You are on page 1of 2
REPUBLIC OF THE PHILIPPINES OFFICE OF THE BUILDING OFFICIAL CITY OF MAKATI APPLICATION NO. PERMIT NO. I LI MECHANICAL PERMIT DATE OF APPLICATION DATE ISSUED 80X 1 (TO BE ACCOMPLISHED BY PROFESSIONAL MECHANICAL ENGINEER IN PRINT) NAME OF OWNERVAPPLICANT LAST NAME, FIRST NAME, MLL TN "ADDRESS 'NO,, STREET, BARANGAY, OITYIMUNIGIPALITY TELEPHONE NO LOCATION OF INSTALLATION NO, STREET, BARANGAY, CITYMUNIGIPALITY SCOPE OF WORK Dapprionor ————CBUILDING PERWITNO. ae TOREYOVAL OR ‘CERTIFICATE OF OCCUPANCY NO. omens (sPeGiev) ee USE OR TYPE OF OCCUPANCY Cy ResoeNTIAL Cy AGAICULTURAL Cl commenciat Cy Lanosoapina Gi inousrriaL OTHERS (SPECIFY) CIINSTITUTIONAL INSTALLATION AND OPERATION OF Deouen i CeNTRAL Aip-CONDITIONING 1D oumewarer i PRESSURE vessets MECHANICAL VENTILATION © puwes CIINTERNAL COMBUSTION ENGINE C) ESCALATOR. COMPRESSED AIR, VACUUM, (REFRIGERATION & ICE-MAKING DD MOVING SIDEWALK INSTITUTIONAL and/or INDUSTRIAL GAS: WINDOW TYPE AIR-CONDITION. (OO FREIGHT ELEVATOR (CO PNEUMATIC TUBES, CONVEYORS PACKAGE AIR-CONDITIONING UN” PASSENGER ELEVATOR andlor MONORAILS (oTHERS (SPECIFY) PROPOSED DATE (OF INSTALLATION. ‘TOTAL INSTALLATION COST (7 [ACTION TAKEN CONDITIONS. EXPECTED DATE (OF COMPLETION PREPARED BY — BOX 2 (TO BE ACCOMPLISHED BY THE BUILDING OFFICIAL) PERMIT IS HEREBY GRANTED TO INSTALL THE MECHANICAL. EQUIPMENT ENUMERATED HEREIN SUBJECT TO THE FOLLOWING www.maka’ Sigurt NOT LaTem THAN SEVEN () DAYS AFTER COMPLETION OF NoTE: ENGR. MARIO V. BADILLO Building Official DATE THIS PERMIT MAY BE CANCELLED OR REVOKED PURSUANT TO SECTION 305 & 306 OF THE “NATIONAL. BUILDING CODE" ORIGINAL-APPLICANTS COPY/PINK-TREASURERS COPY/VELLOW.ASSESSORS'S COPY/ BLUE-BUILDING OFFICIAL'S COPYIGREEN-DPWH COPY, i.gov.ph BOX 3 (TO BE ACCOMPLISHED BY THE RECEIVING AND RECORDING SECTION) BUILDING DOCUMENTS: | (FIVE (9) SETS EACH), | [D_ MECHANICAL PLANS & SPECIFICATIONS. (BILL OF MATERIALS 1 cosT ESTIMATES: TL OTHERS (SPECIFY) [BOX 4 (TO BE ACCOMPLISHED BY THE DIVISION/SECTION CONCERNED) ‘ASSESSED FEE “AMOUNT DUE ‘ASSESSED BY OR. NUMBER DATE PAD MECHANICAL — i I | REVIEWED. ie CHIEF, PROCESSING DIVISEC BOX (TO BE ACCOMPLISHED BY THE DIVISIONSECTION CONCERNED) PROGRESS FLOW re f ” out ‘ACTION/REMARKS | PROCESSED BY ‘CHIEF, PROCESSING DVISIONSECTION | “parE | TIME | DATE | TME | RECEIVING AND RECORDING (TitecHanicat ~ I WE HEREBY AFFIX OUR HANDS SIGNIFYING OUR CONFORMITY TO THE INFORMATION HEREIN ABOVE SETFORTH BOx6 Ate Boxe PROF. MECH. ENGINEER PRC REG. NO. SIGNATURE SIGNED AND SEALED PLANS 8 SPECIFIGATIONS PRINT NAME - APPLICANT ee Res.cert.xo. | DATEISSUED | PLAGE ISSUED PTA. NO. DATEISSUED | PLACETSSUED ‘SIGNATURE TW BOXT PROF. MECH. ENGINEER PRG REG. NO. IN-CHARGE OF INSTALLATION PRINT NAME "ADDRESS PITA. NO. DATE ISSUED PLACE ISSUED SIGNATURE TW

You might also like