5 4 3 2 1 Owner:

Q R S T U V
06-3003-03
W
X
‫ﺷﻣول‬
06-3002-03 06-3002-03 06-3002-03 06-3002-03 06-3003-03

Shomoul
06-3003-03 06-3003-03

06-3003-03 SHOMOUL HOLDING COMPANY W.L.L.

JJ Project Management:

TRUSS "17" TRUSS "17"


TRUSS "17" AECOM Arabia Ltd
06-3001-03 06-3001-03
Riyadh-King Fahad Road
58729 Riyadh, 11414 Saudi Arabia

PI
3 x8 PE
8. 16 Prime Consultant:
16 8.
3x
PE 8
PI Al Zaid Engineering
‫ اﻟﺰﯾﺪ‬Consultants (ZEC)

E
AL - ZAID

HEA 180

HEA 240
HEB 240

HEB 240

HEA 180

HEA 240
9250

C
Z
ENGINEERING P.O. Box 20179 Riyadh 11455, KSA
CONSULTANTS ‫ﻟﻺﺳﺗﺷﺎرات اﻟﮭﻧدﺳﯾﺔ‬
Riyadh, KSA
Lead Consultant:
D D SHAREKAT ALMOHANEDSOON
ALISTESHAREYOON WE SHARIKOH
LEISTESHARAT ALHANDASEYA
3 x8 PI C O N S U L T I N G E N G I N E E R S Euro Marché center
8. PE King Abdulla road & Osman Ibn Afan road junction
16 16
1 / SHO001-NAP-IFC-M2-05-XX-DR-SS-1002-04 Riyadh, Saudi arabia
PE 8.
3x
PI 8
Construction Supervision:

KK TRUSS "18" TRUSS "18" TRUSS "18"

06-3001-03 06-3001-03

PI
Main Contractor:

PE
3x
8.
Nesma & Partners
‫ﻧﺳﻣﺎ‬

16
Nesma

16

8.
PE
Contracting Co. Ltd

3x
PI

8
& Partners ‫وﺷرﻛﺎھم‬ PO Box 1498 Al Khobar, 31952

HEA 180
Saudi Arabia

HEB 240

HEB 240

HEA 180

HEA 240
HEA 240
9250
Contractor Consultant:

Dar al Handasah (Shair


& Partners)
King Fahd Rd., Olaya, Al-
Mass Centre
P.O. Box: 612, Riyadh 11421

x8

PI
7
9.

PE
13

13
PE

9.
PI
TRUSS "19"

7x
8
Notes/Legends:

LL TRUSS "19" TRUSS "19"


1- FOR STRUCTURAL STEEL GENERAL NOTES, REFER TO DRAWING NO:
SHO001-NAP-IFC-XX-XX-XX-DR-SS-0001-00-00

PI
06-3001-03 06-3001-03

PE
2- ALL BUILT-UP & HOT ROLLED SECTIONS ARE TO BE ASTM A572 GR.50

13
WITH A MINIMUM YIELD STRESS OF 345 N/mm2.
x8

9.
PI

7x
.3

PE
8

8
16 3- FOR SECTIONS, REFER TO DRAWINGS NO: SHO001-NAP-IFC-M2-06-RCM-

16
PE

8.
DR-SS-3001-03 TO SS-3003-03.

PI
PI

PI
3x

8
8
7x

PI
PE

7x

PE

x8
7x
8

9.

PE

9.

7
9.
13
13
4- FOR BASE PLATE DETAILS, REFER TO DRAWING NO:SHO001-NAP-IFC-

13

9.
13
13

13
9.

13
9.
PE

PE
M2-06-RCM-DR-SS-5002-03.

7x

PE

9.

7x

PE
PI

7x
8

PI

8
PI

PI
8
5- SECONDARY STEEL NOT SHOWN ON THE STRUCTURAL DRAWINGS ARE
PIPE 168.3x8

HEB 240

HEA 240
HEB 240

HEA 180
PART OF THE SKIN AND SHALL BE DESIGNED AND MANUFACTURED BY THE
9250

B4

B4
CONTRACTOR, FOR THE ENGINEER'S REVIEW AND APPROVAL.

PI
PE

PI
8

7x
6- APPLY A CORROSION PROTECTION SYSTEM TO GIVE A LIFE BEFORE

7x

PE

x8
13

9.
9.

7
13
FIRST MAJOR MAINTENANCE OF 20 YEARS UNDER PREVAILING WEATHER

9.

13

9.
13
PI

7x

13
PE

9.
PI CONDITIONS.REFER TO SPEC SECTION 099600 CORROSION-RESISTANT

PE

PE

7x
8
PE

PE
PI
3x
PAINTING SYSTEM TO STRUCTURAL STEEL

13

PI

PI
8.
16

9.
16

7x
8 .3

8
PE
x 7- FOR ULTIMATE STRAINING ACTIONS/END FORCES OF THE STEEL

8
8

7x
PI
MEMBERS, REFER TO DRAWINGS NO: SHO001-NAP-IFC-M2-06-RCM-DR-

9.
13
C C SS-5001-03. THE CONTRACTOR TO USE THESE STRAINING ACTIONS IN

PI
PE
PE
ORDER TO DESIGN THE STEEL CONNECTIONS.

PI

13
9.
7x
8- STEEL WORK CONNECTION DESIGN IS TO BE DONE BY A SPECIALIST

8
STEEL CONTRACTOR AND TO BE SUBMITTED FOR ENGINEER'S APPROVAL.
MM TRUSS "20" TRUSS "20" 9- FOR FIRE RATING REQUIREMENTS REFER TO SPEC SECTION 078100
TRUSS "20" "APPLIED FIRE PROOFING" TO UNEXPOSED APPLICATIONS AND TO
06-3001-03 06-3001-03 SECTION 099646 "INTUMESCENT PAINTING" FOR EXPOSED APPLICATIONS

10- LEVELS AND DIMENSIONS ARE TO BE CONFIRMED BY THE


CONTRACTOR PRIOR TO ANY FABRICATION. FURTHERMORE, CONCRETE
SUPPORT LEVELS SHOULD BE COORDINATED WITH RELEVANT CONCRETE
DRAWINGS.

11- THIS DRAWING TO BE READ IN CONJUCTION WITH DRAWINGS


CONTAINING BEAM SCHEDULE NO: SHO001-NAP-IFC-M2-06-RCM-DR-
SS-3001-03 TO SS-3003-03.
9250

12- FOR MAIN TRUSSES CAMBERING SCHEME REFER TO DRAWING NO:


SHO001-NAP-IFC-M2-06-RCM-DR-SS-3003-03.

BEAM SCHEDULE

B1 2FLGS 160x8.5 - WEB 116x5.5

B2 2FLGS 180x8.5 - WEB 116x5.5 Contractor ( Nesma & Partners):


NN 5 5
B3 2FLGS 180x9 - WEB 134x6 CHECKED BY:
150 B4 2FLGS 220x9.5 - WEB 152x6 APPROVED BY:
06-3002-03 06-3002-03
4625 4625 4514 4514 4561 4561 4583 4583 284
B5 2FLGS 240x9.5 - WEB 152x6

B6 2FLGS 280x9.5 - WEB 152x6 RFI REF:


W
Q R S T U V X B7 2FLGS 200x12 - WEB 206x7.5
06-3003-03
06-3002-03 06-3002-03 06-3002-03 06-3002-03 06-3003-03 06-3003-03 06-3003-03
B8 2FLGS 280x12 - WEB 206x7.5 General Key Plan:
Y NORTH
06-3003-03
B9 2FLGS 300x12.5 - WEB 225x7.5
MECCA
B10 2FLGS 200x9 - WEB 134x6

B11 2FLGS 320x12.5 - WEB 225x7.5

B12 2FLGS 240x13 - WEB 244x8


9250 9250 9250 9250
B13 2FLGS 320x13 - WEB 244x8
MALL

B14 2FLGS 300x13 - WEB 244x8

B15 2FLGS 340x13 - WEB 244x8

B16 2FLGS 340x16 - WEB 238x10


3 4 5 6 7
B17 2FLGS 340x14- WEB 262x8.5

B B18 2FLGS 240x14 - WEB 262x8.5 B Project Name:


B19 2FLGS 300x12 - WEB 206x7.5

B20 2FLGS 140x9.5 - WEB 152x6 THE AVENUES MALL,


B21 2FLGS 300x9.5 - WEB 152x6
RIYADH
B22 2FLGS 220x10 - WEB 170x6.5

Project Number SHO001

PARTIAL PLAN AT BOTTOM CHORDS 1OF4


SCALE 1/100 ISSUED FOR CONSTRUCTION

June 2023

01 14-06-2023 ONLY FOR UPLOADING ON G.M.


ACONEX
00 05-05-2023 APPROVED ISSUE G.M.
EI#19-EI#12
Rev Date Description Appr

Issue:

FILE NAME : SHO001-NAP-IFC-M2-06-RCM-DR-SS-1002-03-01

MODEL NAME : SHO001-NAP-IFC-XX-XX-ZZ-M3D-SS-0002-00-00


SCALE: 1 : 100

SHEET FORMAT: A0

DRAWN BY: H.A.

DESIGN BY: H.J.

CHECKED BY: I.G.

A A APPROVED BY: G.M.

Sheet Title

PLOT 06
CINEMA ROOF
PLAN AT BOTTOM CHORD
1 OF 4 - PARTIAL PLAN

Sheet No.
Design Plot /
Project Originator Module Level Type Discipline Number Partial No. REV
Phase Zone

SHO001 NAP IFC M2 06 RCMDR SS 1002 03 01

5 4 3 2 1