: IF/QMS/13
REV. No.& Date : 02&
08.09.22
TITLE: PROCESS FOR MAINTENANCE & TOOL MANAGEMENT Efft. Date :-01/04/15
Revision History :-
Change
Made By Approved Affected Revision
Date Changes Made
(QMS By (HOD) Section No.
HEAD)
01.08.2021 Trolley maintenance point Lavneet R.K.Dubey 01
include
08.09.2022 Predictive Maintenance added Jagmohan R.K.Dubey 02
21.01.2023 Tools Breakdown analysis Jagmohan R K Dubey 03
requirement added
Page 1 of 10
QUALITY SYSTEM PROCESS DOC. No. : IF/QMS/13
REV. No.& Date : 02&
08.09.22
TITLE: PROCESS FOR MAINTENANCE & TOOL MANAGEMENT Efft. Date :-01/04/15
Purpose:- To maintain the machine /equipment /Die-Tool for ensuring continuing process performance
1. PROCESS SCOPE:-
This Process is applicable to establish& maintain a system for maintenance of the entire infrastructure
including Plant, machinery and equipment, utilities, material handling equipment to ensure the
improvement in effectiveness and efficiency of available infrastructure and for smooth production run &
Poka-Yoke & Trolley & Bin maintenance & This process is applicable to define the method to control of
production tooling management.
4. PROCESS DESCRIPTION: -
A. Preventive Maintenance:
Sr.
Activity Responsibility Ref. Doc.
No.
5.1
1) Prepare list of machine. Maintenance MASTER LIST OF
2) Prepare a daily maintenance checklist. MACHINES ML/02
5.2
Depending on nature of machine, prepare preventive
maintenance check sheet for each category/family of Machine preventive
equipment Maintenance
maintenance check sheet
IF/PRD/13
5.3
Prepare an ANNUALPREVENTIVE MAINTENANCE Maintenance Machine preventive
PLAN for in-house maintenance.(In house maintenance maintenance
plan& AMC Preventive maintenance plan made ) schedule-IF/PRD/07
5.4
Carry out preventive maintenance as per schedule using Maintenance Machine history card-
check sheet and update the history card. IF/PRD/16
5.5
In case, due to unavoidable reasons, it is not possible to carry
out maintenance as per schedule, prepare s a next earliest ----
possible date and carry out maintenance. Maintenance
Page 2 of 10
QUALITY SYSTEM PROCESS DOC. No. : IF/QMS/13
REV. No.& Date : 02&
08.09.22
TITLE: PROCESS FOR MAINTENANCE & TOOL MANAGEMENT Efft. Date :-01/04/15
5.6
Two in a year, review the annual maintenance plan on the
basis of maintenance history of machine and, if required ----
change the maintenance frequency. If required modify the Maintenance
check sheet also.
5.7
1:-The machines, for which in-house maintenance facilities Maintenance
are not available, get the machines maintained by Competent
External agencies through ANNUAL MAINTENANCE
CONTRACT. AMC
2:-M/C Handover after machine / tool to production
department after preventive maintenance and fill 4”M”
C. Breakdown Maintenance
5.9
A:- Intimate maintenance department whenever any User department
Breakdown Record
breakdown of the machine takes place. F/PRD/08
B:- Attend the problem and identify the root cause and
trouble shooting if problem is solved in house
C:-If problem is not solved in house then call External
Agency which is taken AMC or other specialist which is
short out the problem
5.10. 1:- Daily machine check sheet filled by operator before start Daily machine check sheet
Maintenance
1 the machine (F/MNT/01)
2:-Daily machine check sheet approved by supervisor and
filled Judgment.
3.: If any problem occurred by operator or supervisor then
used (x) mark and inform to maintenance department by
supervisor.
4:-Machine handover after maintenance to production
department.
5:- Maintenance record maintenance in machine history card
and machine break down record maintain.
Page 3 of 10
QUALITY SYSTEM PROCESS DOC. No. : IF/QMS/13
REV. No.& Date : 02&
08.09.22
TITLE: PROCESS FOR MAINTENANCE & TOOL MANAGEMENT Efft. Date :-01/04/15
F. Shutdown Maintenance
5.13
On the basis of breakdown history and shutdown need as ----
desired by production, make shutdown plan.
Maintenance
Carryout maintenance and prepare report,
G. Poka-Yoke
Page 4 of 10
QUALITY SYSTEM PROCESS DOC. No. : IF/QMS/13
REV. No.& Date : 02&
08.09.22
TITLE: PROCESS FOR MAINTENANCE & TOOL MANAGEMENT Efft. Date :-01/04/15
H. UTILITY MAINTENANCE
5.15 1. Master list of existing utility equipment (installed in the Maintenance Master List of Machine
plant) is maintained. &Utilities
Page 5 of 10
QUALITY SYSTEM PROCESS DOC. No. : IF/QMS/13
REV. No.& Date : 02&
08.09.22
TITLE: PROCESS FOR MAINTENANCE & TOOL MANAGEMENT Efft. Date :-01/04/15
CUTTING OIL:-
Page 6 of 10
QUALITY SYSTEM PROCESS DOC. No. : IF/QMS/13
REV. No.& Date : 02&
08.09.22
TITLE: PROCESS FOR MAINTENANCE & TOOL MANAGEMENT Efft. Date :-01/04/15
IF/WI/110
5.18 1:-Trolley and Bin scraped when trolley and bin is damage
New Tool / Fixture/ Gauges Development & Production Tool / Fixture Management
Page 7 of 10
QUALITY SYSTEM PROCESS DOC. No. : IF/QMS/13
REV. No.& Date : 02&
08.09.22
TITLE: PROCESS FOR MAINTENANCE & TOOL MANAGEMENT Efft. Date :-01/04/15
5.21 Prepare tool development plan Micro macro level plan &
action taken accordingly. In case of urgency or
breakdown ,wire cut process, or grinding process arranged
from approved source
Page 8 of 10
QUALITY SYSTEM PROCESS DOC. No. : IF/QMS/13
REV. No.& Date : 02&
08.09.22
TITLE: PROCESS FOR MAINTENANCE & TOOL MANAGEMENT Efft. Date :-01/04/15
Note: 1:-Before carrying maintenance which requires WELDING, GAS CUTTING & HIGH ALTITUDE
work, obtain WORK PERMIT from management. Also ensure to use required PPE’s.
Breakdown in hours
Page 9 of 10
QUALITY SYSTEM PROCESS DOC. No. : IF/QMS/13
REV. No.& Date : 02&
08.09.22
TITLE: PROCESS FOR MAINTENANCE & TOOL MANAGEMENT Efft. Date :-01/04/15
Page 10 of 10