Equipment Name ▲
Running Status.
Chilled Water Pump 1 Standby
Chilled Water Pump 2 Normal
Condenser Pump 1 Standby
Condenser Pump 2 Normal
Cooling Tower 1 Standby
Cooling Tower 2 Normal
Number
▲
General Power Equipment Status Running Status..
1 MVSG A Normal
2 MVSG B Normal
3 LVSG A Normal
4 ATS-LVSG A Normal
5 LVSG B Normal
6 ATS-LVSG B Normal
7 LVSG C1 Normal
8 ATS-LVSG C1 Normal
9 LVSG C2 Normal
10 ATS-LVSG C2 Normal
11 LVSG D1 Normal
12 ATS-LVSG D1 Normal
13 LVSG D2 Normal
14 ATS-LVSG D2 Normal
15 FSS A (Novec) Data Hall 1&2 Normal
16 FSS B(Novec) Data Hall 1&2 Normal
17 Transformer C Normal
18 Transformer D Normal
19 FSS A (Novec) Data Center 1 Normal
20 FSS B (Novec) Data Center 3 Normal
21 Transformer A Normal
22 Transformer B Normal
Number
▲
Room Name Running Status...
Number
▲
Emergency Backup Power Status..
1 Genset 1 Standby
2 Genset 2 Standby
3 Fuel Pump 1 Standby
4 Fuel Pump 2 Auto
5 Synchro 1 Panel Standby
6 Synchro 2 Panel Online
7 Daytank 1&2 (Liters) 5953.5
8 Daytank 3 (Liters) 7119.1
9 Total Diesel Fuel Reserve (Liters) 13072.6
Number ▲
2F Parameter Reading LVSG A DP Rectifier A LVSG B DP Rectifier B UPS 1 UPS 2
1 Voltage (LL) Line 1 398 398 408 408 396 405
2 Voltage (LL) Line 2 408 408 412 413 406 409
3 Voltage (LL) Line 3 411 411 399 400 409 396
4 Current (LL) Line 1 604 206 406 204 156 132
5 Current (LL) Line 2 592 202 420 202 139 123
6 Current (LL) Line 3 676 202 377 201 146 128
7 Power KW (Ave) - - - - - -
Number
▲
2F Parameter Reading. CPS1 (Rectifier Rm2) CPS2 (Rectifier Rm1) CPS3 (Rectifier Rm2) CPS4 (Rectifier Rm1)
2F DC1 (DC-DC
Converters) ▼
1-1 1-2 1-3 1-4 1-5 1-6 2-1 2-2 2-3 2-4 2-5 2-6 3-1 3-2 4-1 4-2
Current (Amps) 548 391 340 339 367 391 604 317 411 314 320 400 566 336 556 325
% Utilization 36 25 22 22 25 25 39 20 27 20 21 26 37 21 36 22
2F DC2 (DC-DC
Converters) ▼
3-3 3-4 4-3 4-4
Current (Amps) 38 2 40 2
% Utilization 2 0 2 0
Third Floor Electrical Rooms
Number
▲
Rooms Name... Running Status.....
Number ▲
3F Parameter Reading LVSG C LVSG D UPS 1. UPS 2.
1 Voltage (LL) Line 1 407 407 398 399
2 Voltage (LL) Line 2 412 412 398 398
3 Voltage (LL) Line 3 398 398 398 399
4 Current (LL) Line 1 32 32 3 4
5 Current (LL) Line 2 27 27 19 11
6 Current (LL) Line 3 26 19 11 7
7 Power KW (Ave) - - - -
Number ▲
3F UPS 1 and UPS 2 Rooms Load on. Inverter. Bypass. Battery.
1 3F UPS 1 unit Load on Inverter Normal - -
2 3F UPS Battery 1 - - - Normal
3 3F UPS 2 unit Load on Inverter Normal - -
4 3F UPS Battery 2 - - - Normal
Remarks
Technician on Duty
Rene Polbos / Lyndon Aurelio / Peter Espinosa
Engineer on Duty
Paul Cansino