Professional Documents
Culture Documents
Sho001 Nap Ifc M2 06 RCM DR SS 1002 03 0a
Sho001 Nap Ifc M2 06 RCM DR SS 1002 03 0a
Q R S T U V
06-3003-03
W
X
ﺷﻣول
06-3002-03 06-3002-03 06-3002-03 06-3002-03 06-3003-03
Shomoul
06-3003-03 06-3003-03
JJ Project Management:
PI
3 x8 PE
8. 16 Prime Consultant:
16 8.
3x
PE 8
PI Al Zaid Engineering
اﻟﺰﯾﺪConsultants (ZEC)
E
AL - ZAID
HEA 180
HEA 240
HEB 240
HEB 240
HEA 180
HEA 240
9250
C
Z
ENGINEERING P.O. Box 20179 Riyadh 11455, KSA
CONSULTANTS ﻟﻺﺳﺗﺷﺎرات اﻟﮭﻧدﺳﯾﺔ
Riyadh, KSA
Lead Consultant:
D D SHAREKAT ALMOHANEDSOON
ALISTESHAREYOON WE SHARIKOH
LEISTESHARAT ALHANDASEYA
3 x8 PI C O N S U L T I N G E N G I N E E R S Euro Marché center
8. PE King Abdulla road & Osman Ibn Afan road junction
16 16
1 / SHO001-NAP-IFC-M2-05-XX-DR-SS-1002-04 Riyadh, Saudi arabia
PE 8.
3x
PI 8
Construction Supervision:
06-3001-03 06-3001-03
PI
Main Contractor:
PE
3x
8.
Nesma & Partners
ﻧﺳﻣﺎ
16
Nesma
16
8.
PE
Contracting Co. Ltd
3x
PI
8
& Partners وﺷرﻛﺎھم PO Box 1498 Al Khobar, 31952
HEA 180
Saudi Arabia
HEB 240
HEB 240
HEA 180
HEA 240
HEA 240
9250
Contractor Consultant:
x8
PI
7
9.
PE
13
13
PE
9.
PI
TRUSS "19"
7x
8
Notes/Legends:
PI
06-3001-03 06-3001-03
PE
2- ALL BUILT-UP & HOT ROLLED SECTIONS ARE TO BE ASTM A572 GR.50
13
WITH A MINIMUM YIELD STRESS OF 345 N/mm2.
x8
9.
PI
7x
.3
PE
8
8
16 3- FOR SECTIONS, REFER TO DRAWINGS NO: SHO001-NAP-IFC-M2-06-RCM-
16
PE
8.
DR-SS-3001-03 TO SS-3003-03.
PI
PI
PI
3x
8
8
7x
PI
PE
7x
PE
x8
7x
8
9.
PE
9.
7
9.
13
13
4- FOR BASE PLATE DETAILS, REFER TO DRAWING NO:SHO001-NAP-IFC-
13
9.
13
13
13
9.
13
9.
PE
PE
M2-06-RCM-DR-SS-5002-03.
7x
PE
9.
7x
PE
PI
7x
8
PI
8
PI
PI
8
5- SECONDARY STEEL NOT SHOWN ON THE STRUCTURAL DRAWINGS ARE
PIPE 168.3x8
HEB 240
HEA 240
HEB 240
HEA 180
PART OF THE SKIN AND SHALL BE DESIGNED AND MANUFACTURED BY THE
9250
B4
B4
CONTRACTOR, FOR THE ENGINEER'S REVIEW AND APPROVAL.
PI
PE
PI
8
7x
6- APPLY A CORROSION PROTECTION SYSTEM TO GIVE A LIFE BEFORE
7x
PE
x8
13
9.
9.
7
13
FIRST MAJOR MAINTENANCE OF 20 YEARS UNDER PREVAILING WEATHER
9.
13
9.
13
PI
7x
13
PE
9.
PI CONDITIONS.REFER TO SPEC SECTION 099600 CORROSION-RESISTANT
PE
PE
7x
8
PE
PE
PI
3x
PAINTING SYSTEM TO STRUCTURAL STEEL
13
PI
PI
8.
16
9.
16
7x
8 .3
8
PE
x 7- FOR ULTIMATE STRAINING ACTIONS/END FORCES OF THE STEEL
8
8
7x
PI
MEMBERS, REFER TO DRAWINGS NO: SHO001-NAP-IFC-M2-06-RCM-DR-
9.
13
C C SS-5001-03. THE CONTRACTOR TO USE THESE STRAINING ACTIONS IN
PI
PE
PE
ORDER TO DESIGN THE STEEL CONNECTIONS.
PI
13
9.
7x
8- STEEL WORK CONNECTION DESIGN IS TO BE DONE BY A SPECIALIST
8
STEEL CONTRACTOR AND TO BE SUBMITTED FOR ENGINEER'S APPROVAL.
MM TRUSS "20" TRUSS "20" 9- FOR FIRE RATING REQUIREMENTS REFER TO SPEC SECTION 078100
TRUSS "20" "APPLIED FIRE PROOFING" TO UNEXPOSED APPLICATIONS AND TO
06-3001-03 06-3001-03 SECTION 099646 "INTUMESCENT PAINTING" FOR EXPOSED APPLICATIONS
BEAM SCHEDULE
June 2023
Issue:
SHEET FORMAT: A0
Sheet Title
PLOT 06
CINEMA ROOF
PLAN AT BOTTOM CHORD
1 OF 4 - PARTIAL PLAN
Sheet No.
Design Plot /
Project Originator Module Level Type Discipline Number Partial No. REV
Phase Zone
5 4 3 2 1