Date: Roving Time Weather Condition

04-01-2023 0400H Partly cloudy

Cooling Tower and Chilled Water System

Chiller Unit No. ▲


% Input Full Load Ampere Total Running Hours Running Status
1 58 484 Normal
2 - - Standby

Equipment Name ▲
Running Status.
Chilled Water Pump 1 Normal
Chilled Water Pump 2 Standby
Condenser Pump 1 Standby
Condenser Pump 2 Normal
Cooling Tower 1 Standby
Cooling Tower 2 Normal

General Power Equipment

Number

General Power Equipment Status Running Status..

1 MVSG A Normal
2 MVSG B Normal
3 LVSG A Normal
4 ATS-LVSG A Normal
5 LVSG B Normal
6 ATS-LVSG B Normal
7 LVSG C1 Normal
8 ATS-LVSG C1 Normal
9 LVSG C2 Normal
10 ATS-LVSG C2 Normal
11 LVSG D1 Normal
12 ATS-LVSG D1 Normal
13 LVSG D2 Normal
14 ATS-LVSG D2 Normal
15 FSS A (Novec) Data Hall 1&2 Normal
16 FSS B(Novec) Data Hall 1&2 Normal
17 Transformer C Normal
18 Transformer D Normal
19 FSS A (Novec) Data Center 1 Normal
20 FSS B (Novec) Data Center 3 Normal
21 Transformer A Normal
22 Transformer B Normal

Second Floor Electrical Rooms

Temp Temp Temp Temp RH RH RH RH


Second Floor Electrical Temp Temp Cold Cold Hot Hot RH RH Cold Cold Hot Hot
Rooms ▲
Max Min Aisle Aisle Aisle Aisle Max Min Aisle Aisle Aisle Aisle
Max. Min. Min. Max. Max. Min. Max. Min.
2F Data Center 1 36 21 - - - - 66 33 - - - -
2F Data Center 2 - - 25 22 23 28 - - 59 55 57 49
2F Data Center 3 - - 26.4 24.8 28.6 31.5 - - 57.1 53 46.7 40
2F Rectifier 1 23 - - - - - 54 - - - - -
2F Rectifier 2 24 - - - - - 56 - - - - -
2F UPS 1 22 - - - - - 57 - - - - -
2F UPS 2 21 - - - - - 56 - - - - -
Transformer A 29 - - - - - 72 - - - - -
Transformer B 28 - - - - - 76 - - - - -

Number

Room Name Running Status...

1 Transformer A Ventilation Fan No.1 Normal


2 Transformer A Ventilation Fan No.2 Standby
3 Transformer B Ventilation Fan No.1 Normal
4 Transformer B Ventilation Fan No.2 Standby
5 Rectifier 1 FCU #1 Normal
6 Rectifier 1 FCU #2 Standby
7 Rectifier 1 FCU #3 Standby
8 Rectifier 2 FCU #1 Normal
9 Rectifier 2 FCU #2 Standby
10 Rectifier 2 FCU #3 Standby
11 2F DATA Center 1 PACU #1 Normal
12 2F DATA Center 1 PACU #2 Normal
13 2F DATA Center 1 PACU #3 Standby
14 2F DATA Center 1 PACU #4 Standby
15 2F DATA Center 1 PACU #5 Normal
16 2F DATA Center 1 PACU #6 Standby
17 2F DATA Center 1 PACU #7 Standby
18 2F DATA Center 1 PACU #8 Normal
19 2F DATA Center 2 PACU #1 Standby
20 2F DATA Center 2 PACU #2 Standby
21 2F DATA Center 2 PACU #3 Standby
22 2F DATA Center 2 PACU #4 Standby
23 2F DATA Center 2 PACU #5 Normal
24 2F DATA Center 2 PACU #6 Normal
25 2F DATA Center 2 PACU #7 Standby
26 2F DATA Center 2 PACU #8 Standby
27 2F UPS 1 FCU #1 Normal
28 2F UPS 1 FCU #2 Standby
29 2F UPS 2 FCU #1 Standby
30 2F UPS 2 FCU #2 Normal
31 2F Data Center 3 Fanwall #2 Normal
32 2F Data Center 3 Fanwall #3 Standby
Ground Floor Electrical Rooms

Ground Floor Electrical Rooms ▲


Temperature °C. Humidity %.
Battery Room 1 21 67
Battery Room 2 23 72
Battery Room 3 22 74
Battery Room 4 23 78

Number Room Name. Running Status....


1 Synchro 1 FCU #1 -
2 Synchro 1 FCU #2 Standby
3 Synchro 2 FCU #1 Normal
4 Synchro 2 FCU #2 Standby
5 Battery Room 1 FCU #1 Standby
6 Battery Room 1 FCU #2 Normal
7 Battery Room 1 FCU #3 Standby
8 Battery Room 2 FCU #1 Normal
9 Battery Room 2 FCU #2 Standby
10 Battery Room 2 FCU #3 Standby
11 Battery Room 3 FCU #1 Normal
12 Battery Room 3 FCU #2 Standby
13 Battery Room 3 FCU #3 Standby
14 Battery Room 4 FCU #1 Standby
15 Battery Room 4 FCU #2 Normal
16 Battery Room 4 FCU #3 Standby

Number

Emergency Backup Power Status..

1 Genset 1 Standby
2 Genset 2 Standby
3 Fuel Pump 1 Auto
4 Fuel Pump 2 Standby
5 Synchro 1 Panel Standby
6 Synchro 2 Panel Online
7 Daytank 1&2 (Liters) 5233.4
8 Daytank 3 (Liters) 6023.4
9 Total Diesel Fuel Reserve (Liters) 11256.8

2F Parameter Reading LVSG A LVSG B UPS 1 ▼


UPS 2 DP Rectifier A DP Rectifier B
Voltage (LL) Line 3 410 399 409 397 410 399
Voltage (LL) Line 2 407 410 406 409 407 411
Voltage (LL) Line 1 398 407 398 405 399 407
Current (LL) Line 1 520 598 181 154 219 216
Current (LL) Line 3 524 579 170 150 211 208
Current (LL) Line 2 498 624 160 146 216 214
Power KW (Ave) 354.06 413.87 110.3 94.49 149.81 148.08
- - - - - - -

Number 2F UPS 1 and UPS 2



Rooms Load on Inverter Bypass Battery

1 2F UPS 1 unit Load on Inverter Normal - -


2 2F UPS Battery 1 - - - Normal
3 2F UPS 2 unit Load on Inverter Normal - -
4 2F UPS Battery 2 - - - Normal

Number

2F Parameter Reading. CPS1 (Rectifier Rm2) CPS2 (Rectifier Rm1) CPS3 (Rectifier Rm2) CPS4 (Rectifier Rm1)

1 Battery Voltage (Volts) 379.68 379.68 379.7 379.6


2 Battery Current (Amps) 6 4 19 1
3 Battery Temp °C 23 27 25 23
4 Rectifier Current (Amps) 375 375 195 188
5 Rectifier Capacity % 32 23 17 16
6 Battery Remaining Capa… 3360 3360 3360 3360

2F DC1 (DC-DC
Converters) ▼
1-1 1-2 1-3 1-4 1-5 1-6 2-1 2-2 2-3 2-4 2-5 2-6 3-1 3-2 4-1 4-2

Current (Amps) 537 404 329 376 424 466 591 332 402 361 396 450 610 387 599 387
% Utilization 35 26 21 24 28 30 39 21 26 23 26 29 40 25 39 25

2F DC2 (DC-DC
Converters) ▼
3-3 3-4 4-3 4-4

Current (Amps) 60 2 62 2
% Utilization 3 0 4 0
Third Floor Electrical Rooms

Third Floor Electrical Rooms ▲


Temperature °C Humidity %
3F UPS 1 22.3 64
3F UPS 2 23 55
Transformer C 30 70
Transformer D 29 70

Number

Rooms Name... Running Status.....

1 3F UPS 1 FCU #1 Standby


2 3F UPS 1 FCU #2 Standby
3 3F UPS 1 FCU #3 Standby
4 3F UPS 1 FCU #4 Normal
5 3F UPS 2 FCU #1 Normal
6 3F UPS 2 FCU #2 Standby
7 3F UPS 2 FCU #3 Standby
8 3F UPS 2 FCU #4 Standby
9 3F Data Hall 1&2 FANWALL #1 Normal
10 3F Data Hall 1&2 FANWALL #2 Standby
11 3F Data Hall 1&2 FANWALL #3 Normal

Number ▲
3F Parameter Reading LVSG C LVSG D UPS 1. UPS 2.
1 Voltage (LL) Line 1 406 407 398 399
2 Voltage (LL) Line 2 409 411 398 399
3 Voltage (LL) Line 3 398 399 398 399
4 Current (LL) Line 1 74 68 8 3
5 Current (LL) Line 2 103 99 14 11
6 Current (LL) Line 3 106 14 12 9
7 Power KW (Ave) 63.97 63.98 110.3 94.49

Number ▲
3F UPS 1 and UPS 2 Rooms Load on. Inverter. Bypass. Battery.
1 3F UPS 1 unit Load on Inverter Normal - -
2 3F UPS Battery 1 - - - Normal
3 3F UPS 2 unit Load on Inverter Normal - -
4 3F UPS Battery 2 - - - Normal

Remarks

Normal operation, Chiller 3 standby

Facility Management Team on Duty

Technician on Duty
Jhesly Asuncion / Peter Espinosa / Deejay Decandido / Lyndon Aurelio
Engineer on Duty
Marwin Zaraspe