Replacement of Parts
System
Power Distribution
MAGNETOM ESSENZA
2 Document Version / Disclaimer / Copyright
Document Version
Siemens Healthcare GmbH reserves the right to change its products and services at any
time.
In addition, manuals are subject to change without notice. The hardcopy documents cor‐
respond to the version at the time of system delivery and/or printout. Versions to hard‐
copy documentation are not automatically distributed.
Please contact your local Siemens Healthineers office to order a current version or refer to
our website http://www.siemens-healthineers.com.
Disclaimer
Siemens Healthcare GmbH provides this documentation “as is” without the assumption of
any liability under any theory of law.
The content described herein requires superior understanding of our equipment and may
only be performed by qualified personnel who are specially trained for such installation
and/or service.
Copyright
“© Siemens Healthineers, 2008” refers to the copyright of a Siemens Healthineers entity
such as:
Siemens Healthcare GmbH - Germany
Siemens Shenzhen Magnetic Resonance Ltd. - China
Siemens Shanghai Medical Equipment Ltd. - China
Siemens Healthcare Private Ltd. - India
Siemens Medical Solutions USA Inc. - USA
Siemens Healthcare Diagnostics Inc. - USA and/or
Siemens Healthcare Diagnostics Products GmbH - Germany
1 Safety 4
2 FRU Overview 5
3 PDS components 6
WARNING
Voltage continues to be present at the line voltage transformer even after the MR
system has been switched off.
Failure to observe safety precautions may result in death or serious bodily injury.
Circuit breaker F100 in the mains filter box (ECA, top) has to be switched off.
WARNING
Voltage continues to be present at the mains filter box even after the MR system
and F100 have been switched off.
Failure to observe safety precautions may result in death or serious bodily injury.
Always set the on-site circuit breakers to OFF before performing any service
activities on the mains filter box.
This chapter describes replacement procedures for the FRUs of the Power Distribution.
3.1.2 Preliminary
n Switch off the MR system.
n Switch off F100 (PDS) in the main box.
Fig. 1: Main box on the top of ECA
1
1
2
1 1
1 1
(1) Screws
(2) Front cover
n After the front cover is removed, circuit breakers can be replaced as needed.
Fig. 3: Circuit breakers
1
1
2
1 1
(1) Screws
(2) Top cover
1
2
3
4
(1) K2
(2) K1
(3) K3
(4) K4
3.2.2 Preliminary
n Switch off the MR system.
n Switch off F100 (PDS) in the main box.
Fig. 6: Main box on the top of ECA
3.2.3 Disassembly
1
1
(1) Mounting screws
3.2.4 Assembly
(1) 100-240V
3 1
4
2
(1) 36V
(2) GND 36V
(3) 24V
(4) GND 24V
Version 02 VS Version 01
n Change the graphics.( Fig. 6 Page 9)
Version 03 VS Version 02
Chapters Changes
( Safety / Page 4) Add the content about Protective earth connectiont‐
est.