SW comb Pu (KN) Vu (KN) Mu (KN.m)

SW1 VX2N 5890.68 820.5 6754.811


SW2 VX2P 5929.13 814.12 6715.781
SW3 VY2N 10503.13 2004.42 28446.419
SW4 VY1N 10511.98 1967.93 28004.495
SW5 VX1N 7547.74 820.97 4893.683
SW6 VX1P 7497.88 819.94 4856.374

: ‫ﺣﯾث أن اﻟﺗراﻛب اﻟﻣﺳﺗﺧدﻣﺔ ﻫﻲ‬

VY1N = 1.47D.L + 0.55L.L - 1.1Vy1

VX2P = 1.47D.L + 0.55L.L + 1.1 Vx2

VY2N = 1.47D.L + 0.55L.L - 1.1 Vy2

VX2N = 1.47D.L + 0.55L.L - 1.1Vx2

VX1N = 1.47D.L + 0.55L.L - 1.1Vx1

‫ طـــﺎرق ﺑرﻛــــﺎت‬/‫م‬.‫ أﺣﻣــــد اﻟوظـــــﺎف & د‬/ ‫م‬.‫ د‬: ‫إﺷراف‬


2
‫ ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬v

‫و ﺳوف ﻧوﺿﺢ ﻫﻧﺎ ﻣﺛﺎل ﻟﻛﯾﻔﯾﺔ ﺗﺻﻣﯾم ﺟدران اﻟﻘص و ﻗد وﻗﻊ اﻻﺧﺗﯾﺎر ﻋﻠﻰ ﺟدار اﻟﻘص‬

S.W1

Shear reinforcement required

Lw = 3500 mm

tw = 200 mm

Fc = 28 Mpa

Fy = 420 Mpa

When Vu ≥ 0.08 A F – ( . . )

Use minimum reinforcement = 0.0025 along the longitudinal and

transverse axes .

Vu = 830.02 KN

Acv = Lw *tw = 3500 x 200 = 700000 mm2

0.08 x 700000 √28 x 10 = 296.32 KN

Vu= 830.02 KN > 296.32 KN use ρ = 0.0025

‫ طـــﺎرق ﺑرﻛــــﺎت‬/‫م‬.‫ أﺣﻣــــد اﻟوظـــــﺎف & د‬/ ‫م‬.‫ د‬: ‫إﺷراف‬


3
‫ ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬v

* Check one or two layers are used :

At least two curtains of reinforcement shall be used in

a wall if the in-plane factored shear force assigned to the wall exceeds

≥ 0.166 , .7.2.2

0.166 700000 √28 10 = 614.87

Vu= 830.02 KN > 614.87 Use Two curtains


s1 bw
of reinforcement. s1

Use Ø12 mm (As = 113.1 mm 2 ) @ 200mm s2

s2
2 2 113.1
= = = 0.005655 >
200 200
= 0.0025 ,

The Spacing (S = 200 mm ) < (450mm ) ( . . . )

= = 10.2857
.

2 2 113.1
= = = 0.00251 > = 0.0025
450 200

Use Ø 12 mm (As = 113.1 mm ) @ 300mm

‫ طـــﺎرق ﺑرﻛــــﺎت‬/‫م‬.‫ أﺣﻣــــد اﻟوظـــــﺎف & د‬/ ‫م‬.‫ د‬: ‫إﺷراف‬


4
‫ ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬v

: ‫ﺟدول ﯾﺑﯾن ﺣدﯾد اﻟﺗﺳﻠﯾﺢ اﻟﻣﻘﺎوم ﻟﻠﻘوى اﻟﻘﺎﺻﺔ اﻷﻓﻘﻲ واﻟرأﺳﻲ‬

φ= 12 AS= 113.1
Vu Lw tw Sv Sh
NO ( Acv √f'c)/6 ρv ρh Asv (mm^2) Ash (mm^2) V H Remarks
(KN) (mm) (mm) (mm) (mm)
Two
SW1
820.5 3500 200 617.341973 300 200 0.00377 0.00565 753.9822369 1130.973355 Ф@300mm Ф@200mm Layers
Two
SW2
814.12 3500 200 617.341973 300 200 0.00377 0.00565 753.9822369 1130.973355 Ф@300mm Ф@200mm Layers
Two
SW3
2004.4 6000 200 1058.30052 300 300 0.00377 0.00377 753.9822369 753.9822369 Ф@300mm Ф@300mm Layers
Two
SW4
1967.9 6000 200 1058.30052 300 300 0.00377 0.00377 753.9822369 753.9822369 Ф@300mm Ф@300mm Layers
Two
SW5
820.97 3000 200 529.150262 300 200 0.00377 0.00565 753.9822369 1130.973355 Ф@300mm Ф@200mm Layers
Two
SW6
819.94 3000 200 529.150262 300 200 0.00377 0.00565 753.9822369 1130.973355 Ф@300mm Ф@200mm Layers

5
‫ طـــﺎرق ﺑرﻛــــﺎت‬/‫م‬.‫ أﺣﻣــــد اﻟوظـــــﺎف & د‬/ ‫م‬.‫ د‬: ‫إﺷراف‬
‫‪ v‬ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬

‫‪SW1‬‬

‫‪Lw = 3500 mm‬‬

‫‪tw = 200 mm‬‬

‫‪Fc = 28 Mpa‬‬

‫‪Fy = 420 Mpa‬‬

‫‪Vn ≤ Acv αc Fc’ + ρn. Fy‬‬ ‫‪,‬‬ ‫‪. . .‬‬


‫‪ℎ‬‬
‫‪ℎ‬‬ ‫‪ℎ‬‬ ‫‪0.25‬‬ ‫‪≤ 1.5‬‬

‫‪ℎ‬‬
‫‪0.17‬‬ ‫‪≥ 0.17‬‬

‫‪Vu = 830.02 KN‬‬

‫‪Vn = Vu/ φ‬‬ ‫‪=830.02 /0.75 =1106.69 KN‬‬

‫‪Acv = 3500*200 = 700000 mm2‬‬

‫‪h‬‬ ‫‪36‬‬
‫=‬ ‫‪= 10.29 > 2 , αc = 0.17‬‬
‫‪l‬‬ ‫‪3 .5‬‬
‫‪= 700000‬‬ ‫‪0.17 √28 + 0.00377 420‬‬ ‫‪10‬‬ ‫‪=2290.79 KN‬‬

‫‪Vn = 1106.69 KN < 2290.79 KN‬‬ ‫‪OK‬‬

‫إﺷراف ‪ :‬د‪.‬م ‪ /‬أﺣﻣــــد اﻟوظـــــﺎف & د‪.‬م‪ /‬طـــﺎرق ﺑرﻛــــﺎت‬


‫‪6‬‬
‫ ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬v

: ‫ﺟدول ﯾﺑﯾن اﻟﺗﺣﻘق ﻣن اﻟﻣﻘﺎوﻣﺔ اﻷﺳﻣﯾﺔ ﻟﺟدران اﻟﻘص‬

fy Mpa fc Mpa
= 420 = 28
tw=
200 Check of Nominal Shear Strength
Acv(αc √f'c+ρh
NO hw Lw hw/Lw ρh αc Vu Vnd(KN) Remarks
fy)
SW1 36 3500 10.286 0.0057 0.17 820.5 1094 2292.219644 Ok
SW2 36 3500 10.286 0.0057 0.17 814.12 1085.49 2292.219644 Ok
SW3 36 7000 5.1429 0.0038 0.17 2004.4 2672.56 3476.0854 Ok
SW4 36 7000 5.1429 0.0038 0.17 1967.9 2623.91 3476.0854 Ok
SW5 36 3000 12 0.0057 0.17 820.97 1094.63 1964.759695 Ok
SW6 36 3000 12 0.0057 0.17 819.94 1093.25 1964.759695 Ok

Lw
C ≥ ⇒ B. E is Required , . . . ( )
δn
600
hw

Use δn/hw = 0.007

600
C = xd
600 + Fy

d = 0.8 Lw

d = 0.8 x 3500 = 2800 mm

600 x 2800
C = = 1647.0588
600 + 420

Lw 3500
= = 833.33
δn 600 x 0.007
600
hw

→ 1647.0588 ≥ 833.33 ⇒ B. E is Required

‫ طـــﺎرق ﺑرﻛــــﺎت‬/‫م‬.‫ أﺣﻣــــد اﻟوظـــــﺎف & د‬/ ‫م‬.‫ د‬: ‫إﺷراف‬


7
‫ ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬v

: ‫ ﺑطرﯾﻘﺔ اﻷ ازﺣﺎت‬Boundary Element ‫ﺟدول ﯾﺑﯾن اﻟﺗﺣﻘق ﻣن اﺳﺗﺧدام‬

hw= 36 CHECK FOR BOUNDARY ELEMENTS ARE REQUIRED


Lw(mm) d(mm) C=600/(600+fy)*d δU(mm) δU/hw Lw/600*su/hw State
NO
B.E is
SW1 3500 2800 2800 12.2 0.3389 17.21 required
B.E is
SW2 3500 2800 2800 12.2 0.3389 17.21 required
B.E is
SW3 7000 5600 5600 12.2 0.3389 34.43 required
B.E is
SW4 7000 5600 5600 12.2 0.3389 34.43 required
B.E is
SW5 3000 2400 2400 12.2 0.3389 14.75 required
B.E is
SW6 3000 2400 2400 13.2 0.3667 13.64 required

Pu y
Fc = + Mu. ≥ Fca = 0.2Fc ⇒ B. E is Required
Ag Ig

[ ACI 05(sec. 21.7.6.3)]

Mu = 7416.4411KN. m

Pu total 7045.72
Pu = → Pu = = 3522.86 KN
2 2

Y = 0.5 Lw → Y = 0.5 x 3500 = 1750 mm

‫ طـــﺎرق ﺑرﻛــــﺎت‬/‫م‬.‫ أﺣﻣــــد اﻟوظـــــﺎف & د‬/ ‫م‬.‫ د‬: ‫إﺷراف‬


8
‫ ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬v

tw 3500 × 200
Ig = Lw → Ig = = 7.1458 × 10 mm
12 12

Ag = Lw × tw = 3500 x200 = 700000 mm

Fca = 0.2 x28 = 5.6 Mpa

3522.86 x10 7416.441 x 1750x10


Fc = + = 23.19 Mpa
700000 7.4148 × 10

Fc = 23.19 ≥ Fca = 5.6 ⇒ B. E is Required

: ‫ ﺑطرﯾﻘﺔ اﻷﺟﻬﺎدات‬Boundary Element ‫ﺟدول ﯾﺑﯾن اﻟﺗﺣﻘق ﻣن اﺳﺗﺧدام‬

fc
Mpa
= 28 CHECK OF STERSS IN COMPRESSION ZONE
Lw tw Put Mu Ag y fc fc
Pu(KN) Ig(mm^4) Remarks
(mm) (mm) (KN) (KN.m) (mm^2) (mm) (mpa) (all)
NO
B.E is
SW1 3500 200 5891 2945 6754.8 700000 1750 7.15E+11 20.8 5.6
required
B.E is
SW2 3500 200 5929 2965 6715.8 700000 1750 7.15E+11 20.7 5.6
required
B.E is
SW3 7000 200 10503 5252 28446 1400000 3500 5.72E+12 21.2 5.6
required
B.E is
SW4 7000 200 10512 5256 28004 1400000 3500 5.72E+12 20.9 5.6
required
B.E is
SW5 3000 200 7548 3774 4893.7 600000 1500 4.5E+11 22.6 5.6
required
B.E is
SW6 3000 200 7498 3749 4856.4 600000 1500 4.5E+11 22.4 5.6
required

C
Lb = C − 0.1 Lw ≥ , . . . ( )
2

‫ طـــﺎرق ﺑرﻛــــﺎت‬/‫م‬.‫ أﺣﻣــــد اﻟوظـــــﺎف & د‬/ ‫م‬.‫ د‬: ‫إﺷراف‬


9
‫ ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬v

600
=
(600 + )

= 3500

= 0.8 = 0.8 3500 = 2800

600 2800
= = 200 → = = 1647.058
600 + 420

→ = 1647.058 − 0.1 3500 = 1297.058

1647.058
→ = = = 823.529
2 2

= 1000

Boundary Element ‫ﺟدول ﯾﺑﯾن أﺑﻌﺎد‬

fy Mpa = 420 Boundry Element Dimension


NO Lw(mm) d(mm) c C-0.1Lw c/2 Lb(mm) Lb (used)
SW1 3500 2800 1647.1 1297.1 823.5 1297.1 1300
SW2 3500 2800 1647.1 1297.1 823.5 1297.1 1300
SW3 7000 5600 3294.1 2594.1 1647 2594.1 2600
SW4 7000 5600 3294.1 2594.1 1647 2594.1 2600
SW5 3000 2400 1411.8 1111.8 705.9 1111.8 1150
SW6 3000 2400 1411.8 1111.8 705.9 1111.8 1150

5 .
Vu ≤ d. tw Fc ACI 05 , 11.10.3
6

‫ طـــﺎرق ﺑرﻛــــﺎت‬/‫م‬.‫ أﺣﻣــــد اﻟوظـــــﺎف & د‬/ ‫م‬.‫ د‬: ‫إﺷراف‬


10
‫ ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬v

Vu = 830.02KN , Vn =1106.69 KN

tw = 200 mm d = 2800 mm

. .
d. tw Fc = x2800 x 200x 28 x 10 = 2469.38 KN

5 .
→ Vn ≤ d. Fc
6

fc Mpa
= 28 CHECK SHEAR STRENGTH
lw d Vn(KN) 5/6 h*
Vu(KN) tw(mm) Ag(mm^2) Vnd(KN) Remarks
NO (mm) =0.8lw d*FC^0.5

SW1 820.5 3500 2800 200 560000 1094 2469.36789 OK


SW2 814.12 3500 2800 200 560000 1085.49 2469.36789 OK
SW3 2004.4 7000 5600 200 1120000 2672.56 4938.735781 OK
SW4 1967.9 7000 5600 200 1120000 2623.91 4938.735781 OK
SW5 820.97 3000 2400 200 480000 1094.63 2116.601049 OK
SW6 819.94 3000 2400 200 480000 1093.25 2116.601049 OK

Pu = 7045.72 KN

Mu = 7416.441 KN. m

.
e = = = 1.0526 m
.

Ag = Lw . tw = 3500 x200 = 700000 mm2

‫ طـــﺎرق ﺑرﻛــــﺎت‬/‫م‬.‫ أﺣﻣــــد اﻟوظـــــﺎف & د‬/ ‫م‬.‫ د‬: ‫إﺷراف‬


11
‫ ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬v

Pu Limit = 0.1Ag Fc = 0.1 x700000x28x 10 = 1960 KN

→ Pu > Pu Limit

1% < p < 6%

lw − d 3500 − 65
γ= = = 0.98
lw 3500

e/Lw = 1.0526/3.5 = 0.3

Pu 7045.72 ∗ 10
= = 10.065 Mpa = 1.4 Ksi
Ag 700000

γ = 0.9‫ﻣن ﻣﻧﺣﻧﻰ اﻟﺗداﺧل‬

Mu 10
= 7416.441x = 3.027 Mpa = 0.4 Ksi
Ag x lw 700000 x 3500

From Thart we take p = 1%

Ast = p Ag = 0.01 x 3500 x 200 = 7000 mm

Use 26φ 25 mm in both face

‫ طـــﺎرق ﺑرﻛــــﺎت‬/‫م‬.‫ أﺣﻣــــد اﻟوظـــــﺎف & د‬/ ‫م‬.‫ د‬: ‫إﺷراف‬


12
‫‪ v‬ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬

‫إﺷراف ‪ :‬د‪.‬م ‪ /‬أﺣﻣــــد اﻟوظـــــﺎف & د‪.‬م‪ /‬طـــﺎرق ﺑرﻛــــﺎت‬


‫‪13‬‬
‫‪ v‬ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬

‫ﺟدول ﯾﺑﯾن ﻣﺳﺎﺣﺔ ﺣدﯾد اﻟﺗﺳﻠﯾﺢ وﻋدد اﻻﻗطﺎر اﻟﻣﺳﺗﺧدﻣﺔ ﻓﻲ ال ‪Boundry Element‬‬

‫‪fc‬‬
‫‪Mpa‬‬
‫=‬ ‫‪28‬‬ ‫‪REINFORCMENT OF B.E‬‬
‫‪No.of‬‬
‫‪Pu‬‬ ‫‪Mu‬‬ ‫‪Lw‬‬ ‫‪Lb‬‬ ‫‪tb‬‬ ‫‪Pu/Ag‬‬ ‫‪Pu‬‬ ‫‪As‬‬
‫)‪e(mm‬‬ ‫‪e/L‬‬ ‫‪Ag(mm^2) 0.1Agfc‬‬ ‫‪ρ‬‬ ‫‪Bar for‬‬ ‫‪Ф‬‬
‫)‪(KN‬‬ ‫)‪(KN.m‬‬ ‫)‪(mm) (mm) (mm‬‬ ‫‪(Mpa) /(Ag)*e/l‬‬ ‫)‪(mm^2‬‬
‫‪NO‬‬ ‫‪two B.E‬‬
‫‪SW1‬‬ ‫‪5890.7‬‬ ‫‪6755‬‬ ‫‪1146.7‬‬ ‫‪3500‬‬ ‫‪1300‬‬ ‫‪200‬‬ ‫‪0.3‬‬ ‫‪700000‬‬ ‫‪1960‬‬ ‫‪8.42‬‬ ‫‪2.78‬‬ ‫‪0.01‬‬ ‫‪7000‬‬ ‫‪15‬‬ ‫‪25‬‬
‫‪SW2‬‬ ‫‪5929.1‬‬ ‫‪6716‬‬ ‫‪1132.7‬‬ ‫‪3500‬‬ ‫‪1300‬‬ ‫‪200‬‬ ‫‪0.3‬‬ ‫‪700000‬‬ ‫‪1960‬‬ ‫‪8.47‬‬ ‫‪2.71‬‬ ‫‪0.01‬‬ ‫‪7000‬‬ ‫‪15‬‬ ‫‪25‬‬
‫‪SW3‬‬ ‫‪10503‬‬ ‫‪28446‬‬ ‫‪2708.4‬‬ ‫‪7000‬‬ ‫‪2600‬‬ ‫‪200‬‬ ‫‪0.4‬‬ ‫‪1400000‬‬ ‫‪3920‬‬ ‫‪7.5‬‬ ‫‪2.93‬‬ ‫‪0.01‬‬ ‫‪14000‬‬ ‫‪29‬‬ ‫‪25‬‬
‫‪SW4‬‬ ‫‪10512‬‬ ‫‪28004‬‬ ‫‪2664.1‬‬ ‫‪7000‬‬ ‫‪2600‬‬ ‫‪200‬‬ ‫‪0.4‬‬ ‫‪1400000‬‬ ‫‪3920‬‬ ‫‪7.51‬‬ ‫‪2.85‬‬ ‫‪0.01‬‬ ‫‪14000‬‬ ‫‪29‬‬ ‫‪25‬‬
‫‪SW5‬‬ ‫‪7547.7‬‬ ‫‪4894‬‬ ‫‪648.36‬‬ ‫‪3000‬‬ ‫‪1150‬‬ ‫‪200‬‬ ‫‪0.2‬‬ ‫‪600000‬‬ ‫‪1680‬‬ ‫‪12.58‬‬ ‫‪2.77‬‬ ‫‪0.01‬‬ ‫‪6000‬‬ ‫‪13‬‬ ‫‪25‬‬
‫‪SW6‬‬ ‫‪7497.9‬‬ ‫‪4856‬‬ ‫‪647.7‬‬ ‫‪3000‬‬ ‫‪1150‬‬ ‫‪200‬‬ ‫‪0.2‬‬ ‫‪600000‬‬ ‫‪1680‬‬ ‫‪12.5‬‬ ‫‪2.75‬‬ ‫‪0.01‬‬ ‫‪6000‬‬ ‫‪13‬‬ ‫‪25‬‬

‫‪14‬‬
‫إﺷراف ‪ :‬د‪.‬م ‪ /‬أﺣﻣــــد اﻟوظـــــﺎف & د‪.‬م‪ /‬طـــﺎرق ﺑرﻛــــﺎت‬
‫ ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬v

Min area hoops :

short direction (transverse direction )

• S ≤ 6 db → S = 6 x 25 = 150 mm

• S ≤ b/4 or d/4 → S = 200/4 = 50mm

• S = 100 + → S = 100 + = 180 mm

Use Spacing of hoops inside the B. E S = 75 mm


Ah ≥ 0.09 . s. hc. Fc′/Fy

(1300 − 2x40 − 2 x 25 − 2x12)x28


Ah = 0.09 x50 x = 343.8 mm
420

Use φ 12 mm As = 113.1 mm 3 φ 12 mm/m

Long direction (Longitudinal direction )

Av ≥ 0.09 . s. hc. Fc′/Fy

(200 − 2x40 − 2 x 25 − 2x12)x28


Av = 0.09 x50 x = 13.8 mm
420

= .

‫ طـــﺎرق ﺑرﻛــــﺎت‬/‫م‬.‫ أﺣﻣــــد اﻟوظـــــﺎف & د‬/ ‫م‬.‫ د‬: ‫إﺷراف‬


15
‫ ﻣﺷروع اﻟﺗﺧرج ﻓﻲ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬v

: ‫ ﻓﻲ اﻹﺗﺟﺎﻩ اﻟﻌرﺿﻲ واﻻﺗﺟﺎﻩ اﻟطوﯾل‬hoops ‫ﺟدول ﯾوﺿﺢ ﻋدد‬

Transver Rienforcement for Boundary Element


fy Mpa fc Mpa
= 420 = 28
cover
40 φ= 12 25

Lb hc bc S Ash(mm2) Ash(mm2) No.leg No.leg


tb(mm)
NO (mm) (mm) (mm) (mm) long Dir short Dir long short
SW1 1300 200 1146 46 50 343.8 13.8 4 Ф 12 1 Ф 12
SW2 1300 200 1146 46 50 343.8 13.8 4 Ф 12 1 Ф 12
SW3 2600 200 2446 46 50 733.8 13.8 7 Ф 12 1 Ф 12
SW4 2600 200 2446 46 50 733.8 13.8 7 Ф 12 1 Ф 12
SW5 1150 200 996 46 50 298.8 13.8 3 Ф 12 1 Ф 12
SW6 1150 200 996 46 50 298.8 13.8 3 Ф 12 1 Ф 12