Supply): 1.328 CFM
Total Conditioned Air Space: 635 Sq.ft
Supply Air Per Unit Area: 2,0915 CFM/Sq.ft
Area Per Cooling Capacity: 1.889,6 Sq.ft/Ton
Cooling Capacity Per Area: 0,0005 Tons/Sq.ft
Heating Capacity Per Area: 75,18 Btuh/Sq.ft
Total Heating Required With Outside Air: 47.741 Btuh
Total Cooling Required With Outside Air: 0,34 Tons
Note: Due to the system's negative latent gain, tonnage is based solely on sensible gain.

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 9

Air Handler #9 - Uma 100% Frs. Upss Patologia Clin. - Summary Loads
Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
Laboratorio De
Hematologia Y 250 13.937 8.228 539 2AC/Hr 100%
8 Bioquimica 2 825 472 0 82 0
7pm November 2.459 3,30 1,89 0 90 472

Toma De Muestras Y
182 5.677 6.061 392 2AC/Hr 100%
9 Entrega De Resultados
2 336 348 0 60 0
7pm December
1.788 1,85 1,91 0 37 348

Laboratorio De
170 10.956 5.517 366 2AC/Hr 100%
10 Microbiologia
2 648 317 0 56 0
7pm November
1.669 3,82 1,87 0 71 317

Zone Peak Totals: 601 30.570 19.806 1.297


Total Zones: 3 6 1.809 1.137 0 197 0
Unique Zones: 3 5.916 3,01 1,89 0 197 1.137

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 10

Air Handler #9 - Uma 100% Frs. Upss Patologia Clin. - Total Load Summary
Air Handler Description: Uma 100% Frs. Upss Patologia Clin. Variable Air Volume
Supply Air Fan: Blow-Thru with program estimated horsepower of 0,60 HP
Fan Input: 75% motor and fan efficiency with 2,5 in. water across the fan
Sensible Heat Ratio: 0,94 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 5pm in October.
Outdoor Conditions: Clg: 60° DB, 46° WB, 30,96 grains, Htg: 33° DB
Indoor Conditions: Clg: 75° DB, 50% RH, Htg: 75° DB
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in November at 7pm is different from the
total system peak time, hence the air system CFM was computed using a zone sensible load of 19.806.
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 30.570 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 7.777 Btuh 197 CFM
Supply Duct sensible loss: 3.397 Btuh
Return Duct sensible loss: 1.698 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 43.442 Btuh
Heating Supply Air: 33.966 / (,869 X 1,08 X 20) = 1.809 CFM
Winter Vent Outside Air (10,9% of supply) = 197 CFM
Zone space sensible gain: 18.319 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 1.087 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 19.406 Btuh
Cooling Supply Air: 20.894 / (,869 X 1,1 X 19) = 1.137 CFM
Summer Vent Outside Air (100,0% of supply) = 1.137 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -16.309 Btuh 1.137 CFM
Blow-thru fan sensible gain: 1.316 Btuh
Total sensible gain on return side of coil: -14.993 Btuh
Total sensible gain on air handling system: 4.413 Btuh
Zone space latent gain: 1.297 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: -29.482 Btuh
Total latent gain on air handling system: -28.185 Btuh
Total system sensible and latent gain: -23.773 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1.137 CFM
Total Air Handler Vent. Air (100,00% of Supply): 1.137 CFM
Total Conditioned Air Space: 601 Sq.ft
Supply Air Per Unit Area: 1,8909 CFM/Sq.ft
Area Per Cooling Capacity: 1.634,9 Sq.ft/Ton
Cooling Capacity Per Area: 0,0006 Tons/Sq.ft
Heating Capacity Per Area: 72,26 Btuh/Sq.ft
Total Heating Required With Outside Air: 43.442 Btuh
Total Cooling Required With Outside Air: 0,37 Tons
Note: Due to the system's negative latent gain, tonnage is based solely on sensible gain.

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 11

Air Handler #10 - Uma Rtorn. Consulta Externa Z1 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
Consulta Cred/sala De
340 18.144 9.782 733 2AC/Hr 2AC/Hr
11 Estimulacion T.
3 1.074 564 0 111 111
7pm October
3.342 3,16 1,66 0 113 89

12 Sala De Inmunizaciones 155 9.471 5.293 334 2AC/Hr 2AC/Hr


7pm October 2 560 305 0 51 51
1.523 3,62 1,97 0 59 48

Consultorio De
Medicina General 183 9.032 7.774 395 2AC/Hr 2AC/Hr
13 Telecons 2 534 448 0 60 60
7pm October 1.803 2,92 2,45 0 56 70

14 Topico 190 9.483 8.114 411 2AC/Hr 2AC/Hr


7pm October 2 561 468 0 62 62
1.874 2,95 2,46 0 59 73

15 Triaje 184 9.061 7.139 396 2AC/Hr 2AC/Hr


7pm October 2 536 411 0 60 60
1.807 2,92 2,24 0 57 65
Zone Peak Totals: 1.052 55.192 38.103 2.268
Total Zones: 5 10 3.266 2.196 0 345 345
Unique Zones: 5 10.348 3,11 2,09 0 345 345

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 12

Air Handler #10 - Uma Rtorn. Consulta Externa Z1 - Total Load Summary
Air Handler Description: Uma Rtorn. Consulta Externa Z1 Variable Air Volume
Supply Air Fan: Blow-Thru with program estimated horsepower of 0,29 HP
Fan Input: 60% motor and fan efficiency with 0,5 in. water across the fan
Sensible Heat Ratio: 0,94 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 7pm in October.
Outdoor Conditions: Clg: 54° DB, 44° WB, 34,12 grains, Htg: 33° DB
Indoor Conditions: Clg: 75° DB, 50% RH, Htg: 75° DB
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 55.192 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 13.603 Btuh 345 CFM
Supply Duct sensible loss: 6.132 Btuh
Return Duct sensible loss: 3.066 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 77.994 Btuh
Heating Supply Air: 61.324 / (,869 X 1,08 X 20) = 3.266 CFM
Winter Vent Outside Air (10,6% of supply) = 345 CFM
Zone space sensible gain: 38.103 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 2.100 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 40.203 Btuh
Cooling Supply Air: 40.203 / (,869 X 1,1 X 19) = 2.196 CFM
Summer Vent Outside Air (15,7% of supply) = 345 CFM
Return duct sensible gain: 885 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -6.928 Btuh 345 CFM
Blow-thru fan sensible gain: 635 Btuh
Total sensible gain on return side of coil: -5.407 Btuh
Total sensible gain on air handling system: 34.795 Btuh
Zone space latent gain: 2.268 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: -8.449 Btuh
Total latent gain on air handling system: -6.180 Btuh
Total system sensible and latent gain: 28.615 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 2.196 CFM
Total Air Handler Vent. Air (15,71% of Supply): 345 CFM
Total Conditioned Air Space: 1.052 Sq.ft
Supply Air Per Unit Area: 2,0879 CFM/Sq.ft
Area Per Cooling Capacity: 362,7 Sq.ft/Ton
Cooling Capacity Per Area: 0,0028 Tons/Sq.ft
Heating Capacity Per Area: 74,16 Btuh/Sq.ft
Total Heating Required With Outside Air: 77.994 Btuh
Total Cooling Required With Outside Air: 2,90 Tons
Note: Due to the system's negative latent gain, tonnage is based solely on sensible gain.

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 13

Air Handler #11 - Uma Rtorn. Consulta Externa Z2 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
Consultorio De
340 14.853 11.615 733 2AC/Hr 2AC/Hr
16 Obstetricia (ctrl Natal)
3 879 671 0 111 111
7pm October
3.342 2,59 1,98 0 107 99

Consultorio De
Psicologia Y Aic De 155 7.966 6.790 333 2AC/Hr 2AC/Hr
17 Adole 2 471 392 0 51 51
7pm October 1.521 3,05 2,54 0 58 58

Consultorio Notricion
183 9.018 7.762 394 2AC/Hr 2AC/Hr
18 Amb. Para El Prog.
2 534 448 0 60 60
7pm October
1.799 2,92 2,45 0 65 66

19 Odontologia 220 8.917 8.293 474 2AC/Hr 2AC/Hr


7pm October 2 528 479 0 72 72
2.164 2,40 2,18 0 64 71
Zone Peak Totals: 897 40.755 34.459 1.935
Total Zones: 4 9 2.411 1.990 0 294 294
Unique Zones: 4 8.827 2,69 2,22 0 294 294

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 14

Air Handler #11 - Uma Rtorn. Consulta Externa Z2 - Total Load Summary
Air Handler Description: Uma Rtorn. Consulta Externa Z2 Constant Volume - Sum of Peaks
Supply Air Fan: Blow-Thru with program estimated horsepower of 1,04 HP
Fan Input: 75% motor and fan efficiency with 2,5 in. water across the fan
Sensible Heat Ratio: 0,95 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 7pm in October.
Outdoor Conditions: Clg: 54° DB, 44° WB, 34,12 grains, Htg: 33° DB
Indoor Conditions: Clg: 75° DB, 50% RH, Htg: 75° DB
Summer: Ventilation controls outside air, ----- Winter: Ventilation controls outside air.
Zone Space sensible loss: 40.755 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 11.603 Btuh 294 CFM
Supply Duct sensible loss: 4.528 Btuh
Return Duct sensible loss: 2.264 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 59.150 Btuh
Heating Supply Air: 45.283 / (,869 X 1,08 X 20) = 2.411 CFM
Winter Vent Outside Air (12,2% of supply) = 294 CFM
Zone space sensible gain: 34.459 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 1.903 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 36.362 Btuh
Cooling Supply Air: 36.362 / (,869 X 1,1 X 19) = 1.990 CFM
Summer Vent Outside Air (14,8% of supply) = 294 CFM
Return duct sensible gain: 811 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: -5.909 Btuh 294 CFM
Blow-thru fan sensible gain: 2.303 Btuh
Total sensible gain on return side of coil: -2.795 Btuh
Total sensible gain on air handling system: 33.567 Btuh
Zone space latent gain: 1.935 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: -7.206 Btuh
Total latent gain on air handling system: -5.272 Btuh
Total system sensible and latent gain: 28.295 Btuh

Check Figures
Total Air Handler Supply Air (based on a 19° TD): 1.990 CFM
Total Air Handler Vent. Air (14,78% of Supply): 294 CFM
Total Conditioned Air Space: 897 Sq.ft
Supply Air Per Unit Area: 2,2187 CFM/Sq.ft
Area Per Cooling Capacity: 320,7 Sq.ft/Ton
Cooling Capacity Per Area: 0,0031 Tons/Sq.ft
Heating Capacity Per Area: 65,94 Btuh/Sq.ft
Total Heating Required With Outside Air: 59.150 Btuh
Total Cooling Required With Outside Air: 2,80 Tons
Note: Due to the system's negative latent gain, tonnage is based solely on sensible gain.

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 15

Zone Detailed Loads (At Zone Peak Times)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 1-Sala De Partos peaks (sensible) in October at 7pm, Air Handler 3 (Uma-Sala De Parto), Group 0,
24,2 x 15,0, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 363 1,00 21,1 0,390 2.985 16,380 5.943
Wall-1-WNW-C-M 333 0,83 -10,3 0,350 -1.200 14,700 4.892
Partition-2-1 216,7398 10/15 0,310 672 4,650 1.008
Partition-3-1 332,8209 10/15 0,310 1.032 4,650 1.548
Partition-4-1 216,7398 10/15 0,310 672 4,650 1.008
Partition-5-1 362,7917 10/15 0,310 1.125 4,650 1.687
Partition-6-1 362,7917 10/15 0,310 1.125 4,650 1.687
Lights-Prof=2 1.000 1,000 3.412
Equipment-Prof=3 1.500 1,000 5.118 0
People-Prof=1 8,0 1,000 2.000 1.600
Sub-total 16.940 1.600 17.772
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 18.634 1.760 19.549

Zone 2-Sala De Dilatacion peaks (sensible) in October at 7pm, Air Handler 7 (Uma-100 % A.f. Atencion
De Gestantes), Group 0, 27,1 x 15,0, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 407 1,00 21,1 0,390 3.350 16,380 6.670
Partition-1-3 373,5801 10/15 0,320 1.195 4,800 1.793
Partition-2-3 216,7398 10/15 0,320 694 4,800 1.040
Partition-3-3 373,5801 10/15 0,320 1.195 4,800 1.793
Partition-4-3 216,7398 10/15 0,320 694 4,800 1.040
Partition-5-3 407,2213 10/15 0,320 1.303 4,800 1.955
Partition-6-3 407,2213 10/15 0,320 1.303 4,800 1.955
Lights-Prof=2 100 1,000 341
Equipment-Prof=3 1.500 1,000 5.118 0
People-Prof=1 8,0 1,000 2.000 1.600
Sub-total 17.194 1.600 16.247
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 18.913 1.760 17.871

Zone 3-La Puerperio Enmediato peaks (sensible) in October at 7pm, Air Handler 7 (Uma-100 % A.f.
Atencion De Gestantes), Group 0, 22,0 x 16,1, Construction Type: 19 (Light)
Roof-1-8-No.Clg-D 354 1,00 21,1 0,390 2.914 16,380 5.802
Partition-1-3 303,4908 10/15 0,320 971 4,800 1.457
Partition-2-3 221,2839 10/15 0,320 708 4,800 1.062
Partition-3-3 303,4908 10/15 0,320 971 4,800 1.457
Partition-4-3 221,2839 10/15 0,320 708 4,800 1.062
Partition-5-3 354,1828 10/15 0,320 1.133 4,800 1.700
Partition-6-3 354,1828 10/15 0,320 1.133 4,800 1.700
Lights-Prof=2 397 1,000 1.354
Equipment-Prof=3 1.500 1,000 5.118 0
People-Prof=1 8,0 1,000 2.000 1.600
Sub-total 17.011 1.600 14.240
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 18.712 1.760 15.663

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 16

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 4-Atencion Recien Nacidos peaks (sensible) in October at 7pm, Air Handler 7 (Uma-100 % A.f.
Atencion De Gestantes), Group 0, 7,7 x 16,1, Construction Type: 19 (Light)
Roof-1-8-No.Clg-D 124 1,00 21,1 0,390 1.018 16,380 2.027
Partition-1-1 106,029 10/15 0,310 329 4,650 493
Partition-2-1 221,2839 10/15 0,310 686 4,650 1.029
Partition-3-1 106,029 10/15 0,310 329 4,650 493
Partition-4-1 221,2839 10/15 0,310 686 4,650 1.029
Partition-5-1 123,739 10/15 0,310 384 4,650 575
Partition-6-1 123,739 10/15 0,310 384 4,650 575
Lights-Prof=2 139 1,000 473
Equipment-Prof=3 1.500 1,000 5.118 0
People-Prof=1 8,0 1,000 2.000 1.600
Sub-total 11.406 1.600 6.222
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 12.546 1.760 6.844

Zone 5-Obs. Emerg Hombre Mujeres peaks (sensible) in October at 7pm, Air Handler 8 (Uma 100% Aire
Fresco At. Urg. Emerg.), Group 0, 12,6 x 15,2, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 192 1,00 21,1 0,390 1.579 16,380 3.145
Wall-1-WNW-C-M 174 0,83 -10,3 0,350 -627 14,700 2.557
Partition-2-1 209,304 10/15 0,310 649 4,650 973
Partition-3-1 173,9151 10/15 0,310 539 4,650 809
Partition-4-1 209,304 10/15 0,310 649 4,650 973
Partition-5-1 191,976 10/15 0,310 595 4,650 893
Partition-6-1 191,976 10/15 0,310 595 4,650 893
Lights-Prof=2 215 1,000 734
Equipment-Prof=3 100 1,000 341 0
People-Prof=1 1,9 1,000 471 376
Sub-total 5.525 376 10.242
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 6.077 414 11.266

Zone 6-Obs. Emerg NiÑos peaks (sensible) in October at 7pm, Air Handler 8 (Uma 100% Aire Fresco At.
Urg. Emerg.), Group 0, 11,8 x 15,2, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 180 1,00 21,1 0,390 1.477 16,380 2.940
Wall-1-WNW-C-M 163 0,83 -10,3 0,350 -586 14,700 2.391
Partition-2-1 209,304 10/15 0,310 649 4,650 973
Partition-3-1 162,6237 10/15 0,310 504 4,650 756
Partition-4-1 209,304 10/15 0,310 649 4,650 973
Partition-5-1 179,512 10/15 0,310 556 4,650 835
Partition-6-1 179,512 10/15 0,310 556 4,650 835
Lights-Prof=2 201 1,000 686
Equipment-Prof=3 269 1,000 919 0
People-Prof=1 1,8 1,000 440 352
Sub-total 5.850 352 9.703
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 6.435 387 10.673

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 17

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 7-Tipico Urgencias Emergencias peaks (sensible) in October at 7pm, Air Handler 8 (Uma 100% Aire
Fresco At. Urg. Emerg.), Group 0, 16,4 x 16,1, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 264 1,00 21,1 0,390 2.168 16,380 4.317
Partition-1-1 225,828 10/15 0,310 700 4,650 1.050
Partition-2-1 221,2839 10/15 0,310 686 4,650 1.029
Partition-3-1 225,828 10/15 0,310 700 4,650 1.050
Partition-4-1 221,2839 10/15 0,310 686 4,650 1.029
Partition-5-1 263,548 10/15 0,310 817 4,650 1.225
Partition-6-1 263,548 10/15 0,310 817 4,650 1.225
Lights-Prof=2 295 1,000 1.007
Equipment-Prof=3 395 1,000 1.349 0
People-Prof=1 2,6 1,000 646 517
Sub-total 9.576 517 10.926
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 10.534 568 12.019

Zone 8-Laboratorio De Hematologia Y Bioquimica peaks (sensible) in November at 7pm, Air Handler 9
(Uma 100% Frs. Upss Patologia Clin.), Group 0, 15,9 x 15,7, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 250 1,00 19,8 0,390 1.928 16,380 4.094
Wall-1-SE-C-M 219 0,83 -11,3 0,350 -865 14,700 3.220
Partition-2-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-3-1 219,0807 10/15 0,310 679 4,650 1.019
Partition-4-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-5-1 249,9461 10/15 0,310 775 4,650 1.162
Partition-6-1 249,9461 10/15 0,310 775 4,650 1.162
Lights-Prof=2 280 1,000 955
Equipment-Prof=3 375 1,000 1.279 0
People-Prof=1 2,5 1,000 613 490
Sub-total 7.480 490 12.670
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 8.228 539 13.937

Zone 9-Toma De Muestras Y Entrega De Resultados peaks (sensible) in December at 7pm, Air Handler 9
(Uma 100% Frs. Upss Patologia Clin.), Group 0, 15,0 x 12,1, Construction Type: 1 (Light)
Partition-1-1 206,4123 10/15 0,310 640 4,650 960
Partition-2-1 166,8924 10/15 0,310 517 4,650 776
Partition-3-1 206,4123 10/15 0,310 640 4,650 960
Partition-4-1 166,8924 10/15 0,310 517 4,650 776
Partition-5-1 181,6788 10/15 0,310 563 4,650 845
Partition-6-1 181,6788 10/15 0,310 563 4,650 845
Lights-Prof=2 203 1,000 694
Equipment-Prof=3 273 1,000 930 0
People-Prof=1 1,8 1,000 445 356
Sub-total 5.510 356 5.161
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 6.061 392 5.677

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 18

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 10-Laboratorio De Microbiologia peaks (sensible) in November at 7pm, Air Handler 9 (Uma 100%
Frs. Upss Patologia Clin.), Group 0, 15,9 x 10,7, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 170 1,00 19,8 0,390 1.308 16,380 2.778
Wall-1-SE-C-M 219 0,83 -11,3 0,350 -865 14,700 3.220
Partition-2-1 146,7882 10/15 0,310 455 4,650 683
Partition-3-1 219,0807 10/15 0,310 679 4,650 1.019
Partition-4-1 146,7882 10/15 0,310 455 4,650 683
Partition-5-1 169,6006 10/15 0,310 526 4,650 789
Partition-6-1 169,6006 10/15 0,310 526 4,650 789
Lights-Prof=2 190 1,000 648
Equipment-Prof=3 254 1,000 868 0
People-Prof=1 1,7 1,000 416 333
Sub-total 5.016 333 9.960
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 5.517 366 10.956

Zone 11-Consulta Cred/sala De Estimulacion T. peaks (sensible) in October at 7pm, Air Handler 10 (Uma
Rtorn. Consulta Externa Z1), Group 0, 21,6 x 15,7, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 340 1,00 21,1 0,390 2.794 16,380 5.563
Wall-1-NE-C-M 298 0,83 -10,4 0,350 -1.084 14,700 4.376
Partition-2-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-3-1 297,7074 10/15 0,310 923 4,650 1.384
Partition-4-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-5-1 339,6502 10/15 0,310 1.053 4,650 1.579
Partition-6-1 339,6502 10/15 0,310 1.053 4,650 1.579
Lights-Prof=2 380 1,000 1.298
Equipment-Prof=3 200 1,000 682 0
People-Prof=1 3,3 1,000 832 666
Sub-total 8.893 666 16.495
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 9.782 733 18.144

Zone 12-Sala De Inmunizaciones peaks (sensible) in October at 7pm, Air Handler 10 (Uma Rtorn.
Consulta Externa Z1), Group 0, 9,9 x 15,7, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 155 1,00 21,1 0,390 1.273 16,380 2.535
Wall-1-NE-C-M 136 0,83 -10,4 0,350 -494 14,700 1.994
Partition-2-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-3-1 135,6345 10/15 0,310 420 4,650 631
Partition-4-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-5-1 154,7435 10/15 0,310 480 4,650 720
Partition-6-1 154,7435 10/15 0,310 480 4,650 720
Lights-Prof=2 173 1,000 591
Equipment-Prof=3 100 1,000 341 0
People-Prof=1 1,5 1,000 379 303
Sub-total 4.812 303 8.610
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 5.293 334 9.471

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 19

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 13-Consultorio De Medicina General Telecons peaks (sensible) in October at 7pm, Air Handler 10
(Uma Rtorn. Consulta Externa Z1), Group 0, 11,6 x 15,7, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 183 1,00 21,1 0,390 1.507 16,380 3.001
Partition-1-1 160,2828 10/15 0,310 497 4,650 745
Partition-2-1 216,7398 10/15 0,310 672 4,650 1.008
Partition-3-1 160,2828 10/15 0,310 497 4,650 745
Partition-4-1 216,7398 10/15 0,310 672 4,650 1.008
Partition-5-1 183,2136 10/15 0,310 568 4,650 852
Partition-6-1 183,2136 10/15 0,310 568 4,650 852
Lights-Prof=2 205 1,000 700
Equipment-Prof=3 275 1,000 938 0
People-Prof=1 1,8 1,000 449 359
Sub-total 7.068 359 8.211
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 7.774 395 9.032

Zone 14-Topico peaks (sensible) in October at 7pm, Air Handler 10 (Uma Rtorn. Consulta Externa Z1),
Group 0, 12,1 x 15,7, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 201 1,00 21,1 0,390 1.650 16,380 3.285
Partition-1-1 166,617 10/15 0,310 517 4,650 775
Partition-2-1 216,7398 10/15 0,310 672 4,650 1.008
Partition-3-1 166,617 10/15 0,310 517 4,650 775
Partition-4-1 216,7398 10/15 0,310 672 4,650 1.008
Partition-5-1 190,454 10/15 0,310 590 4,650 886
Partition-6-1 190,454 10/15 0,310 590 4,650 886
Lights-Prof=2 213 1,000 728
Equipment-Prof=3 286 1,000 975 0
People-Prof=1 1,9 1,000 467 373
Sub-total 7.377 373 8.621
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 8.114 411 9.483

Zone 15-Triaje peaks (sensible) in October at 7pm, Air Handler 10 (Uma Rtorn. Consulta Externa Z1),
Group 0, 11,7 x 15,7, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 184 1,00 21,1 0,390 1.511 16,380 3.008
Partition-1-1 161,2467 10/15 0,310 500 4,650 750
Partition-2-1 216,7398 10/15 0,310 672 4,650 1.008
Partition-3-1 161,2467 10/15 0,310 500 4,650 750
Partition-4-1 216,7398 10/15 0,310 672 4,650 1.008
Partition-5-1 184,3154 10/15 0,310 571 4,650 857
Partition-6-1 184,3154 10/15 0,310 571 4,650 857
Lights-Prof=2 206 1,000 702
Equipment-Prof=3 100 1,000 341 0
People-Prof=1 1,8 1,000 450 360
Sub-total 6.490 360 8.237
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 7.139 396 9.061

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 20

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 16-Consultorio De Obstetricia (ctrl Natal) peaks (sensible) in October at 7pm, Air Handler 11 (Uma
Rtorn. Consulta Externa Z2), Group 0, 21,6 x 15,7, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 340 1,00 21,1 0,390 2.794 16,380 5.563
Partition-1-1 297,7074 10/15 0,310 923 4,650 1.384
Partition-2-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-3-1 297,7074 10/15 0,310 923 4,650 1.384
Partition-4-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-5-1 339,6502 10/15 0,310 1.053 4,650 1.579
Partition-6-1 339,6502 10/15 0,310 1.053 4,650 1.579
Lights-Prof=2 380 1,000 1.298
Equipment-Prof=3 100 1,000 341 0
People-Prof=1 3,3 1,000 832 666
Sub-total 10.559 666 13.503
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 11.615 733 14.853

Zone 17-Consultorio De Psicologia Y Aic De Adole peaks (sensible) in October at 7pm, Air Handler 11
(Uma Rtorn. Consulta Externa Z2), Group 0, 9,8 x 15,7, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 155 1,00 21,1 0,390 1.272 16,380 2.532
Partition-1-1 135,4968 10/15 0,310 420 4,650 630
Partition-2-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-3-1 135,4968 10/15 0,310 420 4,650 630
Partition-4-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-5-1 154,5864 10/15 0,310 479 4,650 719
Partition-6-1 154,5864 10/15 0,310 479 4,650 719
Lights-Prof=2 173 1,000 591
Equipment-Prof=3 232 1,000 791 0
People-Prof=1 1,5 1,000 379 303
Sub-total 6.172 303 7.242
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 6.790 333 7.966

Zone 18-Consultorio Notricion Amb. Para El Prog. peaks (sensible) in October at 7pm, Air Handler 11
(Uma Rtorn. Consulta Externa Z2), Group 0, 11,6 x 15,7, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 183 1,00 21,1 0,390 1.504 16,380 2.995
Partition-1-1 160,2828 10/15 0,310 497 4,650 745
Partition-2-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-3-1 160,2828 10/15 0,310 497 4,650 745
Partition-4-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-5-1 182,8644 10/15 0,310 567 4,650 850
Partition-6-1 182,8644 10/15 0,310 567 4,650 850
Lights-Prof=2 205 1,000 699
Equipment-Prof=3 274 1,000 936 0
People-Prof=1 1,8 1,000 448 359
Sub-total 7.056 359 8.198
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 7.762 394 9.018

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 21

Zone Detailed Loads (At Zone Peak Times) (cont'd)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 19-Odontologia peaks (sensible) in October at 7pm, Air Handler 11 (Uma Rtorn. Consulta Externa
Z2), Group 0, 14,0 x 15,7, Construction Type: 1 (Light)
Roof-1-8-No.Clg-D 138 1,00 21,1 0,390 1.133 16,380 2.257
Partition-1-1 192,78 10/15 0,310 598 4,650 896
Partition-2-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-3-1 192,78 10/15 0,310 598 4,650 896
Partition-4-1 216,3267 10/15 0,310 671 4,650 1.006
Partition-5-1 219,94 10/15 0,310 682 4,650 1.023
Partition-6-1 219,94 10/15 0,310 682 4,650 1.023
Lights-Prof=2 246 1,000 841
Equipment-Prof=3 330 1,000 1.126 0
People-Prof=1 2,2 1,000 539 431
Sub-total 7.539 431 8.107
Safety factors: +10% +10% +10%
--------- --------- ---------
Total w/ safety factors: 8.293 474 8.917

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 22

Air System #3 (Uma-Sala De Parto) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 71,687 55,482
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 1.006 1,000 54
Zone Loads 1.760 2,829 18.634 18,517 998
Sensible Reserve 0 0,000 0
Zone Condition 1.760 29,503 19.640 75,000 1.052
Return Air Duct 0 0,000
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 1.052 CFM -27.287 -43,866 -15.094 -15,000
Blow-Thru Fan 1.218 1,210
Entering Coil Condition -25.527 30,651 5.763 61,210 1.052

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 1.052 x( 61,210 - 55,482 )= 5.764 Btuh


TLH = 0,869 x 0,68 x 1.052 x( 30,651 - 71,687 )= -25.527 Btuh
----------
SUM = -19.764 Btuh
GTH = 0,869 x 4,50 x 1.052 x( 19,456 - 24,436 )= -20.500 Btuh
Total System Load = -21.704 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = -20.500 / ( 10,00 x 500 ) = -4,1 GPM
Heating GPM = 27.500 / ( 20,00 x 500 ) = 2,8 GPM
Steam Req. = 27.500 / 970 = 28,4 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 61,21 Dry bulb temperature: 69,78
Wet bulb temperature: 46,53
Relative humidity: 33,38
Enthalpy: 19,46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,48 Dry bulb temperature: 95,00
Wet bulb temperature: 54,60
Relative humidity: 95,00
Enthalpy: 24,44 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 23

Air System #3 (Uma-Sala De Parto) Psychrometric Analysis (G)


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 71,687 55,482
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 1.006 1,000 54
Zone Loads 1.760 2,829 18.634 18,517 998
Sensible Reserve 0 0,000 0
Zone Condition 1.760 29,503 19.640 75,000 1.052
Return Air Duct 0 0,000
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 1.052 CFM -27.287 -43,866 -15.094 -15,000
Blow-Thru Fan 1.218 1,210
Entering Coil Condition -25.527 30,651 5.763 61,210 1.052

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 1.052 x( 61,210 - 55,482 )= 5.764 Btuh


TLH = 0,869 x 0,68 x 1.052 x( 30,651 - 71,687 )= -25.527 Btuh
----------
SUM = -19.764 Btuh
GTH = 0,869 x 4,50 x 1.052 x( 19,456 - 24,436 )= -20.500 Btuh
Total System Load = -21.704 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = -20.500 / ( 10,00 x 500 ) = -4,1 GPM
Heating GPM = 27.500 / ( 20,00 x 500 ) = 2,8 GPM
Steam Req. = 27.500 / 970 = 28,4 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 61,21 Dry bulb temperature: 69,78
Wet bulb temperature: 46,53
Relative humidity: 33,38
Enthalpy: 19,46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,48 Dry bulb temperature: 95,00
Wet bulb temperature: 54,60
Relative humidity: 95,00
Enthalpy: 24,44 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 24

Air System #7 (Uma-100 % A.f. Atencion De Gestantes) Psychrometric


Analysis
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 71,337 55,350
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 2.690 1,000 143
Zone Loads 5.280 3,175 50.172 18,650 2.670
Sensible Reserve 0 0,000 0
Zone Condition 5.280 22,090 52.862 75,000 2.813
Return Air Duct 0 0,000
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 2.813 CFM -78.193 -47,016 -34.972 -13,000
Blow-Thru Fan 3.255 1,210
Entering Coil Condition -72.913 27,496 21.145 63,210 2.813

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 2.813 x( 63,210 - 55,350 )= 21.146 Btuh


TLH = 0,869 x 0,68 x 2.813 x( 27,496 - 71,337 )= -72.907 Btuh
----------
SUM = -51.761 Btuh
GTH = 0,869 x 4,50 x 2.813 x( 19,449 - 24,349 )= -53.925 Btuh
Total System Load = -59.362 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = -53.925 / ( 10,00 x 500 ) = -10,8 GPM
Heating GPM = 58.553 / ( 20,00 x 500 ) = 5,9 GPM
Steam Req. = 58.553 / 970 = 60,4 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 63,21 Dry bulb temperature: 69,02
Wet bulb temperature: 46,53
Relative humidity: 27,92
Enthalpy: 19,45 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,35 Dry bulb temperature: 95,00
Wet bulb temperature: 54,47
Relative humidity: 95,00
Enthalpy: 24,35 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 25

Air System #7 (Uma-100 % A.f. Atencion De Gestantes) Psychrometric


Analysis (G)
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 71,337 55,350
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 2.690 1,000 143
Zone Loads 5.280 3,175 50.172 18,650 2.670
Sensible Reserve 0 0,000 0
Zone Condition 5.280 22,090 52.862 75,000 2.813
Return Air Duct 0 0,000
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 2.813 CFM -78.193 -47,016 -34.972 -13,000
Blow-Thru Fan 3.255 1,210
Entering Coil Condition -72.913 27,496 21.145 63,210 2.813

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 2.813 x( 63,210 - 55,350 )= 21.146 Btuh


TLH = 0,869 x 0,68 x 2.813 x( 27,496 - 71,337 )= -72.907 Btuh
----------
SUM = -51.761 Btuh
GTH = 0,869 x 4,50 x 2.813 x( 19,449 - 24,349 )= -53.925 Btuh
Total System Load = -59.362 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = -53.925 / ( 10,00 x 500 ) = -10,8 GPM
Heating GPM = 58.553 / ( 20,00 x 500 ) = 5,9 GPM
Steam Req. = 58.553 / 970 = 60,4 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 63,21 Dry bulb temperature: 69,02
Wet bulb temperature: 46,53
Relative humidity: 27,92
Enthalpy: 19,45 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,35 Dry bulb temperature: 95,00
Wet bulb temperature: 54,47
Relative humidity: 95,00
Enthalpy: 24,35 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 26

Air System #8 (Uma 100% Aire Fresco At. Urg. Emerg.) Psychrometric
Analysis
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 72,683 55,856
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 1.270 1,000 69
Zone Loads 1.370 1,744 23.046 18,144 1.259
Sensible Reserve 0 0,000 0
Zone Condition 1.370 29,503 24.316 75,000 1.328
Return Air Duct 0 0,000
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 1.328 CFM -34.443 -43,776 -19.053 -15,000
Blow-Thru Fan 1.537 1,210
Entering Coil Condition -33.073 30,651 6.800 61,210 1.328

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 1.328 x( 61,210 - 55,856 )= 6.801 Btuh


TLH = 0,869 x 0,68 x 1.328 x( 30,651 - 72,683 )= -33.004 Btuh
----------
SUM = -26.203 Btuh
GTH = 0,869 x 4,50 x 1.328 x( 19,456 - 24,682 )= -27.153 Btuh
Total System Load = -29.040 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = -27.153 / ( 10,00 x 500 ) = -5,4 GPM
Heating GPM = 47.741 / ( 20,00 x 500 ) = 4,8 GPM
Steam Req. = 47.741 / 970 = 49,2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 61,21 Dry bulb temperature: 69,80
Wet bulb temperature: 46,53
Relative humidity: 33,38
Enthalpy: 19,46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,86 Dry bulb temperature: 95,00
Wet bulb temperature: 54,97
Relative humidity: 95,00
Enthalpy: 24,68 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 27

Air System #8 (Uma 100% Aire Fresco At. Urg. Emerg.) Psychrometric
Analysis (G)
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 72,683 55,856
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 1.270 1,000 69
Zone Loads 1.370 1,744 23.046 18,144 1.259
Sensible Reserve 0 0,000 0
Zone Condition 1.370 29,503 24.316 75,000 1.328
Return Air Duct 0 0,000
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 1.328 CFM -34.443 -43,776 -19.053 -15,000
Blow-Thru Fan 1.537 1,210
Entering Coil Condition -33.073 30,651 6.800 61,210 1.328

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 1.328 x( 61,210 - 55,856 )= 6.801 Btuh


TLH = 0,869 x 0,68 x 1.328 x( 30,651 - 72,683 )= -33.004 Btuh
----------
SUM = -26.203 Btuh
GTH = 0,869 x 4,50 x 1.328 x( 19,456 - 24,682 )= -27.153 Btuh
Total System Load = -29.040 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = -27.153 / ( 10,00 x 500 ) = -5,4 GPM
Heating GPM = 47.741 / ( 20,00 x 500 ) = 4,8 GPM
Steam Req. = 47.741 / 970 = 49,2 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 61,21 Dry bulb temperature: 69,80
Wet bulb temperature: 46,53
Relative humidity: 33,38
Enthalpy: 19,46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,86 Dry bulb temperature: 95,00
Wet bulb temperature: 54,97
Relative humidity: 95,00
Enthalpy: 24,68 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 28

Air System #9 (Uma 100% Frs. Upss Patologia Clin.) Psychrometric Analysis
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 72,487 55,783
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 1.087 1,000 59
Zone Loads 1.297 1,929 19.806 18,217 1.078
Sensible Reserve 0 0,000 0
Zone Condition 1.297 29,503 20.894 75,000 1.137
Return Air Duct 0 0,000
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 1.137 CFM -29.482 -43,765 -16.309 -15,000
Blow-Thru Fan 1.316 1,210
Entering Coil Condition -28.185 30,651 5.900 61,210 1.137

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 1.137 x( 61,210 - 55,783 )= 5.901 Btuh


TLH = 0,869 x 0,68 x 1.137 x( 30,651 - 72,487 )= -28.118 Btuh
----------
SUM = -22.217 Btuh
GTH = 0,869 x 4,50 x 1.137 x( 19,456 - 24,633 )= -23.027 Btuh
Total System Load = -23.773 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = -23.027 / ( 10,00 x 500 ) = -4,6 GPM
Heating GPM = 43.442 / ( 20,00 x 500 ) = 4,3 GPM
Steam Req. = 43.442 / 970 = 44,8 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 61,21 Dry bulb temperature: 69,53
Wet bulb temperature: 46,53
Relative humidity: 33,38
Enthalpy: 19,46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,78 Dry bulb temperature: 95,00
Wet bulb temperature: 54,89
Relative humidity: 95,00
Enthalpy: 24,63 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 29

Air System #9 (Uma 100% Frs. Upss Patologia Clin.) Psychrometric Analysis
(G)
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 72,487 55,783
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 1.087 1,000 59
Zone Loads 1.297 1,929 19.806 18,217 1.078
Sensible Reserve 0 0,000 0
Zone Condition 1.297 29,503 20.894 75,000 1.137
Return Air Duct 0 0,000
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 1.137 CFM -29.482 -43,765 -16.309 -15,000
Blow-Thru Fan 1.316 1,210
Entering Coil Condition -28.185 30,651 5.900 61,210 1.137

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 1.137 x( 61,210 - 55,783 )= 5.901 Btuh


TLH = 0,869 x 0,68 x 1.137 x( 30,651 - 72,487 )= -28.118 Btuh
----------
SUM = -22.217 Btuh
GTH = 0,869 x 4,50 x 1.137 x( 19,456 - 24,633 )= -23.027 Btuh
Total System Load = -23.773 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = -23.027 / ( 10,00 x 500 ) = -4,6 GPM
Heating GPM = 43.442 / ( 20,00 x 500 ) = 4,3 GPM
Steam Req. = 43.442 / 970 = 44,8 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 61,21 Dry bulb temperature: 69,53
Wet bulb temperature: 46,53
Relative humidity: 33,38
Enthalpy: 19,46 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,78 Dry bulb temperature: 95,00
Wet bulb temperature: 54,89
Relative humidity: 95,00
Enthalpy: 24,63 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 30

Air System #10 (Uma Rtorn. Consulta Externa Z1) Psychrometric Analysis
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 72,679 55,855
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 2.100 1,000 115
Zone Loads 2.268 1,747 38.103 18,145 2.081
Sensible Reserve 0 0,000 0
Zone Condition 2.268 74,427 40.203 75,000 2.196
Return Air Duct 885 0,500
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 345 CFM -8.449 -6,494 -6.928 -3,378
Blow-Thru Fan 635 0,303
Entering Coil Condition -6.180 67,932 34.795 72,425 2.196

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 2.196 x( 72,425 - 55,855 )= 34.796 Btuh


TLH = 0,869 x 0,68 x 2.196 x( 67,932 - 72,679 )= -6.162 Btuh
----------
SUM = 28.634 Btuh
GTH = 0,869 x 4,50 x 2.196 x( 27,993 - 24,681 )= 28.450 Btuh
Total System Load = 28.615 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 28.450 / ( 10,00 x 500 ) = 5,7 GPM
Heating GPM = 77.994 / ( 20,00 x 500 ) = 7,8 GPM
Steam Req. = 77.994 / 970 = 80,4 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 72,42 Dry bulb temperature: 69,67
Wet bulb temperature: 59,76
Relative humidity: 49,78
Enthalpy: 27,99 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,85 Dry bulb temperature: 95,00
Wet bulb temperature: 54,97
Relative humidity: 95,00
Enthalpy: 24,68 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 31

Air System #10 (Uma Rtorn. Consulta Externa Z1) Psychrometric Analysis (G)
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 72,679 55,855
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 2.100 1,000 115
Zone Loads 2.268 1,747 38.103 18,145 2.081
Sensible Reserve 0 0,000 0
Zone Condition 2.268 74,427 40.203 75,000 2.196
Return Air Duct 885 0,500
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 345 CFM -8.449 -6,494 -6.928 -3,378
Blow-Thru Fan 635 0,303
Entering Coil Condition -6.180 67,932 34.795 72,425 2.196

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 2.196 x( 72,425 - 55,855 )= 34.796 Btuh


TLH = 0,869 x 0,68 x 2.196 x( 67,932 - 72,679 )= -6.162 Btuh
----------
SUM = 28.634 Btuh
GTH = 0,869 x 4,50 x 2.196 x( 27,993 - 24,681 )= 28.450 Btuh
Total System Load = 28.615 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 28.450 / ( 10,00 x 500 ) = 5,7 GPM
Heating GPM = 77.994 / ( 20,00 x 500 ) = 7,8 GPM
Steam Req. = 77.994 / 970 = 80,4 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 72,42 Dry bulb temperature: 69,67
Wet bulb temperature: 59,76
Relative humidity: 49,78
Enthalpy: 27,99 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,85 Dry bulb temperature: 95,00
Wet bulb temperature: 54,97
Relative humidity: 95,00
Enthalpy: 24,68 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 32

Air System #11 (Uma Rtorn. Consulta Externa Z2) Psychrometric Analysis
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 72,789 55,895
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 1.903 1,000 104
Zone Loads 1.935 1,644 34.459 18,104 1.886
Sensible Reserve 0 0,000 0
Zone Condition 1.935 74,433 36.362 75,000 1.990
Return Air Duct 811 0,500
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 294 CFM -7.206 -6,113 -5.909 -3,178
Blow-Thru Fan 2.303 1,210
Entering Coil Condition -5.272 68,321 33.567 73,532 1.990

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 1.990 x( 73,532 - 55,895 )= 33.568 Btuh


TLH = 0,869 x 0,68 x 1.990 x( 68,321 - 72,789 )= -5.257 Btuh
----------
SUM = 28.310 Btuh
GTH = 0,869 x 4,50 x 1.990 x( 28,324 - 24,708 )= 28.155 Btuh
Total System Load = 28.295 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 28.155 / ( 10,00 x 500 ) = 5,6 GPM
Heating GPM = 59.150 / ( 20,00 x 500 ) = 5,9 GPM
Steam Req. = 59.150 / 970 = 61,0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 73,53 Dry bulb temperature: 69,00
Wet bulb temperature: 60,21
Relative humidity: 48,22
Enthalpy: 28,32 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,90 Dry bulb temperature: 95,00
Wet bulb temperature: 55,01
Relative humidity: 95,00
Enthalpy: 24,71 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Centro De Salud Capachica
Hell Page 33

Air System #11 (Uma Rtorn. Consulta Externa Z2) Psychrometric Analysis (G)
System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 72,789 55,895
Draw-Thru Fan 0 0,000 0
Misc Load on Supply Side 0 0,000 0
Supply Air Duct 1.903 1,000 104
Zone Loads 1.935 1,644 34.459 18,104 1.886
Sensible Reserve 0 0,000 0
Zone Condition 1.935 74,433 36.362 75,000 1.990
Return Air Duct 811 0,500
Return Air Plenum 0 0,000
Misc Load on Return Side 0 0,000
Vent Air 294 CFM -7.206 -6,113 -5.909 -3,178
Blow-Thru Fan 2.303 1,210
Entering Coil Condition -5.272 68,321 33.567 73,532 1.990

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29,921)
TSH = PR x 1,10 x CFM x (DB entering - DB leaving)
TLH = PR x 0,68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4,50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0,869 x 1,10 x 1.990 x( 73,532 - 55,895 )= 33.568 Btuh


TLH = 0,869 x 0,68 x 1.990 x( 68,321 - 72,789 )= -5.257 Btuh
----------
SUM = 28.310 Btuh
GTH = 0,869 x 4,50 x 1.990 x( 28,324 - 24,708 )= 28.155 Btuh
Total System Load = 28.295 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 28.155 / ( 10,00 x 500 ) = 5,6 GPM
Heating GPM = 59.150 / ( 20,00 x 500 ) = 5,9 GPM
Steam Req. = 59.150 / 970 = 61,0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 73,53 Dry bulb temperature: 69,00
Wet bulb temperature: 60,21
Relative humidity: 48,22
Enthalpy: 28,32 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55,90 Dry bulb temperature: 95,00
Wet bulb temperature: 55,01
Relative humidity: 95,00
Enthalpy: 24,71 Btu/lbm

E:\ ...\CALCULO TERMICO CENTRO DE SALUD CAPACHICA V1.CHV viernes, 5 de mayo de 2023, 10:59