Project Construction of Abusag Bridge, Approaches and Detour

Location Baggao, Cagayan Date Aug 18 2020


SURVEY REPORT
AS BUILT ON COLUMN PLUMBNESS

LEGEND

PLUMBNESS AT OBSERVATION POINT


DATE OF
No. PART OF STRUCTURE Down (cm) Up (cm) Deviation (mm)
OBSERVATION
A B A B A B
1 Pier 2R 33.80 26.20 34.00 26.30 (20.00) (10.00) Mar 03 2020
2 Pier 2L 21.20 20.50 21.20 20.40 - 10.00 Mar 03 2020
3 Pier 4R 16.00 17.80 16.00 18.00 - (20.00) Feb 15 2020
4 Pier 4L 41.20 18.00 41.50 18.10 (30.00) (10.00) Feb 15 2020
5 Pier 3R 29.00 19.10 29.00 19.00 - 10.00 Mar 07 2020
6 Pier 3L 18.10 18.50 18.00 18.50 10.00 - Mar 07 2020
7 Pier 1R 27.50 21.00 27.30 21.00 20.00 - Mar 12 2020
8 Pier 1L 28.80 18.50 28.90 18.60 (10.00) (10.00) Mar 12 2020
9 Pier 7R 26.40 19.40 26.50 19.50 (10.00) (10.00) May 19 2020
10 Pier 11R 27.10 23.60 27.00 23.50 10.00 10.00 Jul 27 2020
11 Pier 13R 28.70 28.30 29.00 28.50 (30.00) (20.00) Jul 11 2020
12 Pier 13L 27.80 32.50 27.80 32.50 - - Jul 11 2020
13 Pier 9R 30.50 33.10 30.60 33.00 (10.00) 10.00 Aug 03 2020
14 Pier 9L 18.50 32.50 18.50 32.50 - - Aug 10 2020
15 Pier abutment AR 27.80 27.70 27.80 27.80 - (10.00) Aug 14 2020
- -
- -
- -
- -

Prepared by Check and Verified by

MANUEL A. MANGAOANG JUNBERT E. OQUINDO


FGI Surveyor QC Engineer