Analysis Model and Connections Design

Review.
Job Order Project Topic Rev.

MOC Warehouse Model and


2023-081 Connections 00
(SAL)
Approval.

I. Table of Contents
1. Introduction………………………………………………….3

2. SAP MODEL REVIEW……………………………………..4

3. CONNECTIONS DESIGN COMMENTS…………………5

4. SHOP DRAWINGS COMMENTS…………………………8


Job Order Project Topic Rev.

MOC Warehouse Model and


2023-081 Connections 00
(SAL)
Approval.

1. Introduction

This report is prepared to present our technical review for the SAP model and the connections
design received from H.F.P. (Horizon Fourth Pyramid) regarding the ministry of culture
warehouse in Riyadh. The contractor made some changes to the SAP2000 model which
obligates us to recheck the model and verify the safety, stability and adequacy of the new
model. Also, the connections design as well as the shop drawings shall be reviewed in details.
In the following sections, the review shall be presented.

MOC Warehouse
Job Order Project Topic Rev.

MOC Warehouse Model and


2023-081 Connections 00
(SAL)
Approval.

2. SAP MODEL REVIEW

In this section of the report, the model issues shall be shown. After reviewing the model, the following
changes were sighted and were refused for the following reasons:

A) The secondary beams on the edge of the mezzanine cantilevers are UNSAFE in terms of
deflection. Thus, the secondary beams to be changed back to moment connections. The edge
IPE300 shall also be reverted back to IPE270 as per the initial model. The contractor to clarify
why he did such a change?

The Allowable deflection = 7899/360 = 21.9mm < 23.1mm UNSAFE


Job Order Project Topic Rev.

MOC Warehouse Model and


2023-081 Connections 00
(SAL)
Approval.

B) The Beams of the elevator shaft shall be reverted back to moment connections. using shear
connections will induce a leaning effect between the elevator shaft and the main mezzanine
roof which is not preferred in terms of structural vibrations. However, The contractor to clarify
why did he make such a change.

Many other changes were reviewed and proved to be OK with us.

3. CONNECTIONS DESIGN COMMENTS

The connections design is received from the contractor as PDF reports and soft copy for the
IDEASTATICA. However, the following issues were sighted.

A) The model needs to be rectified satisfying the requirements presented in the above section.
Then the internal forces to be rechecked by the contractor to cover any impacts on the
straining actions.

B) Buckling check was not run. We need the buckling check to be activated to ensure the stability
of the connections plates as well as the local buckling for the member elements.
Job Order Project Topic Rev.

MOC Warehouse Model and


2023-081 Connections 00
(SAL)
Approval.

C) Some connections show obvious clashes. That proves low quality of the submittal. Kindly do
not provide clashing connections details.
Job Order Project Topic Rev.

MOC Warehouse Model and


2023-081 Connections 00
(SAL)
Approval.

D) Use Minimum two bolts in any beam connection. This to satisfy the requirements of chapter F
of the AISC360-16.

E) Kindly use either Maximum-Maximum forces concept of the Maximum-Corresponding force


concept.

F) All the bracing connections are missing in the design calculations.

G) Portal columns with the main columns connection design is missing.

H) Clear Key Plan shall be provided to link between the design calculations and the submitted
shop drawings.

We are expecting a well-coordinated, complete and clash free package in the next submittal.
Job Order Project Topic Rev.

MOC Warehouse Model and


2023-081 Connections 00
(SAL)
Approval.

4. SHOP DRAWINGS COMMENTS

The shop drawings were thoroughly reviewed and the comments shall be summarized on the
drawings as follows.
GENERAL NOTES:

SUBMITTAL
REV . DATE BY . DESCRIPTION CHKD . APPD .

COORDINATION
PREPARED BY ENGINEERING DEPT . DRAWN BY :

CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM

SIGNATURE :

POSITION NAME SIGNATURE

DEPARTMENT HEAD ENG.AHMED ELSHERBINY

TECHNICAL MANAGER ENG.AHMED HAMDY OMAR

PROJECT MANAGER ENG.MAHMOUD HANAFY

KEY PLAN

MOC Warehouse Project (SAL)


RIYADH, KINGDOM OF SAUDI ARABIA

REFERENCES
CONTRACT DRAWING

3d SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1
GENERAL NOTES:

GENERAL COMMENTS:

1- PROVIDE STEEL HOT ROLLED MEMBERS GRADE.


2- PROVIDE STEEL PAINTING AND FIRE PROOF CONDITION.
3- PROVIDE STEEL PLATES GRADES.
4- PROVIDE BOLTS GRADES.
5- PROVIDE PRETENSIONED BOLTS.
6- BOLTS USED IN THE ELEVATOR SHAFTS SHALL BE SLIP CRITICAL.
7- PROVIDE CAP PLATES ABOVE THE COLUMNS.
8- PROVIDE DETAILS FOR THE METAL DECKING.
9- MISSING CONNECTIONS DETAILS. NAME THE DETAILS WITH THE SAME NAME IN THE DESIGN CALCULATIONS.
10- PROVIDE PLATES DIMENSIONS AND HOLES PITCH.
11- PROVIDE WELD SIZES AND WELDING TYPE.
12- PROVIDE WELD ELECTRODE GRADE.
13- EXTENSION ABOVE THE SECONDARY STEEL BEAMS SHALL BE WITHIN CONCRETE DECK THICKNESS.
14- PROVIDE DIMENSIONS ON PLAN AS THERE ARE NO DIMENSIONS TO BE REVIEWED.
15- PROVIDE GENERAL NOTES FOR THE STEEL FABRICATION AND ERECTION SHOWING THE PLATES NAME LEGEND FOR
REFERENCE.
1 2 3 4 5 6 7 8

34076.5
7347 7899 5128 5217 5755.5 2084.5 645.5
+10.00
5500

CLARIFY
THE SUBMITTAL

6 M 20 2 M 16
HATCH? REV . DATE BY . DESCRIPTION CHKD . APPD .

2 M 16 2 M 16
2 M 16 6 M 20 14 M 20 2 M 16 14 M 20 2 M 16 14 M 20 2 M 16 14 M 20
6 M 20
8 M 24 2 M 16 2 M 16 6 M 20 2 M 16 8 M 24 2 M 16 2 M 16 6 M 20 6 M 20 8 M 20 6 M 20 2 M 16 2 M 16 6 M 20 6 M 20 6 M 20 6 M 20 6 M 20 8 M 24

+4.50
11500

COORDINATION
PREPARED BY ENGINEERING DEPT . DRAWN BY :
2 M 16 PL13*170 L= 2871
6 M 20 6 M 20 2 M 16 6 M 20 6 M 20 2 M 16 2 M 16 6 M 20 2 M 16 CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM
2 M 16
IPE360 L= 2524 6 M 20 PL13*170 L= 2672 6 M 20 PL13*170 L= 1784 PL13*170 L= 2871 SIGNATURE :

PL13*170 L= 2672 6 M 20 POSITION NAME SIGNATURE

3 M 16 3 M 16 3 M 16 3 M 16 PL13*170 L= 1784 DEPARTMENT HEAD ENG.AHMED ELSHERBINY


PL8*345 L= 1750
4500

IPE360 L= 2524 TECHNICAL MANAGER ENG.AHMED HAMDY OMAR

PL13*170 L= 1784 PROJECT MANAGER ENG.MAHMOUD HANAFY

KEY PLAN
HEA240

HEA240

HEA240

HEA240

HEA360

HEA360
D20 D20 D20 D20 D20 D20
D20 D20 D20 D20 D20
0.00
150

-0.15 MOC Warehouse Project (SAL)


D20 D20 D20
D20 D20 D20 D20 D20 D20 D20 D20
1350

RIYADH, KINGDOM OF SAUDI ARABIA


550*550

550*550

550*550

550*550

550*550

550*550
-1.50

Grid A

REFERENCES
CONTRACT DRAWING

SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1
GENERAL NOTES:

GENERAL COMMENTS:

1- PROVIDE STEEL HOT ROLLED MEMBERS GRADE.


2- PROVIDE STEEL PAINTING AND FIRE PROOF CONDITION.
3- PROVIDE STEEL PLATES GRADES.
4- PROVIDE BOLTS GRADES.
5- PROVIDE PRETENSIONED BOLTS.
6- BOLTS USED IN THE ELEVATOR SHAFTS SHALL BE SLIP CRITICAL.
7- PROVIDE CAP PLATES ABOVE THE COLUMNS.
8- PROVIDE DETAILS FOR THE METAL DECKING.
9- MISSING CONNECTIONS DETAILS. NAME THE DETAILS WITH THE SAME NAME IN THE DESIGN CALCULATIONS.
10- PROVIDE PLATES DIMENSIONS AND HOLES PITCH.
11- PROVIDE WELD SIZES AND WELDING TYPE.
12- PROVIDE WELD ELECTRODE GRADE.
13- EXTENSION ABOVE THE SECONDARY STEEL BEAMS SHALL BE WITHIN CONCRETE DECK THICKNESS.
14- PROVIDE DIMENSIONS ON PLAN AS THERE ARE NO DIMENSIONS TO BE REVIEWED.
15- PROVIDE GENERAL NOTES FOR THE STEEL FABRICATION AND ERECTION SHOWING THE PLATES NAME LEGEND FOR
1 2 3
REFERENCE. 4 5 6 7 8

34076.5
7347 7899 5128 5217 5755.5 2084.5 645.5
+10.00
5500

6 M 20 SUBMITTAL
6 M 20
14 M 20 6 M 20 14 M 20 6 M 20
REV . DATE BY . DESCRIPTION CHKD . APPD .

14 M 20
6 M 20 6 M 20 6 M 20 6 M 20 6 M 20
6 M 20 6 M 20 6 M 20 6 M 20 6 M 20 6 M 20 6 M 20 6 M 20
14 M 20 6 M 20 6 M 20 6 M 20 6 M 20 6 M 20 6 M 20 4 M 20 8 M 24
6 M 20 6 M 20
IPE400 IPE400 IPE360 IPE360 IPE400
+4.50
11500

COORDINATION
6 M 20 6 M 20 6 M 20 6 M 20
6 M 20 6 M 20 6 M 20 6 M 20 6 M 20
6 M 20
6 M 20 6 M 20
6 M 20
6 M 20 6 M 20 6 M 20 6 M 20 6 M 20
PREPARED BY ENGINEERING DEPT . DRAWN BY :
PL14*180 L= 2524 PL14*180 L= 2672 PL13*170 L= 1784 PL13*170 L= 1784 PL14*180 L= 2524 PL14*180 L= 2524
CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM

IPE300 IPE300 IPE300 IPE300 IPE300


PL14*180 L= 2524 PL14*180 L= 2672 SIGNATURE :
4500

6 M 20 POSITION NAME SIGNATURE


PL13*170 L= 1784 DEPARTMENT HEAD ENG.AHMED ELSHERBINY

TECHNICAL MANAGER ENG.AHMED HAMDY OMAR


HEA240

HEA240

HEA240

HEA240

HEA360

HEA360
PROJECT MANAGER ENG.MAHMOUD HANAFY

PROVIDE KEY PLAN

DETAIL AND
D20 D20 D20 D20 D20 D20
0.00 D20 D20 DESIGN. TYP. D20 D20 D20 D20
150

-0.15
D20 D20 D20 D20
D20 D20 D20 D20 D20 D20 D20 D20
1350

MOC Warehouse Project (SAL)


550*550

550*550

550*550

550*550

550*550

550*550
RIYADH, KINGDOM OF SAUDI ARABIA
-1.50

Grid B

REFERENCES
CONTRACT DRAWING

SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1
GENERAL COMMENTS:
GENERAL NOTES:

1- PROVIDE STEEL HOT ROLLED MEMBERS GRADE.


2- PROVIDE STEEL PAINTING AND FIRE PROOF CONDITION.
3- PROVIDE STEEL PLATES GRADES.
4- PROVIDE BOLTS GRADES.
5- PROVIDE PRETENSIONED BOLTS.
6- BOLTS USED IN THE ELEVATOR SHAFTS SHALL BE SLIP CRITICAL.
7- PROVIDE CAP PLATES ABOVE THE COLUMNS.
8- PROVIDE DETAILS FOR THE METAL DECKING.
9- MISSING CONNECTIONS DETAILS. NAME THE DETAILS WITH THE SAME NAME IN THE DESIGN CALCULATIONS.
10- PROVIDE PLATES DIMENSIONS AND HOLES PITCH.
11- PROVIDE WELD SIZES AND WELDING TYPE.
12- PROVIDE WELD ELECTRODE GRADE.
13- EXTENSION ABOVE THE SECONDARY STEEL BEAMS SHALL BE WITHIN CONCRETE DECK THICKNESS.
14- PROVIDE DIMENSIONS ON PLAN AS THERE ARE NO DIMENSIONS TO BE REVIEWED.
15- PROVIDE GENERAL NOTES FOR THE STEEL FABRICATION AND ERECTION SHOWING THE PLATES NAME LEGEND FOR
1 2 REFERENCE.
3 4 5 6 7 8

34076.5
7347 7899 5128 5217 5755.5 2084.5 645.5
+10.00
5500

IPE360 PL13*170 L= 1784


14 M 20 6 M 20
14 M 20
6 M 20 6 M 20 6 M 20 14 M 20 6 M 20 6 M 20 6 M 20 6 M 20 6 M 20 14 M 20 6 M 20 14 M 20 6 M 20 6 M 20 6 M 20 14 M 20
6 M 20 SUBMITTAL
6 M 20 6 M 20 6 M 20
IPE360 IPE360 IPE360 IPE360 IPE360 REV . DATE BY . DESCRIPTION CHKD . APPD .
+4.50
11500

6 M 20 PL13*170 L= 2672 6 M 20 6 M 20 PL13*170 L= 1784 4 M 20


IPE360 L= 2523 PL13*170 L= 2672
IPE360 L= 2523 PL13*170 L= 1784 PL13*170 L= 1784 PL13*170 L= 1784
PL13*170 L= 1784
IPE300 IPE300 IPE300 IPE300 COORDINATION
PREPARED BY ENGINEERING DEPT . DRAWN BY :
4500

CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM

SIGNATURE :

POSITION NAME SIGNATURE


HEA240

HEA240

HEA240

HEA240

HEA240

HEA240
DEPARTMENT HEAD ENG.AHMED ELSHERBINY

TECHNICAL MANAGER ENG.AHMED HAMDY OMAR

PROJECT MANAGER ENG.MAHMOUD HANAFY


D20 D20 D20 D20 D20 D20 D20 D20 D20 D20
0.00 D20 D20
150

KEY PLAN
-0.15
D20 D20 D20 D20 D20 D20 D20 D20 D20 D20
1350

D20 D20
500*500

500*500

500*500

500*500

500*500

500*500
-1.50
MOC Warehouse Project (SAL)
RIYADH, KINGDOM OF SAUDI ARABIA

Grid C

REFERENCES
CONTRACT DRAWING

SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1
GENERAL NOTES:

1 2 3 4 5 6 7 8

34076.5
4 M 20 7347 7899 5128 5217 5755.5 2084.5 645.5

4 M 20 4 M 20 4 M 20 4 M 20
4 M 20
5950

4 M 20 SUBMITTAL
12000

REV . DATE BY . DESCRIPTION CHKD . APPD .


B
4 M 20 4 M 20 4 M 20 4 M 20 4 M 20

COORDINATION
PREPARED BY ENGINEERING DEPT . DRAWN BY :

CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM

SIGNATURE :
6050

4 M 20 POSITION NAME SIGNATURE

DEPARTMENT HEAD ENG.AHMED ELSHERBINY

TECHNICAL MANAGER ENG.AHMED HAMDY OMAR

PROJECT MANAGER ENG.MAHMOUD HANAFY


ARE YOU KEY PLAN
USING
4 M 20
5BOLTS?
1 M 20
A
MOC Warehouse Project (SAL)
RIYADH, KINGDOM OF SAUDI ARABIA
4 M 20 4 M 20 4 M 20 4 M 20 4 M 20

Plan 0.00

REFERENCES
CONTRACT DRAWING

SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1
GENERAL NOTES:

8 8 M 16
7 14 M 20
4 M 20
8 M 16 8 M 16
6 8 M 16
8 M 16

4 M 20
6 M 20 6 M 20
6 M 20 8 M 16
10 M 20
8 M 20 14 M 20
5
14 M 20 8 M 24
6 M 20 4 M 20
6 M 20
6 M 20 4 M 20
6 M 20
4 8 M 20 6 M 20
8 M 20
14 M 20 10 M 20 14 M 20
10 M 20 8 M 24
6 M 20 6 M 20
6 M 20 6 M 20
3 10 M 20
6 M 20
14 M 20
8 M 20 2 M 16
6 M 20 10 M 20 6 M 20 6 M 20 8 M 20 2 M 16
6 M 20 6 M 20 2 M 16
6 M 20 SUBMITTAL
14 M 20 2 M 16 REV . DATE BY . DESCRIPTION CHKD . APPD .

4 M 16 6 M 20 8 M 20
8 M 20 6 M 20 2 M 16
2 8 M 20 10 M 20
6 M 20 8 M 24 6 M 20
10 M 20 14 M 20
14 M 20
6 M 20 COORDINATION
6 M 20 PREPARED BY ENGINEERING DEPT . DRAWN BY :

6 M 20 8 M 20 6 M 20 2 M 16 CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM

2 M 16
14 M 20 6 M 20 14 M 20 SIGNATURE :
8 M 20 2 M 16
10 M 20 POSITION NAME SIGNATURE

6 M 20 6 M 20 6 M 20 2 M 16 DEPARTMENT HEAD ENG.AHMED ELSHERBINY


1 6 M 20
2 M 16 8 M 24 TECHNICAL MANAGER ENG.AHMED HAMDY OMAR
6 M 20
6 M 20 PROJECT MANAGER ENG.MAHMOUD HANAFY
6 M 20 2 M 16
KEY PLAN
14 M 20 8 M 24
6 M 20 2 M 16
8 M 20 8 M 20
12 M 20 8 M 24
6 M 20 6 M 20
C 6 M 20 6 M 20 MOC Warehouse Project (SAL)
RIYADH, KINGDOM OF SAUDI ARABIA
2 M 16 2 M 16
2 M 16
8 M 20
8 M 24 6 M 20 2 M 16
14 M 20
B 6 M 20 6 M 20 8 M 24
2 M 16

10 M 16 2 M 16
8 M 20
8 M 24
6 M 20 8 M 20 2 M 16
A 2 M 16
8 M 24
6 M 20
6 M 20 2 M 16 6 M 20
6 M 20

6 M 20
Plan +4.50

REFERENCES
CONTRACT DRAWING

SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1
GENERAL COMMENTS:
GENERAL NOTES:

1- PROVIDE STEEL HOT ROLLED MEMBERS GRADE.


2- PROVIDE STEEL PAINTING AND FIRE PROOF CONDITION.
3- PROVIDE STEEL PLATES GRADES.
4- PROVIDE BOLTS GRADES.
5- PROVIDE PRETENSIONED BOLTS.
6- BOLTS USED IN THE ELEVATOR SHAFTS SHALL BE SLIP CRITICAL.
7- PROVIDE CAP PLATES ABOVE THE COLUMNS.
8- PROVIDE DETAILS FOR THE METAL DECKING.
9- MISSING CONNECTIONS DETAILS. NAME THE DETAILS WITH THE SAME NAME IN THE DESIGN CALCULATIONS.
10- PROVIDE PLATES DIMENSIONS AND HOLES PITCH.
11- PROVIDE WELD SIZES AND WELDING TYPE.
12- PROVIDE WELD ELECTRODE GRADE.
13- EXTENSION ABOVE THE SECONDARY STEEL BEAMS SHALL BE WITHIN CONCRETE DECK THICKNESS.
1 2 14-
3 PROVIDE DIMENSIONS4 ON PLAN AS THERE ARE 5NO DIMENSIONS TO BE REVIEWED.
6 7 8
15- PROVIDE GENERAL NOTES FOR THE STEEL FABRICATION AND ERECTION SHOWING THE PLATES NAME LEGEND FOR
REFERENCE.
34076
7347 7899 5128 5217 5756 2085 645

SHS100*4 SHS100*4
IPE360 SHS100*4 IPE360 IPE360
C IPE360
IPE360

IPE240
IPE300
IPE240
IPE240
IPE240
IPE240
IPE240
IPE240
IPE240
IPE240
IPE200
IPE240
IPE240
IPE240

IPE240 IPE200 DONOT MOVE THE


WORKING POINT

IPE240
IPE240
IPE240

IPE200
UNLESS VERIFIED BY
IPE240

IPE240
SHS100*4
THE ANALYSIS
5950

IPE200 MODEL.
IPE200

IPE300
IPE240

IPE300

IPE300
IPE200
12000

B SUBMITTAL
REV . DATE BY . DESCRIPTION CHKD . APPD .
IPE270

IPE270

IPE270

IPE270

IPE270

IPE270

IPE270

IPE270

IPE270

IPE270

IPE270

IPE270

IPE270

IPE270

IPE270

IPE270

IPE300

IPE300

IPE300

IPE300

IPE300
COORDINATION
PREPARED BY ENGINEERING DEPT . DRAWN BY :
CONNECTIONS
6050

CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM

DESIGN IS MISSING SIGNATURE :

FOR SUCH A POSITION

DEPARTMENT HEAD
NAME SIGNATURE

ENG.AHMED ELSHERBINY

CRITICAL CASE. TECHNICAL MANAGER ENG.AHMED HAMDY OMAR

PROJECT MANAGER ENG.MAHMOUD HANAFY


IPE360

IPE360

IPE360

KEY PLAN

IPE360

IPE360

IPE360
A IPE360
IPE120

IPE120

IPE120

IPE120

IPE120

IPE120

IPE120

IPE120

IPE120

IPE120

IPE120
MOC Warehouse Project (SAL)

IPE120

IPE120

IPE120
IPE120

IPE120

IPE120
IPE360

IPE120

IPE120

IPE120
IPE360

IPE360
RIYADH, KINGDOM OF SAUDI ARABIA
IPE360 IPE360
IPE360
IPE360
IPE270 IPE300
IPE270 IPE270 IPE270

Plan +4.50

REFERENCES
CONTRACT DRAWING

SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1
GENERAL COMMENTS:
GENERAL NOTES:

1- PROVIDE STEEL HOT ROLLED MEMBERS GRADE.


2- PROVIDE STEEL PAINTING AND FIRE PROOF CONDITION.
3- PROVIDE STEEL PLATES GRADES.
4- PROVIDE BOLTS GRADES.
5- PROVIDE PRETENSIONED BOLTS.
6- BOLTS USED IN THE ELEVATOR SHAFTS SHALL BE SLIP CRITICAL.
7- PROVIDE CAP PLATES ABOVE THE COLUMNS.
8- PROVIDE DETAILS FOR THE METAL DECKING.
9- MISSING CONNECTIONS DETAILS. NAME THE DETAILS WITH THE SAME NAME IN THE DESIGN CALCULATIONS.
10- PROVIDE PLATES DIMENSIONS AND HOLES PITCH.
11- PROVIDE WELD SIZES AND WELDING TYPE.
12- PROVIDE WELD ELECTRODE GRADE.
13- EXTENSION ABOVE THE SECONDARY STEEL BEAMS SHALL BE WITHIN CONCRETE DECK THICKNESS.
14- PROVIDE DIMENSIONS ON PLAN AS THERE ARE NO DIMENSIONS TO BE REVIEWED.
15- PROVIDE GENERAL NOTES FOR THE STEEL FABRICATION AND ERECTION SHOWING THE PLATES NAME LEGEND FOR
1 2 REFERENCE.
3 4 5 6 7 8

34076.5
7347 7899 5128 5217 5755.5 2084.5 645.5
C
8 M 16
8 M 16
8 M 16 4 M 16
IPE200 8 M 16

IPE200 IPE200

4 M 16 6 M 16

IPE200
5950

6 M 16 4 M 16
WHERE ARE SHS100*4 8 M 16
THE 4 M 16
IPE200 8 M 16
DIMENSIONS?
8 M 16 SHS100*4 SUBMITTAL
8 M 16 REV . DATE BY . DESCRIPTION CHKD . APPD .
12000

COORDINATION
PREPARED BY ENGINEERING DEPT . DRAWN BY :

CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM

SIGNATURE :

POSITION NAME SIGNATURE


6050

DEPARTMENT HEAD ENG.AHMED ELSHERBINY

TECHNICAL MANAGER ENG.AHMED HAMDY OMAR

PROJECT MANAGER ENG.MAHMOUD HANAFY

KEY PLAN

MOC Warehouse Project (SAL)


A RIYADH, KINGDOM OF SAUDI ARABIA

Plan +10.00

REFERENCES
CONTRACT DRAWING

SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1
GENERAL COMMENTS:
GENERAL NOTES:

1- PROVIDE STEEL HOT ROLLED MEMBERS GRADE.


2- PROVIDE STEEL PAINTING AND FIRE PROOF CONDITION.
3- PROVIDE STEEL PLATES GRADES.
4- PROVIDE BOLTS GRADES.
5- PROVIDE PRETENSIONED BOLTS.
6- BOLTS USED IN THE ELEVATOR SHAFTS SHALL BE SLIP CRITICAL.
7- PROVIDE CAP PLATES ABOVE THE COLUMNS.
8- PROVIDE DETAILS FOR THE METAL DECKING.
9- MISSING CONNECTIONS DETAILS. NAME THE DETAILS WITH THE SAME NAME IN THE DESIGN CALCULATIONS.
10- PROVIDE PLATES DIMENSIONS AND HOLES PITCH.
11- PROVIDE WELD SIZES AND WELDING TYPE.
12- PROVIDE WELD ELECTRODE GRADE.
13- EXTENSION ABOVE THE SECONDARY STEEL BEAMS SHALL BE WITHIN CONCRETE DECK THICKNESS.
14- PROVIDE DIMENSIONS ON PLAN AS THERE ARE NO DIMENSIONS TO BE REVIEWED.
15- PROVIDE GENERAL NOTES FOR THE STEEL FABRICATION AND ERECTION SHOWING THE PLATES NAME LEGEND FOR
REFERENCE.
A B C
A B C

12000
6050 5950 12000
+10.00 6050 5950
+10.00

SUBMITTAL
REV . DATE BY . DESCRIPTION CHKD . APPD .
6 M 20 14 M 20 14 M 20 10 M 16 12 M 20
IPE360 IPE360 IPE240 6 M 20 14 M 20 14 M 20 10 M 20 10 M 20 14 M 20
+4.50
IPE360 IPE360 IPE300
+4.50
8 M 24
COORDINATION
L80*8 8 M 24 PREPARED BY ENGINEERING DEPT . DRAWN BY :

L80*8 IPE300 L80*8 CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM

3 M 16 L80*8 IPE300 SIGNATURE :

DOUBLE POSITION NAME SIGNATURE


3 M 16
ANGLES. HEA240 DOUBLE DEPARTMENT HEAD ENG.AHMED ELSHERBINY

ANGLES. HEA240 TECHNICAL MANAGER ENG.AHMED HAMDY OMAR


HEA240

HEA240

PROJECT MANAGER ENG.MAHMOUD HANAFY

IPE300
HEA240

HEA240
KEY PLAN

0.00
-0.15
0.00
-0.15
MOC Warehouse Project (SAL)
-1.50 RIYADH, KINGDOM OF SAUDI ARABIA

-1.50

Grid 1
Grid 2

REFERENCES
CONTRACT DRAWING

SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1
GENERAL COMMENTS:
GENERAL NOTES:

1- PROVIDE STEEL HOT ROLLED MEMBERS GRADE.


2- PROVIDE STEEL PAINTING AND FIRE PROOF CONDITION.
3- PROVIDE STEEL PLATES GRADES.
4- PROVIDE BOLTS GRADES.
5- PROVIDE PRETENSIONED BOLTS.
6- BOLTS USED IN THE ELEVATOR SHAFTS SHALL BE SLIP CRITICAL.
7- PROVIDE CAP PLATES ABOVE THE COLUMNS.
8- PROVIDE DETAILS FOR THE METAL DECKING.
9- MISSING CONNECTIONS DETAILS. NAME THE DETAILS WITH THE SAME NAME IN THE DESIGN CALCULATIONS.
10- PROVIDE PLATES DIMENSIONS AND HOLES PITCH.
11- PROVIDE WELD SIZES AND WELDING TYPE.
12- PROVIDE WELD ELECTRODE GRADE.
13- EXTENSION ABOVE THE SECONDARY STEEL BEAMS SHALL BE WITHIN CONCRETE DECK THICKNESS.
14- PROVIDE DIMENSIONS ON PLAN AS THERE ARE NO DIMENSIONS TO BE REVIEWED.
A B C 15- PROVIDE GENERAL NOTES FOR
A THE STEEL FABRICATION BAND ERECTION SHOWING THE
C PLATES NAME LEGEND FOR
REFERENCE.

12000 12000
6050 5950 6050 5950
+10.00 +10.00

6 M 20 14 M 20 14 M 20 10 M 20 10 M 20 14 M 20 8 M 24 14 M 20 10 M 20 10 M 20 14 M 20
14 M 20
IPE360 IPE360 IPE300 IPE360 IPE360 IPE300
+4.50 +4.50 SUBMITTAL
REV . DATE BY . DESCRIPTION CHKD . APPD .

8 M 24 8 M 24
L80*8 6 M 20 L80*8
3 M 16 L80*8 IPE300 L80*8 IPE300
COORDINATION
3 M 16 PREPARED BY ENGINEERING DEPT . DRAWN BY :

DOUBLE HEA240 DOUBLE HEA240


CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM

ANGLES.
IPE300

ANGLES.

IPE300
HEA240

HEA240

HEA240

HEA240
SIGNATURE :

POSITION NAME SIGNATURE

DEPARTMENT HEAD ENG.AHMED ELSHERBINY

TECHNICAL MANAGER ENG.AHMED HAMDY OMAR


0.00
-0.15 0.00
-0.15 PROJECT MANAGER ENG.MAHMOUD HANAFY

KEY PLAN

-1.50 -1.50

MOC Warehouse Project (SAL)


RIYADH, KINGDOM OF SAUDI ARABIA

Grid 3 Grid 4

REFERENCES
CONTRACT DRAWING

SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1
GENERAL COMMENTS:
GENERAL NOTES:

1- PROVIDE STEEL HOT ROLLED MEMBERS GRADE.


2- PROVIDE STEEL PAINTING AND FIRE PROOF CONDITION.
3- PROVIDE STEEL PLATES GRADES.
4- PROVIDE BOLTS GRADES.
5- PROVIDE PRETENSIONED BOLTS.
6- BOLTS USED IN THE ELEVATOR SHAFTS SHALL BE SLIP CRITICAL.
7- PROVIDE CAP PLATES ABOVE THE COLUMNS.
8- PROVIDE DETAILS FOR THE METAL DECKING.
9- MISSING CONNECTIONS DETAILS. NAME THE DETAILS WITH THE SAME NAME IN THE DESIGN CALCULATIONS.
10- PROVIDE PLATES DIMENSIONS AND HOLES PITCH.
11- PROVIDE WELD SIZES AND WELDING TYPE.
12- PROVIDE WELD ELECTRODE GRADE.
13- EXTENSION ABOVE THE SECONDARY STEEL BEAMS SHALL BE WITHIN CONCRETE DECK THICKNESS.
14- PROVIDE DIMENSIONS ON PLAN AS THERE ARE NO DIMENSIONS TO BE REVIEWED.
15- PROVIDE GENERAL NOTES FOR THE STEEL FABRICATION AND ERECTION SHOWING THE PLATES NAME LEGEND FOR
REFERENCE.

A B C
A B C

12000
12000
6050 5950
6050 5950
+10.00
+10.00

4 M 20 4 M 20
IPE200
5500

5500
4 M 20 4 M 20

SUBMITTAL
REV . DATE BY . DESCRIPTION CHKD . APPD .
4 M 20
14 M 20 8 M 24 14 M 20 10 M 20 10 M 20 14 M 20 8 M 16
2 M 16 6 M 20 6 M 16 8 M 16
IPE120 IPE200
IPE360 IPE360 IPE300
+4.50
11500

IPE300 IPE200 IPE200


+4.50

11500
3 M 16 COORDINATION
4 M 16 2 M 16 6 M 20 4 M 20
6 M 20 L80*8 8 M 24 PREPARED BY ENGINEERING DEPT . DRAWN BY :

3 M 16 4 M 20 4 M 20 CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM

L80*8 IPE300 SIGNATURE :


4500

POSITION NAME SIGNATURE

4500
DEPARTMENT HEAD ENG.AHMED ELSHERBINY
HEA360 TECHNICAL MANAGER ENG.AHMED HAMDY OMAR
IPE300

PROJECT MANAGER ENG.MAHMOUD HANAFY


HEA240

KEY PLAN

0.00
150

-0.15 0.00

150
-0.15

IPE300

IPE300
1350

1350
MOC Warehouse Project (SAL)
RIYADH, KINGDOM OF SAUDI ARABIA
D20 D20 D20
-1.50
-1.50
D20 D20 D20 D20
400*400 D20
400*400

Grid 5 Grid 6

REFERENCES
CONTRACT DRAWING

SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1
GENERAL COMMENTS:
GENERAL NOTES:

1- PROVIDE STEEL HOT ROLLED MEMBERS GRADE.


2- PROVIDE STEEL PAINTING AND FIRE PROOF CONDITION.
3- PROVIDE STEEL PLATES GRADES.
4- PROVIDE BOLTS GRADES.
5- PROVIDE PRETENSIONED BOLTS.
6- BOLTS USED IN THE ELEVATOR SHAFTS SHALL BE SLIP CRITICAL.
7- PROVIDE CAP PLATES ABOVE THE COLUMNS.
8- PROVIDE DETAILS FOR THE METAL DECKING.
9- MISSING CONNECTIONS DETAILS. NAME THE DETAILS WITH THE SAME NAME IN THE DESIGN CALCULATIONS.
10- PROVIDE PLATES DIMENSIONS AND HOLES PITCH.
11- PROVIDE WELD SIZES AND WELDING TYPE.
12- PROVIDE WELD ELECTRODE GRADE.
13- EXTENSION ABOVE THE SECONDARY STEEL BEAMS SHALL BE WITHIN CONCRETE DECK THICKNESS.
14- PROVIDE DIMENSIONS ON PLAN AS THERE ARE NO DIMENSIONS TO BE REVIEWED.
15- PROVIDE GENERAL NOTES FOR THE STEEL FABRICATION AND ERECTION SHOWING THE PLATES NAME LEGEND FOR
REFERENCE.
A B C A B C

12000 12000
6050 5950 6050 5950
+10.00 +10.00

4 M 20 4 M 20
5500

5500
14 M 20 14 M 20 8 M 24 8 M 16 8 M 16 SUBMITTAL
REV . DATE BY . DESCRIPTION CHKD . APPD .
IPE360 IPE360 IPE200
+4.50 +4.50
11500

11500
8 M 16 4 M 20
L80*8
3 M 16 COORDINATION
L80*8
PREPARED BY ENGINEERING DEPT . DRAWN BY :

3 M 16
4500

4500
CHECKED BY: ARCHITECTURAL STRUCTURAL ELECTRICAL MECHANICAL SECURITY SYSTEM

SIGNATURE :

POSITION NAME SIGNATURE

HEA220
DEPARTMENT HEAD ENG.AHMED ELSHERBINY

TECHNICAL MANAGER ENG.AHMED HAMDY OMAR

PROJECT MANAGER ENG.MAHMOUD HANAFY

D20 D20 D20 KEY PLAN


0.00 0.00
150

150
-0.15 -0.15

IPE300

IPE300
D20 D20 D20
1350

1350
D20 D20 D20 D20

400*400
-1.50 -1.50 400*400 400*400 MOC Warehouse Project (SAL)
RIYADH, KINGDOM OF SAUDI ARABIA
D20 D20 D20 D20

Grid 7 Grid 8

REFERENCES
CONTRACT DRAWING

SHOP DRAWING

DISCIPLINE :

DRAWING TITLE :

DRAWN SCALE: DATE


CHECKED APPROVED
PROJECT REV.

SAL 1