SNO ITEM DESCRIPTION UNIT QTY Rate/

Unit
Block- 4
1 Breaking and Lifting man Hole chambers 20
Approximately one to two feet height where ever Nos
required and Brick works for chambers with plastering.
2 Entire car parking area filling with concrete debris and Sqm 300
leveling with M sand and providing PCC of max one
feet to 3/4 Feet in gate entry zone to avoid rain water
entry inside the parking area.

3 In electrical room cable trench closing with brick work Nos 1


and
concrete.
Supply and laying M sand filling of one feet height 40
4 around the boundary of inside compound. Block Unit
1,2,and3.
5
Total Amount

Block 1.2 & 3


1 Removal of Paver blocks in path way and storing & SQFT 3600
laying around compound wall, IN BLOCK1,2,and3.
2 Breaking and Lifting man Hole chambers Nos 44
Approximately one to two feet height where ever
required.
3 Filling M sand for the height of two feet from gate to Unit 35
dead end of path way as required. For blocks1,2and3.
4 Re routing of rain water drain line 5” till out of RM 100
compound. Underground
5 All electrical room cable trench closing with brick work Nos 3
and concrete
6 Supply and Construction of brick wall near lift and DG Nos 8
area in all Three blocks.
7 Supply and laying M sand filling of two feet height UNIT 30
around the boundary of inside compound. Block
1,2,and3.
8 Supply and Providing M10 or M15 RCC with 8 x10 mm SQFT 3600
tor steel
9 Brick works for chambers with plastering. Nos 44
( approximately 3000 bricks)
10 Supply and laying entire car parking area with M10 SQFT 7500
concreat grade/Tiles/Paver Block in blocks1,2 and 3.
approximate height of 4 to 6 inches from Road level
11 Raising the sliding gate to the height of matching Nos 2
concrete level.

Total Amount