You are on page 1of 4
More Create Big Senin Green Data Center Design and Management Best Practices for Critical Facilities Design, Efficiency and Operations ‘vot The Blogger ong, Salone Media Aso SMABS ited (SHA) is oe of te approves CPD Charters ntstin of llong Sanveas. Engineers (CBSE). Our missions 0 prove a marae anvornent ahd opportunites fr engineers a fxcnange professional views and experince on oral inrasrucue and a cantar aries, Sh connate, Fractibes ans Design For detail please isk wate combo View my complete pote Searen ti tog a Comer A aefow Backup Generator Secp Powe Batty BICS|3p Oa Moca MS Bendre 3 in oxny ung Grvace net Buses Conny spa Cait Layo Sea St Dan Cas a eal ld Oya ris Poe Ring Cot Ser COON “Tracey, March 12,2020 Electrical Distribution System in a Data Center aiergse // een ‘There are many diferent loads in the data center, such a IT devices, a condtoners (CRAC. Unis), pur, ighting, tc. The eral supply rom the uly /vansformer/ generator to tio load is enabled by various types of power eauipment We are going filtrate those oquipment thal are crit and without which would not be posse to operate he datacenter Figure 1 sa block ciagram of an electrical datrbution ayer showing the name and the typical locaton of te electrical istrbuon equipment in a data centor andthe power ow path (Uptime Institute Ter Level, N#1 Design) . Ths agra i only an example ofan electrical architecture ‘and atoms to includ al the possible mele types of equipment used an tho typeal lation In data conta. nth real world, a fypical datacenter electrical design has much more complexity and versity than that inthis diagram. Manswictasar "GEN awichgor | ves Lact I \ \ Uptime Institute Tier, WH Design Rowponsiny. 2H managemert course CPC ‘GRAG Critical Facies cia Fates swe Data Center pata center ‘Course data centr couses Data Center Design ows cone Encry Data Centr Enoray Precstoner Data Center Facies Design Oats Center Facies Desi and Data Covtr Operations Del Cert Powe’ De J ist ta Centar Tring Data Centre oa ata Coie Tang ut Coie 101 oa Yona Dt Tee OC Pro OCEP may Design un angina Oa Pou Efficiency elecical Sectical Osi | —— eel Desig fr Mssan Creal Sup Sion eleccal system Etc Sion - , 7 fu eNO EN em Energy Energy ad Cost Saving Era ust ery consump anergy eficine enepy efcnery Energy Manegorant Energy Savrg agrees #56 ‘pea Sate FF ha Fara & tn Forum Eats Cate Fre Sipreason Foe Uptime Insitute Tier Design Ups =UD00 Fa! Shien Conroe tar AC. Earting Paling Swiehoar Gowns Rare = ors ‘ps Gaon Data Cone Snes Gis eee Ssourdag Hs tem Hames ‘are HRCOLO KEE ut Heng Keno Hat Dil ct Spe 3 HVAC IDC IDC nsy IoG ste EEE ni Bsn astctre stsuncon ergo ack Rew OT OT HK Trina Kranay Cad Coming hia Uptime institute Tle IV, 2N+4 Design 7 van Sec! Satehgeat Mainonence vanes ecru munis stene medtne “Tracing the flow of power along its path staring rom the uty to the IT fad) nthe figure t aove, room MEP Meir yes missin ote It shows 8 essential actos are cial or the power supply. This faces citrbute power to te ce ce ben Irae ounsreamloads and ao pee! he power dbo system nh da center: Stone MVBC N Ne} ata acre Mito Ot Cart NOC OSCIO O- + Medium-voltage switchgear Storage One UPS One Bk One Rost i vefotenee nek Onetla Netw peter Opes NVILY transfor para ey pnt peg eet + Low-voltage switchgear / switchboard automatic transfer switch (ATS) POU er Raven "ete Coutirg Pie PLC + UPS system with inpuvoutput switchboard and UPS distribution switchboard neers + Power distibution Units (POUS) and remote power panels (RPP) reumeton Power Design Poe Dat Por Diion Unt pat ttn nt + Busway Pawar Facer oe Srangesporr soe + Panelbosrd ower ‘ipo Power Sper Pon ie + Rack PDUs (rPDUs) / outlet strips Power UsepeEfectnenae ir Pome Ra “ pjtrometic chat PUE oor Sytem Rates ous CDC Dasributon Designer Registered Contractor Reslnce Resin Ste Tou Sire SLA SMA Strategic Media Asia al Vi lecommuncatone TA Tier Ir Tr 1 Ti Nea Tor Levels THO sl ost Power Supply UPS Blog Archive > 20286) > 202218) > 2021 @ ¥ 20206) os a way) ar (1) uae (1) nua (1) > 201006) > nen > 201710) > 2018116) > 201516) > 201% > 201328) > 201200) > 201110) Broa . Deonmens ia oT (my) , i? ioe Reet Pou [A factios above, except for rack PDUS (POU), are consisored to be assembles containing Cereal areskes, switches, varus iypes of rlays, buses and connections, and contra and auxilary devices. Each device's optimized for long fe and ease of maintenance ‘The EC 61947 & EC 62271, which species the HV and LV switchgear terminology, considers ‘swchboard to be the same as swchgear. For some regions Ie, Noth American, switchgear and ‘siichboard are specie aferenty by ANSI ang UL standards ‘SMA combines with professional Chartered Engineers (CEng) fom the Insitute of Engineering Technology (ET), the Chartered insite of Bling Services Enginesrs (CIBSE) andthe Hong Kong Instuton of Enginoors(HKIE}. Our engineers have more than 20 years experiance in data center design & ule, busing services engineering and energy conservation inthe pivate and ble sectors “The toam propares the angincers and IT parsonnel to face any challenges in data conters and rial facies of any size, in any location. Fr ether design considerations topes in data center nd etica nastuctre, please vist (1)Site Sotecton, (2) Space Planning, (@)Coatng, (@ Redundancy, (8)Fre Suppression, (6)Meot Me Rooms, (7)UPS Selection, (@) Raised Floor, (2) Code & Standares, (10) Transformers ane Harmonic Distortion, (1) Mati.ode UPS Systems, (12) Electrical Rooms, (13) Generator Systems, (14) Generator Fuel Sysoms, (15) Battery Systoms, (18) Eanhing Grounding and Bonding, ete No comments: Post a Comment Nate: nt a mambo his blog may pot comment To leave a comment, click the button below to sign in with Google SIGN IN WITH Goo ‘Seveerb to: Post Comments (lon) ‘Single ame, Theme mages by oa. Pameradby Blogoe, olser Post

You might also like