Unit
Block- 4
1 Breaking and Lifting man Hole chambers 20
Approximately one to two feet height where ever Nos
required and Brick works for chambers with plastering.
2 Entire car parking area filling with concrete debris and Sqm 300
leveling with M sand and providing PCC of max one
feet to 3/4 Feet in gate entry zone to avoid rain water
entry inside the parking area.
Total Amount