You are on page 1of 3

 

  Daily Monitoring Report                                                       Theodore Data Center

Date: Roving Time Weather Condition May 19, 2022,


12:21:00 PM
05-19-2022 1200H Partly cloudy

Colling Tower and Chilled Water System

Chiller Unit No. ▲


% Input Full Load Ampere Total Running Hours Running Status
1 74.9 12487 Normal
2 - - Fault/CM

Equipment Name ▲
Running Status.
Chilled Water Pump 1 Standby
Chilled Water Pump 2 Normal
Condenser Pump 1 Normal
Condenser Pump 2 Standby
Cooling Tower 1 Standby
Cooling Tower 2 Normal

General Power Equipment

Number

General Power Equipment Status Running Status..

1 MVSG A Normal
2 MVSG B Normal
3 LVSG A Normal
4 ATS-LVSG A Normal
5 LVSG B Normal
6 ATS-LVSG B Normal
7 LVSG C1 Normal
8 ATS-LVSG C1 Normal
9 LVSG C2 N/A
10 ATS-LVSG C2 N/A
11 LVSG D1 Normal
12 ATS-LVSG D1 Normal
13 LVSG D2 N/A
14 ATS-LVSG D2 N/A
15 FSS A (Novec) Data Hall 1&2 Normal
16 FSS B(Novec) Data Hall 1&2 Normal
17 Transformer C Normal
18 Transformer D Normal
19 FSS A (Novec) Data Center 1 Normal
20 FSS B (Novec) Data Center 3 Normal
21 Transformer A Normal
22 Transformer B Normal

Second Floor Electrical Rooms

Temp Temp Temp Temp RH RH RH RH


Second Floor Electrical Temp Temp Cold Cold Hot Hot RH RH Cold Cold Hot Hot
Rooms ▲
Max Min Aisle Aisle Aisle Aisle Max Min Aisle Aisle Aisle Aisle
Max. Min. Min. Max. Max. Min. Max. Min.
2F Data Center 1 33 20 - - - - 74 43 - - - -
2F Data Center 2 - - 23 20 22 23 - - 69 66 66 64
2F UPS 1 23.5 - - - - - 64 - - - - -
2F UPS 2 22.5 - - - - - 69 - - - - -
FRANKLIN 29 24 - - - - 69 54 - - - -
Rectifier 1 23.8 - - - - - 63.7 - - - - -
Rectifier 2 23.4 - - - - - 63.2 - - - - -
Transformer A 27.4 - - - - - 83.5 - - - - -
Transformer B 27.4 - - - - - 84 - - - - -

Number

Room Name Running Status...

1 Transformer A Ventilation Fan No.1 Standby


2 Transformer A Ventilation Fan No.2 Standby
3 Transformer B Ventilation Fan No.1 Standby
4 Transformer B Ventilation Fan No.2 Standby
5 Rectifier 1 FCU #1 Normal
6 Rectifier 1 FCU #2 Standby
7 Rectifier 1 FCU #3 Standby
8 Rectifier 2 FCU #1 Normal
9 Rectifier 2 FCU #2 Standby
10 Rectifier 2 FCU #3 Standby
11 2F DATA Center 1 PACU #1 Normal
12 2F DATA Center 1 PACU #2 Normal
13 2F DATA Center 1 PACU #3 Normal
14 2F DATA Center 1 PACU #4 Standby
15 2F DATA Center 1 PACU #5 Normal
16 2F DATA Center 1 PACU #6 Standby
17 2F DATA Center 1 PACU #7 Standby
18 2F DATA Center 1 PACU #8 Standby
19 2F DATA Center 2 PACU #1 Standby
20 2F DATA Center 2 PACU #2 Standby
21 2F DATA Center 2 PACU #3 Normal
22 2F DATA Center 2 PACU #4 Standby
23 2F DATA Center 2 PACU #5 Standby
24 2F DATA Center 2 PACU #6 Standby
25 2F DATA Center 2 PACU #7 Standby
26 2F DATA Center 2 PACU #8 Standby
27 2F UPS 1 FCU #1 Standby
28 2F UPS 1 FCU #2 Normal
29 2F UPS 2 FCU #1 Normal
30 2F UPS 2 FCU #2 Standby
31 FRANKLIN FAN WALL #2 Standby
32 FRANKLIN FAN WALL #3 Normal
Ground Floor Electrical Rooms

Ground Floor Electrical Rooms ▲


Temperature °C. Humidity %.
Battery Room 1 23 63
Battery Room 2 24 83
Battery Room 3 24 81
Battery Room 4 25 82

Number Room Name. Running Status....


1 Synchro 1 FCU #1 Normal


2 Synchro 1 FCU #2 Standby
3 Synchro 2 FCU #1 Normal
4 Synchro 2 FCU #2 Standby
5 Battery Room 1 FCU #1 Normal
6 Battery Room 1 FCU #2 Standby
7 Battery Room 1 FCU #3 Standby
8 Battery Room 2 FCU #1 Normal
9 Battery Room 2 FCU #2 Standby
10 Battery Room 2 FCU #3 Standby
11 Battery Room 3 FCU #1 Standby
12 Battery Room 3 FCU #2 Normal
13 Battery Room 3 FCU #3 Standby
14 Battery Room 4 FCU #1 Normal
15 Battery Room 4 FCU #2 Standby
16 Battery Room 4 FCU #3 Standby

Number

Emergency Backup Power Status..

1 Genset 1 Standby
2 Genset 2 Standby
3 Fuel Pump 1 Auto
4 Fuel Pump 2 Standby
5 Synchro 1 Panel Standby
6 Synchro 2 Panel Online
7 Daytank 1&2 (Liters) 6176.25
8 Daytank 3 (Liters) 7362.9
9 Total Diesel Fuel Reserve (Liters) 13539.15

Number ▲
2F Parameter Reading LVSG A DP Rectifier A LVSG B DP Rectifier B UPS 1 UPS 2
1 Voltage (LL) Line 1 398 399 404 405 397 402
2 Voltage (LL) Line 2 406 406 408 408 404 406
3 Voltage (LL) Line 3 408 408 398 398 406 397
4 Current (LL) Line 1 486 196 567 197 162 123
5 Current (LL) Line 2 448 199 579 197 135 120
6 Current (LL) Line 3 490 197 567 195 140 118
7 Power KW (Ave) 320.29 136.35 391.57 135.48 90.95 72.08

Number 2F UPS 1 and UPS 2



Rooms Load on Inverter Bypass Battery

1 2F UPS 1 unit Load on Inverter Normal - -


2 2F UPS Battery 1 - - - Normal
3 2F UPS 2 unit Load on Inverter Normal - -
4 2F UPS Battery 2 - - - Normal

Number

2F Parameter Reading. CPS1 (Rectifier Rm2) CPS2 (Rectifier Rm1) CPS3 (Rectifier Rm2) CPS4 (Rectifier Rm1)

1 Battery Voltage (Volts) 379.7 379.7 379.7 379.6


2 Battery Current (Amps) 4 7 1 1
3 Battery Temp °C 29 23 26 25
4 Rectifier Current (Amps) 339 334 135 136
5 Rectifier Capacity % 20 30 11 11
6 Battery Remaining Capa… 3360 3360 1680 1680

2F DC1 (DC-DC
Converters) ▼
1-1 1-2 1-3 1-4 1-5 1-6 2-1 2-2 2-3 2-4 2-5 2-6 3-1 3-2 4-1 4-2

Current (Amps) 546 391 343 334 299 356 611 308 414 313 266 343 604 300 595 295
% Utilization 36 25 22 22 20 23 40 20 27 20 17 22 39 19 39 19

2F DC2 (DC-DC
Converters) ▼
3-3 3-4 4-3 4-4

Current (Amps) 39 2 38 2
% Utilization 2 0 2 0
Third Floor Electrical Rooms

Third Floor Electrical Rooms ▲


Temperature °C Humidity %
3F UPS 1 24 63
3F UPS 2 23 58
Transformer C 29 79
Transformer D 29 81

Number

Rooms Name... Running Status.....

1 3F UPS 1 FCU #1 Standby


2 3F UPS 1 FCU #2 Standby
3 3F UPS 1 FCU #3 Standby
4 3F UPS 1 FCU #4 Normal
5 3F UPS 2 FCU #1 Normal
6 3F UPS 2 FCU #2 Standby
7 3F UPS 2 FCU #3 Standby
8 3F UPS 2 FCU #4 Standby
9 3F Data Hall 1&2 FANWALL #1 Normal
10 3F Data Hall 1&2 FANWALL #2 Standby
11 3F Data Hall 1&2 FANWALL #3 Standby

Number ▲
3F Parameter Reading LVSG C LVSG D UPS 1. UPS 2.
1 Voltage (LL) Line 1 403 403 398 399
2 Voltage (LL) Line 2 406 407 398 399
3 Voltage (LL) Line 3 396 397 398 399
4 Current (LL) Line 1 32 32 3 3
5 Current (LL) Line 2 27 27 19 10
6 Current (LL) Line 3 26 19 10 7
7 Power KW (Ave) 16.04 16.3 90.95 72.08

Number ▲
3F UPS 1 and UPS 2 Rooms Load on. Inverter. Bypass. Battery.
1 3F UPS 1 unit Load on Inverter Normal - -
2 3F UPS Battery 1 - - - Normal
3 3F UPS 2 unit Load on Inverter Normal - -
4 3F UPS Battery 2 - - - Normal

Remarks

Chiller 2 with fault - awaiting for projects development.