MONITORING PENGECORAN PILE HEAD DIAMETER 1000 MM

No TITIK PILE HEAD TANGGAL Batcing Keteragan


VOLUME TOTAL
Kiri (U) Kanan ( S ) PENGECORAN Plant

1 PH2 02/08/23 20,20


2 PH3 02/08/23 20,20 60,60 RAJA
3 PH4 02/08/23 20,20
4 PH6 03/08/23 20,20
40,40 RAJA
5 PH7 03/08/23 20,20
6 PH5 04/08/23 20,20
40,40 RAJA
7 PH9 04/08/23 20,20
8 PH10 06/08/23 20,20
9 PH11 06/08/23 20,20 60,60 BMP
10 PH12 06/08/23 20,20
11 PH13 09/08/23 20,20
12 PH14 09/08/23 20,20 60,60 BMP
13 PH15 09/08/23 20,20
14 PH8 20/08/23 20,60 20,60 APB