B. LABOR
QTY Description Rate per day # of working days Estimated cost
2 Skilled _________ 10 _____________
6 Laborer __________ 10 _____________
LABOR COST ____________
DIRECT COST -
PROFIT ( 10 %) -
O.C.M. ( 15 % ) -
VAT ((D.C+P+OCM)*5%) -
TOTAL DIRECT COST -
UNIT COST -
B. LABOR
QTY Description Rate per day # of working days Estimated cost
1 Foreman -
2 Laborer -
LABOR COST -
C. EQUIPMENT
QTY Description Rate per day # of working days Estimated cost
1 Road Grader w/ Scarifier -
1 Road Roller 2MT -
EQUIPMENT COST -
DIRECT COST -
PROFIT ( 10 %) -
O.C.M. ( 15 % ) -
VAT ((D.C+P+OCM)*5%) -
TOTAL DIRECT COST -
UNIT COST -
ITEM IV. PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)(CLASS A): V= 38.00 cu.m
L= 38 W= 5 T= 0.2
A. MATERIALS
QTY Unit Description Unit Cost Estimated cost
342 Bags Portland Cement -
29 Cu.m. Coarse Concrete Aggregates (washed Stone -
1"Ø ave size)
21 Cu.m. Fine Concrete Aggregates (size for making
CHB) -
8 Pcs. 16mmǾ RSB, std. -
6 Kgs. Assorted CW Nail -
2 Pcs. Flat Bar 1/4x3"x20' -
2 GAL Asphalt Sealant -
18 Pcs. 2"x8"x12' Form Lumber -
MATERIAL COST -
B. LABOR
QTY Description Rate per day # of working days Estimated cost
1 Foreman -
4 Skilled -
10 Laborers -
LABOR COST -
C. EQUIPMENT
QTY Description Rate per day # of working days Estimated cost
1 One Bagger Mixer -
EQUIPMENT COST -
DIRECT COST -
PROFIT ( 10 %) -
O.C.M. ( 15 % ) -
VAT ((D.C+P+OCM)*5%) -
TOTAL DIRECT COST -
UNIT COST -
B. LABOR
QTY Description Rate per day # of working days Estimated cost
1 Welder -
1 Skilled -
2 Laborer -
LABOR COST -
DIRECT COST -
PROFIT ( 10 %) -
O.C.M. ( 15 % ) -
VAT ((D.C+P+OCM)*5%) -
TOTAL DIRECT COST -
UNIT COST -
B. LABOR
QTY Description Rate per day # of working days Estimated cost
1 Foreman -
2 Laborer -
LABOR COST -
DIRECT COST -
PROFIT ( 10 %) -
O.C.M. ( 15 % ) -
VAT ((D.C+P+OCM)*5%) -
TOTAL DIRECT COST -
UNIT COST -
-SUMMARY-
ITEM I CONCRETE WORKS _______________
ITEM II MASONRY WORKS -
ITEM IIISUB GRADE PREPARATION -
ITEM IV PCCP CLASS "A" -
ITEM V SIDE LINER -
ITEM VI PLUMBING WORKS -
TOTAL PROJECT COST