Version  Run By Checked By Comment
Test Number Description Version QTG Planned for Result Date Result DGAC
MQTG Name Date Name Date /MQTG /Notes
November Vincent
1 1 17/03/2022 Pass
1a.01.1 Minimum Radius of Turn 2021 Herbin

Vincent
Rate of Tum vs.NWA (10 December 17/03/2022 Pass
1a.02.1 1 1 Herbin
kts) 2021

Vincent
Rate of Tum vs.NWA (20 2 2 February 17/03/2022 Pass
1a.02.2 Herbin
kts) 2022

Ground Acceleration time 2 2


1b.01.1 May 2022
and distance

Vincent
5 5 November 17/03/2022 check
1b.02.1 VMCG Herbin
2021

Vincent
4 4 December 17/03/2022 Pass
1b.03.1 Minimum Unstick Speed Herbin
2021

Vincent
3 3 February 17/03/2022 Pass
1b.04.1 Normal Take Off Herbin
2022

Critical Engine Failure on 4 4


1b.05.1 May 2022
take off

Vincent
November 17/03/2022 Pass
1b.06.1 Crosswind Take Off 3 3 Herbin
2021

Vincent
December 17/03/2022 Pass
1b.07.1 Rejected Take Off 3 3 Herbin
2021

Vincent
Dynamic Engine Failure 1 1 February 17/03/2022 Pass
1b.08.1 Herbin
after Take-off 2022

12 12
1c.01.1 Normal Climb May 2022

Vincent
One Engine out climb - 5 5 November 17/03/2022 Pass
1c.02.1 Herbin
second segment 2021

Vincent
One Engine out climb -En 2 2 December 17/03/2022 Pass
1c.03.1 Herbin
route 2021

Vincent
one Engine out climb - 1 1 February 17/03/2022 Pass
1c.04.1 Herbin
approach 2022

1 1
1c.05.1 Level Acceleration cruise May 2022

Vincent
1 1 November 17/03/2022 Pass
1c.05.2 Level Deceleration cruise Herbin
2021

1 1
1d.01.1 Cruise Performance July 2022

Vincent
Deceleration-Brks light 1 1 17/03/2022 Pass
1e.01.1 March 2022 Herbin
weight

Deceleration-Brks medium 2 2
1e.01.2 May 2022
Weight

Vincent
Deceleration-Brks maximum 1 1 November 17/03/2022 Pass
1e.01.3 Herbin
Weight 2021

Vincent
Deceleration-Reverse 1 1 December 17/03/2022 Pass
1e.02.1 Herbin
Thrust Light Weight 2021

Vincent
Deceleration-Reverse 1 1 17/03/2022 Pass
1e.02.2 March 2022 Herbin
Thrust medium Weight

Deceleration-Reverse 1 1
1e.02.3 May 2022
Thrust maximum Weight

Vincent
Stopping Distance -Wet 1 1 November 17/03/2022 Pass
1e.03.1 Herbin
Runway 2021

Vincent
Stopping Distance Icy 3 3 December 17/03/2022 Pass
1e.04.1 Herbin
Runway 2021

Vincent
Engine 1 go around EPR 1 1 17/03/2022 Pass
1f.01.1 March 2022 Herbin
mode

Engine 2 go around EPR 1 1


1f.01.2 May 2022
mode

Vincent
Engine 1 accel/decel-sea 1 1 November 17/03/2022 Pass
1f.02.1 Herbin
level 2021

Vincent
Engine 2 accel/decel-sea 1 1 December 17/03/2022 Pass
1f.02.2 Herbin
level 2021

Column position vs force 1 1


2a.01.1 June 2022
and surface position

Column hardware 1 1
2a.01.2 May 2022
calibration check

Vincent
2 2 17/03/2022 check do manual
wheel position vs force and November Herbin
2a.02.1
surface position 2021

Vincent
wheel position vs spoiler 1 1 December 17/03/2022 Pass
2a.02.2 Herbin
position 2021

Vincent
wheel hardware calibration 1 1 17/03/2022 Pass
2a.02.3 March 2022 Herbin
check

Pedal position vs force and 1 1


2a.03.1 May 2022
surface position

Vincent
Pedal hardware calibration 1 1 November 17/03/2022 Pass
2a.03.2 Herbin
check 2021

Vincent
1 1 17/03/2022 check do manual
Noseweheel steering force December Herbin
2a.04.1
and position 2021

Vincent
Noseweheel steering 1 1 17/03/2022 Pass
2a.04.2 March 2022 Herbin
hardware calibration check

Rudder Pedal Steering 1 1


2a.05.1 May 2022
Calibration

Vincent
Pitch Trim Calibration 1 1 November 17/03/2022 Pass
2a.06.1 Herbin
Indicator vs computed 2021

Vincent
1 1 January 17/03/2022 Pass
2a.06.2 Pitch Trim Rate Ground Herbin
2022

1 1
2a.06.3 Pitch Trim Rate go around August 2022

Power lever angle vs engine 1 1


2a.07.1 May 2022
parameter

Vincent
Brake Pedal position vs 1 1 November 17/03/2022 Pass
2a.08.1 Herbin
force- left pedal 2021

Vincent
Brake Pedal position vs 1 1 January 17/03/2022 Pass
2a.08.2 Herbin
force- right pedal 2022

Vincent
Brake Pedal Hardware 1 1 17/03/2022 Pass
2a.08.3 March 2022 Herbin
Calibration check

Vincent
column dynamics forward 1 1 January 17/03/2022 Pass
2b.01.1 Herbin
TO 2022

Thomas Le
column dynamics Aftward 1 1 22/04/2022 Fail
2b.01.2 April 2022 Bouedec
TO

Vincent
column dynamics forward 1 1 January 17/03/2022 Pass
2b.01.3 Herbin
cruise 2022

Vincent
1 1 17/03/2022 check rerun
column dynamics Aftward Herbin
2b.01.4 March 2022
cruise

Vincent
1 1 17/03/2022 check rerun
Herbin
column dynamics forward January
2b.01.5
Landing 2022

Vincent
17/03/2022 check rerun
column dynamics Aftward November Herbin
1 1
landing 2021
2b.01.6

1 1
Wheel Dynamics June 2022
2b.02.1

1 1
2b.03.1 Pedal dynamic June 2022

Small column Input


2b.04.1 1 1 May 2022
(Cruise)

Small column Input 1 1


2b.04.2 June 2022
(Approach)

Vincent
1 1 January 17/03/2022 Pass
2b.04.3 Small wheel Input (Cruise) Herbin
2022

Vincent
Small wheel Input 17/03/2022 Pass
2b.04.4 1 1 March 2022 Herbin
(Approach)

1 1
2b.04.5 Small pedal Input ( cruise) June 2022

Vincent
Small pedal Input ( 1 1 17/03/2022 Pass
2b.04.6 March 2022 Herbin
Approach)

Vincent
Power Change Dynamics 1 1 January 17/03/2022 Pass
2c.01.1 Herbin
Approach to go around 2022

Flap slat Change Dynamics-


2c.02.1 1 1 July 2022
Retraction

Flap slat Change Dynamics-


2c.02.2 1 1 June 2022
extension

Speed brake change


2c.03.1 2 2 August 2022
Dynamics-Extension

Vincent
Speed brake Dynamics- January 17/03/2022 Pass
2c.03.2 2 2 Herbin
cruise Retraction 2022

Gear Change Dynamics- 1 1


2c.04.1 July 2022
Retraction TO

Gear Change Dynamics - 1 1


2c.04.2 June 2022
Extension landing

Gear operating time-


2c.05.1 1 1 May 2022
extension -approach

Vincent
Gear operating time- 1 1 December 17/03/2022 Pass
2c.05.2 Herbin
Retraction -TO 2021

Alternate gear operating 1 1


2c.05.3 July 2022
time-Extension

Flap operating time- 1 1


2c.05.4 June 2022
Extension

Vincent
Flap operating time- 2 2 December 17/03/2022 Pass
2c.05.5 Herbin
Retraction 2021

Vincent
Alternate flap operating 1 1 January 17/03/2022 Pass
2c.05.6 Herbin
time-Extension 2022

Alternate flap operating time- 1 1


2c.05.7 July 2022
Retraction-TO

2 2
2c.06.1 Longitudinal Trim -cruise June 2022

Vincent
1 1 December 17/03/2022 Pass
2c.06.2 Longitudinal Trim -approach Herbin
2021

Vincent
1 1 January 17/03/2022 Pass
2c.06.3 Longitudinal Trim- landing Herbin
2022

Vincent
Longitudinal Manoeuvering 2 2 17/03/2022 Pass
2c.07.1 March 2022 Herbin
Stability - cruise

Longitudinal Manoeuvering 2 2
2c.07.2 June 2022
Stability - approach

Vincent
Longitudinal Manoeuvering 2 2 December 17/03/2022 Pass
2c.07.3 Herbin
Stability - landing 2021

Vincent
Longitudinal Static Stability - 2 2 January 17/03/2022 Pass
2c.08.1 Herbin
approach 2022

Stall Characteristics - High 1 1 August 2022


2c.08.3
Speed Turning Stall

stick shaker Stall, buffet- 2 2


2c.09.1 July 2022
second segment

stick shaker Stall, buffet- 2 2


2c.09.2 June 2022
approach landing

Vincent
1 1 December 17/03/2022 Pass
2c.10.1 Phugoid dynamics Herbin
2021

Vincent
Short Period dynamics- 2 2 January 17/03/2022 Pass
2c.11.1 Herbin
cruise 2022

Thomas Le
Minimum Control Speed Air 2 2 22/04/2022 Pass
2d.01.1 April 2022 Bouedec
(VMCA)

1 1
2d.02.1 Roll Response -cruise June 2022

Roll Response- approach 1 1


2d.02.2 August 2022
landing

Vincent
Roll response to step Input- January 17/03/2022 Pass
2d.03.1 1 1 Herbin
approach landing 2022

Thomas Le
22/04/2022 Pass
2d.04.1 Spiral Stability (roll right) 1 1 April 2022 Bouedec

2d.04.2 Spiral Stability (roll left) 1 1 June 2022

Engine Inoperative Trim- 2 2


2d.05.1 August 2022
second segment

Vincent
Engine Inoperative Trim- 2 2 January 17/03/2022 Pass
2d.05.2 Herbin
approach landing 2022

Thomas Le
Rudder Response - 2 2 22/04/2022 Pass
2d.06.1 April 2022 Bouedec
approach landing- Y/D ON

Rudder Response - 1 1
2d.06.2 June 2022
approach landing- Y/D OFF

1 1
2d.07.1 Dutch Roll Y/D OFF- cruise August 2022

Vincent
Dutch Roll-Y/D OFF- 2 2 January 17/03/2022 Pass
2d.07.2 Herbin
approach landing 2022

Thomas Le
5 5 22/04/2022 Pass
2d.08.1 Steady State Sideslip April 2022 Bouedec

Normal Landing Light 6 6


2e.01.1 June 2022
Weight

Thomas Le
2 2 22/04/2022 Pass
April 2022 Bouedec
Normal Landing Medium
2e.01.2
Weight

Vincent
Normal Landing heavy 2 2 January 17/03/2022 Fail
2e 01 3 Herbin
2e.01.3
Weight 2022

2e.02.1 Minimum Flap Landing 10 10 April 2022

5 5
2e.03.1 Crosswind Landing June 2022

One Engine lnoperative 2 2


2e.04.1 August 2022
Landing

5 5
2e.05.1 Autoland August 2022

Thomas Le
2 2 22/04/2022 Pass
2e.06.1 Go Around-Normal April 2022 Bouedec

Go Around-Engine 1 1
2e.06.2 June 2022
Inoperative

Directional Control with


2e.07.1 2 2 August 2022
reverse thrust

Vincent
Directional Control with 4 4 February 17/03/2022 Pass
2e.07.2 Herbin
asymetric reverse thrust 2022

Thomas Le
22/04/2022 Pass
2f.01.1 Ground Effect landing 1 1 April 2022 Bouedec

Reduced brake effect with


2g.01.1 2 2 August 2022
temperature (fade ON)

Reduced brake effect with


2g.01.2 2 2 August 2022
temperature (fade OFF)

Windshear-WTA 1 (prior to 1 1
2h.01.1 August 2022
VR)

1 1
Windshear-WTA 2 (alt lift
2h.01.2 August 2022
off)

1 1
Windshear-WTA 3 initial
2h.01.3 August 2022
climb

Windshear- WTA 4 short 1 1


2h.01.4 August 2022
final

Thomas Le
Motion system Frequency 22/04/2022 Pass
3a.01.1 2 2 April 2022 Bouedec
response 0,1hz , 6 In)

Thomas Le
Motion system Frequency 22/04/2022 Pass
3a.01.2 2 2 April 2022 Bouedec
response 0,1hz , 6 In)

1 1
Motion system Frequency
3a.02.1 July 2022
response 0,5hz , 6 In)

Motion system Frequency 1 1


3a.02.2 July 2022
response 0,5hz , 6 In)

Thomas Le
Motion system single leg 1 1 22/04/2022 Pass
3b.01.1 April 2022 Bouedec
balance 0,5hz , 5 In)

Motion system single leg 1 1


3b.01.2 July 2022
balance 0,5hz , 5 In)

Motion system single leg 1 1


3b.01.3 July 2022
balance 0,5hz , 5 In)

Vincent
Motion system single leg February 17/03/2022 Pass
3b.01.4 1 1 Herbin
balance 0,5hz , 5 In) 2022

Thomas Le
Motion system single leg 22/04/2022 Pass
3b.01.5 1 1 April 2022 Bouedec
balance 0,5hz , 5 In)

Vincent
Motion system single leg 17/03/2022 Pass
3b.01.6 1 1 March 2022 Herbin
balance 0,5hz , 5 In)

Motion system single leg


3b.02.1 1 1 July 2022
balance 3hz , 0,12 In)

Vincent
Motion system single leg February 17/03/2022 Pass
3b.02.2 1 1 Herbin
balance 3hz , 0,12 In) 2022

Thomas Le
Motion system single leg 22/04/2022 Pass
3b.02.3 1 1 April 2022 Bouedec
balance 3hz , 0,12 In)

Motion system single leg


3b.02.4 1 1 July 2022
balance 3hz , 0,12 In)

Vincent
Motion system single leg 17/03/2022 Pass
3b.02.5 1 1 March 2022 Herbin
balance 3hz , 0,12 In)

Vincent
Motion system single leg February 17/03/2022 Pass
3b.02.6 1 1 Herbin
balance 3hz , 0,12 In) 2022

Motion system Turn around


3c.01.1 1 1 August 2022
check jack 1

Motion system Turn around


3c.01.2 1 1 July 2022
check jack 2

Motion system Turn around


3c.01.3 1 1 July 2022
check jack 3

Motion system Turn around


3c.01.4 1 1 August 2022
check jack 4

Motion system Turn around


3c.01.5 1 1 August 2022
check jack 5

Motion system Turn around


3c.01.6 1 1 July 2022
check jack 6

1 1
4a.01.1 Pitch Axis Transport Delay March 2022

1 1
4a.02.1 Roll Transport Delay March 2022

1 1
4a.03.1 Yaw Axis Transport Delay March 2022

Vincent
Continuous Collimated February 17/03/2022 Pass
4b.1.1 Herbin
Cross-Cockpit FOV 2022

Thomas Le
15/04/2022 Pass
4.b.2 System Geometry April 2022 Bouedec

4.b.3 Surface Contrast Ratio July 2022

Vincent
December 17/03/2022 Pass
4.b.4 Highlight brightness Herbin
2021

Vincent
Surface (Vernier) February 17/03/2022 Pass
4.b.5 Herbin
Resolution 2022

Thomas Le
15/04/2022 Pass
4.b.6 Lightpoint Size April 2022 Bouedec

4.b.7 Lightpoint Contrast Ratio July 2022

Vincent
December 17/03/2022 Pass
4.c Visual Ground Segment Herbin
2021