PROJECT
ACTIVITIES:
July 2023
1
Cameroon in general and the Far North Region in particular has been marked since
2014 by a growing security crisis, the object of the Islamic sect Boko Haram. Cross-
border security crisis between Cameroon and Nigeria which limits the combined
efforts of the Cameroonian government and development organizations on the
ground. Suicide bombings, assassinations, hostage-taking and the illusory promise of
a better life are all arguments put forward by the sect to unemployed young people in
the Far North Region, one of the poorest in the Cameroon. This crisis has not only
pushed a certain population of the border areas dedicated to development to leave
their villages abandoning their daily activities to go to Maroua, head of the Far North
Region.
The HIMO (High Intensity of Labor) project initiated by the Urban C2D Program
"Regional Capitals" of the Ministry of Housing and Urban Development (MINHDU) led
by the ILO in Maroua aims to promote the optimal use of locally available resources
(labour, materials , local know-how) with a view to reducing poverty, creating massive
jobs for young people, respecting gender, in short, social cohesion and the search for
peace.
It is a question on the one hand that during construction site works supervised by the
ILO, to organize into associations of different construction trades, the young people
recruited for the execution of the said works in order to promote their access to the
long-term employment (by continuing to manufacture and lay paving stones as well
as constructing drains) after the work on the site has been completed. Beyond the
practical training on construction techniques for the construction of urban
infrastructure received during the execution of the works, these young people will
also be able to manage income-generating activities so as to ensure greater job
creation and economic opportunities at the level of urban communities .
On the other hand, women from poor families in the neighborhoods surrounding the
mountains of the city of Maroua have made stone their main livelihood activity
through crushing. This makes it possible to provide construction companies and the
public (ILO works) with gravel intended for construction work. However, the practice
of this activity by these women is not at all easy, given the rudimentary equipment
used in the crushing, harsh climatic conditions and especially the absence of a good
associative organization in the sale of their product.
The existence of associations for construction trades alongside associations of
women crushing stones from Maroua therefore ultimately constitutes an opportunity
through the complementarity of activities in the sale and use of aggregates. But, to
achieve this, support is needed for both types of associations and their synergy of
action.
B- Specific objectives
The specific objectives are to:
- Make women stone crushers aware of the associative and financial spirit;
2
- Strengthen the organizational capacities of members;
- Improve members' production techniques;
- Master the techniques of raw material supply by women;
- Market the product of its members;
- Promote good citizenship and the associative spirit of its members;
- Improve the standard of living of its members.
C- Expected results
As expected results, we have:
- Construction associations, Decentralized Territorial Collectivities and the
population are sufficiently informed of the activities of the association;
- The association's products are available in quantity;
- The priority for the sale of gravel granted to associations of construction works
in HIMO of the city;
- The members have new production techniques;
- Considerable reduction of time in production;
- Reduced risk of injury to limbs in production;
- The members trust the association;
- The members have a new vision of their association;
- “The association lives”.
D- Indicators
o At least 40 members of associations of women stone crushers in Maroua are
trained in the use of the new crushing equipment and in small financial
management;
o At least 40 members of women's associations are trained in the associative
spirit and capable of carrying out a situation analysis;
o At least 15 women, members of associations of women stone crushers trained
are able to replicate the content of the training within their associations;
o At least 2 associations of women stone crushers trained put into practice the
content of the training and do their job well.
E- Direct beneficiaries
The direct beneficiaries are the women stone crushers of Maroua.
F- Indirect beneficiaries
The indirect beneficiaries we have:
Construction establishments and companies;
Decentralized Territorial Communities;
The populations of Maroua.
2) Methodology of work
3
The project will be based exclusively on sensitization, communication and training of
members of associations of women crushing stones from Maroua in workshops. The
working methodology will focus on the following approaches:
Awareness and communication;
Training meetings;
Plenaries;
Workshop working group session;
Dissemination of reports;
Monitoring and coaching (15 days).
H- Attendees
In total, at least 60 participants will benefit from this training.
I- Logical context
6. Promotethe civic-
Discipline of members;
mindedness and
Primacy of the collective Field surveys
associative spirit of its
interest.
members
4
Ability to heal;
7. Improvethe Ability to send children to
standard of living of school; Field surveys
its members Ability to feed;
Ability to dress.
THEconstruction -Purchase of the gravel
associations, the (product) of the association by
Decentralized the stakeholders; -Bill of sales ;
Territorial - Advice support. -Sales agreement ;
Collectivities and the -Sales register;
population are -Letter, press
sufficiently informed release, report, etc.
of the activities of the
association
THEassociation Existence of stocks on the sites;
Field surveys;
products are available
in quantity
Theregravel sales Delivery of gravel to HIMO -Bill of sales ;
priority given to the construction associations - Sales
city's labour-intensive contract/agreement
construction works (field investigation)
associations
-Increase in the quantity of
Expected production; Production
results THEmembers have -Reduction of production time; tools/materials
new production - Reduced risk of injury (field surveys)
techniques
3- Awareness-raising and
5
information
workshops/meetings for
women stone crushers in
Maroua on the issues
(advantages, disadvantages,
community spirit, etc.) of
their profession.
6- Workshops/Meetings to vote
on the founding texts
(statutes, internal regulations
and electoral code) of the
association and the
members of the Executive
Board.
7- Training
workshops/meetings for
women stone crushers in
Maroua, particularly those of
the Association's Executive
Office, in the administrative
and financial management of
an association.
6
Preconditions
J- Chronogram of activities
Activities Week 1 Week 2 Week 3 Week 4 Week 5
Working session with the BIT Maroua team for X
consultation before the start of the service
Field trip to meet women stone crushers to make X
contact and appointments for awareness and training
meetings/workshops
Awareness-raising and information X
workshops/meetings for women stone crushers in
Maroua on the issues (advantages, disadvantages,
community spirit, etc.) of their profession.
Workshops/meetings for the supervision and training X
of women stone crushers from Maroua to the
knowledge of the founding texts of an association
(statutes, internal regulations and electoral code).
Support for the stone-crushing women of Maroua in
the design and development of their statutes X
(statutes, internal regulations and electoral code) of
association.
Workshops/Meetings to vote on the founding texts X
(statutes, internal regulations and electoral code) of
the association and the members of the Executive
Board.
Training workshops/meetings for women stone X
crushers in Maroua, particularly the Executive Office
of the association, in the administrative and financial
management of an association.
Preparation and legalization of the founding texts of X X X
the association with the administrative authorities
Evaluation of workshops/meetings, reporting and X
dissemination of reports
Coaching of associations of women crushing X X
stones in Maroua
K- Technical Organization
1) Working session with the BIT Maroua team for consultation before the
start of the service
This phase consists for the service provider of meeting with the members of the
Maroua ILO team for the presentation of the work methodology, receiving
recommendations, being at the same level of information before the start of the
service.
2) Field trip to meet women stone crushers to make contact and
appointments for awareness and training meetings/workshops
The purpose of this phase is to meet the women crushing the stones of Maroua, to
inform them of the object of our mission, to collect their feelings and to draw up a
program for the realization of the various activities to be carried out.
7
3) Awareness-raising and information workshops/meetings for women
stone crushers in Maroua on the issues (advantages, disadvantages,
community spirit, etc.) of their profession.
These meetings will be decisive. Because they will allow women to assess the quality
of the draft statute, rules of procedure and electoral code before the vote. It is only
after this assessment that they will vote on the founding texts of their association and
the members of the Executive Board who will have to lead the association for a
determined period.
This meeting will consist in offering women, members of this association, the basics
of administrative and financial management. Because they (the members of the
Executive Board) will be called upon to perform acts of management and
administration for the benefit of their association. It is therefore necessary for these to
be capable in the domains.
8
administrative authorities for a credibility of the structure. We are therefore led to
make them equalize it.
L- Means Available
1) Human resources
At this level, an individual consultant provides the service according to the objectives
set by the representative (ILO) and will allow the members of the association to take
ownership of the lessons learned.
2) Material resources
The material means consist on the one hand of the provision of the room to house
the workshops/meetings, chairs, tables instead of the site of the
workshops/meetings. On the other hand, participant and health kits for COVID-19.
3) Financial resources
The overall financial cost of the project is:
Either detailed plan below:
No Designation Number Num H/Days Unit price Total price
. ber/
days
01 Working session with the 01 01 Consultant 60,000 FCFA 60,000 FCFA
BIT Maroua team for
consultation before the
start of the service
9
the supervision and Consulting 25,000 FCFA 50,000 FCFA
training of women stone Assistant
crushers from Maroua to
the knowledge of the
founding texts of an
association (statutes,
internal regulations and
electoral code).
5 Support for the stone- 02 02 Consultant 60,000 FCFA 120,000 FCFA
crushing women of
Maroua in the design and
development of their
statutes (statutes, internal
regulations and electoral
code) of association.
6 Workshops/Meetings to 02 02 Consultant 60,000 FCFA 120,000 FCFA
vote on the founding texts Consulting 25,000 FCFA 50,000 FCFA
(statutes, internal Assistant
regulations and electoral
code) of the association
and the members of the
Executive Board.
7 Training 02 02 Consultant 60,000 FCFA 120,000 FCFA
workshops/meetings for Consulting 25,000 FCFA 50,000 FCFA
women stone crushers in Assistant
Maroua and the
Association's Executive
Office in the
administrative and
financial management of
an association.
8 Preparation and 01 05 Consultant 60,000 FCFA 300,000 FCFA
legalization of the
founding texts of the
association with the
administrative authorities
9 Evaluation of 01 02 Consultant 60,000 FCFA 120,000 FCFA
workshops/meetings,
reporting and
dissemination of
reports
10 Coaching of 01 05 Consultant 60,000 FCFA 300,000 FCFA
associations of women
crushing stones in
Maroua
11 Room and equipment (01)Room; 08 / Package 25,000 FCFA
needed for workshop 65 chairs; 08 / 200FCFA 104,000 FCFA
(chairs, tables and Tables, 02 / Package 20,000 FCFA
training kits + COVID-
19 health) 65 Training Kits 08 / 500FCFA 32,500 FCFA
10
regulations for 02
associations;
08 copies of the
electoral code for
02 associations;
04 copies of
general report of
activities
TOTAL 1 2.607 500FCFA
A- Overall objective
The overall objective is to empower young people (girls and boys) in the city of
Maroua through decent work in construction and labour-based construction.
B- Specific objectives
The specific objectives are to:
- Raise the awareness of young people (girls and boys) from associations of
construction trades in HIMO on civic-mindedness and the associative spirit;
- Significantly increase decent employment in labour-intensive construction
trades;
- Sustainably reduce unemployment and poverty among young people in the
city of Maroua;
- Satisfy local demand for labour-intensive projects;
- Associate by type of labour-intensive activity;
- Sustainably increase the income of young members of associations;
- Strengthen the organizational capacities of young members of associations;
- Master the techniques of raw material supply by young people;
- Work sustainably in synergy with the CTDs of the city of Maroua, in particular
the CUM for HIMO projects;
C- Expected results
As expected results, we have:
- The approachHIMO is integrated into the intervention strategies of the Urban
Community as a tool for managing conflicts and consolidating peace.
- Darebelowaceyouruvsyouurarearbhavenotare you
sonthasmenotageeseyoudesoppositertunIyoues d'epmlawsdecentssont
creeespourareIeAarepoarLerenewsrThisment detherenotixeyouofthe
rareheyinvsand sovsIoheconamee to workersL'usedyouIohnotof
theapprockareHIMB;
- The Decentralized Territorial Collectivities and the population of the city are
sufficiently informed of the activities of association of young people in
construction in HIMO;
11
- Breakdown of association activities in HIMO by type of activity;
- Association members are available to carry out HIMO works in the city;
- The provision to them by the Urban Community of working materials;
- Collaboration with members of women stone crushers associations for the
availability of aggregates;
- The members trust the association;
- The members have a new vision of their association;
- “The association lives”.
D- Indicators
o At least 900 trained young people (girls and boys) are ready to join forces to
carry out labour-intensive construction activities in the city;
o At least 900 young people (girls and boys) who are members of labor-
intensive construction trade associations are trained in the spirit of association
and capable of carrying out a situation analysis;
o 900 young people are sensitized, trained and grouped into associations by
HIMO activities;
o At least 03 associations of young people (girls and boys) from different sectors
of construction and labour-intensive activities have been created and are in
operation;
o At least 03 associations of young people (girls and boys) from different sectors
of construction and labour-intensive construction work in synergy with the
associations of women stone crushers;
o At least 03 associations of young people (girls and boys) from different sectors
of construction and labour-intensive activities collaborate with the Urban
Community for the implementation of labour-intensive projects.
E- Direct beneficiaries
The direct beneficiaries are young people (girls and boys) from different sectors of
construction and labour-based construction activities in Maroua.
F- Indirect beneficiaries
The indirect beneficiaries we have:
Decentralized Territorial Communities;
Associations of women stone crushers in Maroua;
The populations of Maroua.
12
Plenaries;
Workshop working group session;
Dissemination of reports;
Monitoring and coaching (15 days).
H- Attendees
In total, at least 900 young people (girls and boys) will benefit from this training.
I- Logical context
-Presence/permanent existence
4. Satisfyat the local of associations of young people
Field surveys
request in HIMO project (girls and boys) in construction
trades in local HIMO
13
7.Strengthenthe
organizational Holding training and awareness -Attendance
capacities of young workshops; record ;
members of - Minutes/report
associations
-Reduction of the cost of the raw
8. Mastertechniques for material; Partnership
supplying raw materials -Partnership with associations of agreement/partners
by young people; stone-crushing women; hip agreement
14
Collaborationwith Existence of a
members of stone partnership/partnership
crusher women's agreement Agreement or
associations for the partnership
availability of
aggregates
THEmembers trust the - Fewer disputes;
- Respect for the texts Field investigation
association
- Trust in the association;
The members have a -Existence of associative spirit; Existence of
new vision of their -Increased income; statutes, internal
association, "the - Legalization of the founding regulations and
association lives" texts of the association electoral code
4. Workshops/meetings for
supervision and training of young
people (girls and boys) in labour-
intensive trades of the BIT of
Maroua to the knowledge of the
founding texts of an association
(statutes, internal regulations and
electoral code).
15
young people (girls and boys) in
labour-intensive trades of the BIT in
Maroua in particular and of the
Executive Office of their
associations in administrative and
financial management.
Preconditions
J- Chronogram of activities
Activities Week 1 Week 2 Week 3 Week 4 Week 5
16
and boys) in labour-based trades of the ILO in
Maroua
K- Technical Organization
1) Working session with the BIT Maroua team for consultation before the
start of the service
This phase consists for the service provider of meeting with the members of the
Maroua ILO team for the presentation of the work methodology, receiving
recommendations, being at the same level of information before the start of the
service.
2) Descent into the field, meetingyoung people (girls and boys) in labour-intensive
occupations to make contact and make appointments for awareness-raising and training
meetings/workshops
The purpose of this phase is to meet young people (girls and boys) from the labour-
based professions of Maroua, to inform them of the purpose of our mission, to collect
their feelings and to draw up a program for the realization of the various activities to
be carried out.
It is a question here of sensitizing, informing and educating the young people (girls
and boys) of the HIMO trades of Maroua to the advantages linked to their activity to
the disadvantages but above all, to the need to have an associative spirit for the
improvement their working and living conditions.
17
6) Workshops/Meetings for the vote of the founding texts (statutes, internal
regulations and electoral code) of the association and the members of
the Executive Board
These meetings will be decisive. Because, they will allow young people (girls and
boys) to appreciate the quality of the draft statute, rules of procedure and electoral
code before the vote. It is only after this assessment that they will vote on the
founding texts of their association and the members of the Executive Board who will
have to lead the association for a determined period.
This meeting will consist of offering young people, members of this association, the
basics of administrative and financial management. Because, they (the members of
the Executive office) will be brought to carry out acts of management and
administration with the profit of their association. It is therefore necessary that these
are capacities in the domains.
L- Means Available
1) Human resources
The individual consultant ensures at this level, the service according to the objectives
fixed by the agent (ILO) and will allow the members of the association to appropriate
the lessons received.
4) Material resources
18
The material means consist on the one hand of the provision of the room to house
the workshops/meetings, chairs, tables instead of the site of the
workshops/meetings. On the other hand, participant and sanitary kits for COVID-19.
5) Financial resources
The overall financial cost of the project is:
Either detailed plan below:
No Designation Number Num H/Days Unit price Total price
. ber/
days
01 Working session with 01 01 Consultant 60,000 FCFA 60,000 FCFA
the BIT Maroua team
for consultation before
the start of the service
19
6 Workshops/Meetings 02 02 Consultant 60,000 FCFA 120,000 FCFA
to vote on the founding Consulting 25,000 FCFA 50,000 FCFA
texts (statutes, internal Assistant
regulations and
electoral code) of
associations and
members of the
Executive Board.
7 Training 01 01 Consultant 60,000 FCFA 60,000 FCFA
workshops/meetings Consulting 25,000 FCFA 25,000 FCFA
for young people (girls Assistant
and boys) in the
labour-intensive trades
of the ILO in Maroua
and the Executive
Office of their
associations in
administrative and
financial management
8 Drafting and legalization 01 05 Consultant 60,000 FCFA 300,000 FCFA
of the founding texts of Consulting 25,000 FCFA 125,000 FCFA
the associations with the Assistant
administrative authorities
9 Evaluation of 01 01 Consultant 60,000 FCFA 60,000 FCFA
workshops/meetings, Consulting 25,000 FCFA 25,000 FCFA
reporting and Assistant
dissemination of
reports
10 Coaching of 01 05 Consultant 60,000 FCFA 300,000 FCFA
associations of young
people (girls and boys)
in labour-based trades
of the ILO in Maroua
11 Room and equipment (01)Room; 06 / Package 25,000 FCFA
needed for workshop 200 chairs; 06 / 200FCFA 240,000 FCFA
(chairs, tables and Tables, 02 / Package 20,000 FCFA
500 Training Kits 06 / 500FCFA 250,000 FCFA
20
GENERAL TOTAL: T1 + T2 = 2,607,500 FCFA + 3,307,000 FCFA 5.914 500FCFA