Professional Documents
Culture Documents
SCHEDULE : RADIOLOGY
QUANTITY : 1 system
Term Definition
1 Server This term is used as a singular, but is defined to encompass the
following:
- single or multiple physical servers
- single or multiple virtual servers
- various server components such as database server, storage
server, integration server, SAN, NAS, etc.
2 Client workstation Includes “Dedicated client workstation” and “Shared Client Workstation”
3 Dedicated client A computer which primary use is to access PACS
workstation
4 Shared client A pre-existing facility computer which primary use is to access other
workstation systems, but has software (and possibly new hardware) installed to
access PACS
5 Modality Radiology modalities such as computed radiography (CR), digital
radiography (DX), ultrasonography (US), computed tomography (CT),
magnetic resonance imaging (MRI), among others
6 Non-client workstations A DICOM workstation used for advanced image processing
7 Integration Refers to DICOM integration, where the application entity (AE) title,
internet protocol (IP) address and port numbers are configured between
2 DICOM nodes (such as modality-PACS, modality-printer, PACS-non-
client workstation, etc).
Page 1 of 6
BPKK 30 SEP 2020
Vendor.
1.2 The system shall have the following performance
parameters:
1.2.1 Time taken to fully transfer 1 CR image of 5
megapixels from a modality to the server shall be less
than 10 seconds (achievable 95% of the time).
1.2.2 Time taken to fully transfer 1 US study of 10 images
from a modality to the server shall be less than 10
seconds (achievable 95% of the time).
1.2.3 Time taken to load the first image of a study in a client
workstation shall be less than 5 seconds (achievable
95% of the time).
1.2.4 The vendor shall commit to maintaining a 99.9%
uptime (excluding planned downtime).
1.2.5 All images shall be stored in at least 2 separate data
storage units (mirrored), so that failure of 1 data
storage unit will not result in loss of function (Refer
2.2.5)
1.2.6 The vendor shall commit in writing that recovery of data
and reinstallation of the failed data storage unit shall
take less than 21 days (Refer 2.2.5)
1.3 Storage
1.3.1 Server storage shall be sized to accommodate all the 1unit for each
radiology images generated by the facility for a total of health clinic
7 years, based on historical output and projected
growth (default value of 10% per annum). The vendor
shall study the number of images in the facility and
advised accordingly, subject to agreement by the
Government. At least 8 TB.
1.4 The client workstation viewer software shall have the
following functions:
1.4.1 User authentication with password, and auto-log off
after a user-defined period of inactivity
1.4.2 Search for images at the patient level (patient name,
patient ID, patient sex and patient age) and study level
(study date, study time, study description, modality,
accession number and operator)
1.4.3 Support patient-centric storage and study list
presentation at patient, study, series and image levels
1.4.4 User-defined hanging protocols, with auto-retrieving &
auto-loading of priors
1.4.5 Basic image manipulation tools (zoom, pan,
windowing, magnifier glass, rotation, flip)
1.4.6 Basic measurement tools (linear distance, angle, pixel
value, ROI value).
ROI shapes shall include elliptical and polygonal
1.4.7 Basic image management (save as DICOM, save as
anonymized DICOM, save as JPEG, send to modality
or non-client workstation, export to CD/DVD/local file)
1.5 Licenses should be provided for the lifetime of the
Page 2 of 6
BPKK 30 SEP 2020
Page 3 of 6
BPKK 30 SEP 2020
Page 4 of 6
BPKK 30 SEP 2020
Page 5 of 6
BPKK 30 SEP 2020
4.2 Licenses
4.2.1 Vendor shall provide the full details of any third-party
software licenses to the Government, as to allow
reinstallation of third-party software
5 Delivery
5.1 The vendor shall specify the total duration required to
commence, complete, test and commission the System
from the date of receipt of Notification of Award
- Supplier to provide technical and operation
manuals
- Relevant on-site training is required for all users
and key operator / administrator
- System must include 24-months warranty
period to cover all parts and labour
6 Training
6.1 Relevant on-site training for 7 days is required for all
users and key operator
7 Service Support
7.1 Technical expertise available for the maintenance and
repair of the particular model of equipment offered
must be available
7.2 Vendor to provide list of qualified and factory trained
engineers with names, qualification and years of
relevant experience
8 System Warranty
8.1 All system software and hardware supplied shall be
guaranteed for a minimum period of twenty four (24)
calendar months from the date of testing and
acceptance, to cover all supplied components and
parts, inclusive of labour, and maintenance services.
Supplier to propose the recommended maintenance
and costing for after the warranty period
8.2 Two (2) Preventive Maintenance Servicing per year to
be provided by supplier during warranty period.
Supplier should also attend to all emergency due to
manufacturing defects
8.3 Extended Planned Preventive Maintenance: Two (2)
Comprehensive Service Controls Planned Preventive
Maintenance per year during the 3 years after the
warranty period
9 Catalogue and Reference Books
9.1 Supplier must provide necessary product data and
catalogue with detail information on model offered
Page 6 of 6