You are on page 1of 1

QUALITY RECORDS

BI-DIRECTIONAL STATIC LOAD TEST GROUTING

PROJECT: PROJECT NO.

Pile No: Termination Grout Pressure Required: bars

Pile Length: Actual Termination Grout Pressure: bars

Type of Grouting Pre Grout / Post Grout Time Start Grouting:

Grout Mix: Time Completed Grouting:

W/C Ratio Theoritical Volume of Grout Injected: liters

Cement, Bag Total Volume of Grout Injected: liters

Water, 5 litre (barrel)

Fosroc Conplast SP2000 Litre

Remarks:

Prepared By: Witnessed By: Witnessed By:

Strainstall Maalysia Sdn Bhd CLIENT ENGINEER

Form Reference BM-PM-QR59 Page 1 of 1 Revision 0