BI-10-09501
BERRI DEVELOPMENT – OFFSHORE PLATFORMS AND
FLOWLINES
Field Layout
Scope of Work
Decks installation sequence
Passage Plan
Decks Details
Cargo Barge Preparation
Installation Plan
Barge Set up
Cargo Barge Mooring
Deck Lifting and Set up
Completion Works
Challenges
BRRI FIELD
Existing
Jacket
New
Deck
ITEM DESCRIPTION
Structural type 4-legged, standard deck
Cellar Deck, EL (+) 8.000 m
Deck Legs, EL (+) 9.144 m
Different levels in the Main Deck, EL (+) 12.000 m
deck (TOS) Wellhead Access Area, EL (+) 15.000 m
Mezzanine Deck, EL (+) 16.500 m
Helideck, EL (+) 21.000 m
4x legged 42” dia. x 1.5” thk.
Leg A1 is open for stabbing guide, bottom of leg EL (+) 9.144 m
Deck Leg details Leg A2 is open for stabbing guide, bottom of leg EL (+) 9.144 m
Leg B1 closed with a plate and stabbing cones EL (+) 9.144 m
Leg B2 closed with a plate and stabbing cones EL (+) 9.144 m
Leg A1 is with stabbing guide at EL (+) 19.380 m
Deck leg interface with Leg A2 is with stabbing guide at EL (+) 19.880 m
jacket Leg B1 is with Transition Piece at EL (+) 9.144 m
Leg B2 is with Transition Piece at EL (+) 9.144 m
Installation Side
DECK WD @ Location Weighed Weight
East/West
Offshore Installed
Standby Position
Deck Installation /
ROV Survey
Position
CB Mooring Position
Stinger Removal
Operation in Shallow Areas (<7.0m WD)
Anchor handling in shallow areas and crossing existing assets