Professional Documents
Culture Documents
Dated: 02-04-2019
Bid Document
Bid Details
Bid End Date/Time 10-04-2019 09:00:00
Bid Life Cycle (From Publish Date) 90 (Days)
Bid Offer Validity (From End Date) 45 (Days)
Ministry/State Name Ministry Of Defence
Department Name Department Of Defence
Organisation Name N/a
Office Name Beg & Centre Roorkee/uk Sub Area/ub Area
Total Quantity 1
Item Category Astronomical Timer for Street Light Control (Timer
Controls)
Experience with Government Required 2 Year (s)
MSE Exemption For Years Of Experience Yes
And Turnover
Startup Exemption For Years Of Experience Yes
And Turnover
Document required from seller Experience with Government,Annual
Turnover,Certificate (Requested in ATC),OEM
Authorization Certificate,OEM Annual Turnover
1/4
Each ATSC has built in Yes *
networking support
that communicates to
the central server that
can control each phase
independently and log
the performance of all
or a cluster of
streetlights (If ''NO''
write NA)
Built in feature Yes *
Astronomical timer
ATSC shall display of Yes *
Longituide, Latitude,
Date, Time, Voltage,
Current and On time
and Off time
Display of Energy in No *
Kwh and Measurement
of energy (in kWh) (
non utility) with
resolution 1%
CONSTRUCTIONAL No. of phase Single Single, Three
Power 1 Phase, 6 kW/43A 1 Phase, 6 kW/43A, 1
rating/indicative Phase, 10 kW/73A, 1
current rating for Phase, 15 kW/109A, 3
relay on 230 V basis Phase, 18 kW/43 A
and 0.6 PF each phase, 3 Phase,
30 kW/73A each phase,
3 Phase, 45 kW/109A
each phase
System Rated Voltage 230 Volt, 50 Hz *
(+/-10%)
IP Rating IP 54 *
Manually settable timer Yes *
with 12 programmes
spreaded over a year
as defined programme
Manual ON / OFF Yes *
Intermediate ON-OFF Yes *
ON/OFF Timing </=60 seconds *
accuracy
PROTECTION Over Voltage Protection 260 Volt +/- 5 Volt *
per phase
Under Voltage 160 Volt +/- 5 Volt *
Protection per phase
Over Load (Minimum Yes *
10% of rated load)
Protection per phase
2/4
Dimensions (Lmm x - *
Wmm x Hmm) - must
declare
OPERATING Operating Temperature -10 to +50 deg C *
CONDITIONS Range
Relative Humidity (%) 95% *
WARRANTY Warranty (in Years) 1 1, 2
ENVIRONMENTAL / Conformity to Dry Heat Yes *
CERTIFICATION test at 55 degree C for
16 hours as per IS
:9000 (Part
3/Sec.5):1977 latest
Conformity to Damp Yes *
heat at 40 degree C -
95% RH (cyclic test):
two cycles of 12+12
hours as per IS: 9000
(Part 5/Sec.2):1981
latest
Conformity to Cold test Yes *
at -10 degree C for 4
hours as per IS: 9000
(Part 2/Secc.4):1977
latest, as applicable
Availability of Type Yes *
Test Report from
Central
Govt./NABL/ILAC
accredited lab to prove
conformity to
specification
All the test reports shall Yes *
furnish to the
buyer/consignee on
demand
* Bold specifications are the golden parameters.
EMD Detail
Required No
3/4
ePBG Detail
Required No
Splitting
5. Special Terms and Conditions as defined by world bank at click here will also be applicable
---Thank You---
4/4