ATTENDEES: PRESENT

George P. Obra (Scrum Master)


Danny Tay Tiong (OIC)
Benjie M. Domado (AR)
Leoncio L. Garcia (ME)
Ivan Yvanez (EE)
Keziah Zerrudo(MPO)
Rolly Dumpay (QA/QC)
Salvador B. Oghayon (HSE Officer)
Elijay Soliman (DRAFTSMAN)

DAILY SCRUM MEETING (9.30AM to 9:45 AM)

Team member Description Mon, Sep 4, 23 Tue, Sep 5, 23 Wed, Sep 6, 23 Thu, Sep 7, 23 Fri, Sep 8, 23 Sat, Sep 9, 23

Back Log Tank Walls and Retaining Walls

1) One Side Formwork, 2)Water


To Do
Stop, 3) Closing Formwork.
Danny Tay Tiong (OIC)
Doing

Done

Back Log

To Do
Benjie M. Domado (AR)
Doing

Done

Back Log

To Do
Leoncio L. Garcia (ME)
Doing

Done

Back Log

To Do
Ivan Yvanez (EE)
Doing

Done

Back Log

To Do
Keziah Zerrudo(MPO)
Doing

Done

Back Log Concrete Repair

To Do Internal Side patching


Rolly Dumpay (QA/QC)
Doing External side patching

Done

Back Log

To Do
Salvador B. Oghayon (HSE
Officer)
Doing

Done

Back Log

To Do
Elijay Soliman
(DRAFTSMAN)
Doing

Done