STRUCTURAL SPECIFICATIONS A B B1 C

A.) CONCRETE : 6.10


A.1) COLUMNS..................................................................................... f ' c = 21 MPa (3,000 psi) @ 28TH DAY 3.05 3.05
A.2) FOOTINGS, REINFORCED CONCRETE WALLS, STAIRS,
& FOOTING TIE BEAMS................................................................. f ' c = 21 MPa (3,000 psi) @ 28TH DAY E SCHEDULE OF COLUMN
A.3) SUSPENDED SLABS, BEAMS & GIRDERS...................................... f ' c = 21 MPa (3,000 psi) @ 28TH DAY
A.4) GROUND FLOOR SLAB ON FILL.................................................... f ' c = 17 MPa (2,500 psi) @ 28TH DAY S1 4 SCALE NTS

A.5) OTHERS NOT SPECIFIED.............................................................. f ' c = 21 MPa (3,000 psi) @ 28TH DAY
C-1 2B - 4 C-2 2B - 4 C-2
B.) REINFORCEMENT : 1
B.1) ALL MILD REINFORCING BARS SHALL BE ROUND DEFORMED CONFORMING TO AST A-615
fy = 276 MPa( 40,000 psi )

2B - 7

2B - 6

2B - 5
3.55
B.2) ALL REINFORCING BAR DIAMETER IN MILLIMETER INDICATED ON THE OTHER PLANS SHOULD BE STRICKLY
FOLLOWED. ANY DEVIATION FROM THOSE SPECIFIED SHALL HAVE THE WRITTEN APPROVAL OF THE
STRUCTURAL ENGINEER. C-1 2B - 3 C-1 2B - 3
B.3) WHERE SPLICING IS REQUIRED; SLAB, BEAM & GIRDER REINFORCING BARS SHALL BE SPLICED AT 2 C-1
QUARTER POINT AND A MINIMUM LENGTH OF 40 TIMES THE DIAMETER OF THE BAR.
B.4) COLUMN VERTICAL BARS SHALL BE SPLICED AT THE MID-FLOOR HEIGHT, AND A MINIMUM LENGTH OF

9.10
40D ALSO. NOT MORE THAN 50% OF THE TOTAL NUMBER OF BARS SHALL BE SPLICED AT ANY

2B - 7

2B - 6

2B - 5
3.40
GIVEN SECTION.
B.5) ALL REINFORCING BARS SHALL BE WELDABLE.
C-1 C-1 C-1
2B - 2 2B - 2
C.) STRUCTURAL STELL : 3 2B - 2 2B - 2 C-1
C-1

2B - 8

2B - 6

2B - 5
C.1) ALL STRUCTURAL STELL BOTH ANGLES AND STELL PLATES SHALL CONFORM TO ASTM A36

2.15
............................................................................................................... fy = 248 MPa ( 36,000 psi )
C.2) WELDING ELECTRODES SHALL BE E70XX SERIES. C-1
C.3) MACHINE BOLTS AND ANCHOR BOLTS SHALL CONFORM TO ASTM A-325. 3a C-1 2B - 1 2B - 1
C-1

E.) STANDARD CONSTRUCTION AND RESPONSIBILITY OF THE CONSTRUCTOR TO PROVIDE SHEET PILES,

2B - 6
2B - 8
PRECAUTIONARY MEASURES TO ENSURE SAFETY OF ADJACENT PROPERTIES AND OCCUPANTS.

C-1 C-1

2B - 1

A B B1 C
7.90 B SECOND FLOOR FRAMING PLAN
SCALE 1:100 MTS
3.05 S1 4

A B B1 C
6.10
2.00

3.05 3.05
C1-F2 C2-F3 C2-F3
D SCHEDULE OF FOOTING
WF-1 WF-1 S1 4 SCALE NTS

1
WF-1
3.55

WF-1

C-1 RB - 4 C-2 RB - 4 C-2


WF-2 1
C1-F2 C1-F2 C1-F2 F-1
WF-2
11.10

RB - 7

RB - 6

RB - 5
3.55

F-2
2
F-3
WF-2
F-4
WF-1
WF-1

WF-2
3.40

C-1 RB - 3 C-1 RB - 3 C-1


2
8.95

C1-F2 C1-F2 C1-F2


RB - 7

RB - 6

RB - 5
3
3.40
WF-1

WF-1

C1-F2 WF-1 10MM ∅ rsb @


2.15

0.40M 0.C. BW
TYP. TO ALL SLAB
ON GRADE C-1 C-1
RB - 2 RB - 1
3a 2 3 C-1
RB - 7

1 RB - 2 C-1
2B - 6

2B - 5
2.00

C1-F2 WF-1 C1-F2


RB - 1
C-1
C1-F3 C1-F2
4 RB - 1
C-1

FOUNDATION PLAN C ROOF DECK FRAMING PLAN


A
SCALE 1:100 MTS
S1 4 SCALE 1:100 MTS S1 4

TWO-STOREY RESIDENTIAL BUILDING WITH ROOF DECK 5


S1
4