6 - Computations and Cutting List
6 - Computations and Cutting List
Footing
F1 1.20 1.20 8.00 0.25 1.25 14.40
F2 1.00 1.00 3.00 0.25 1.25 3.75
F3 1.60 1.60 2.00 0.25 1.25 6.40
Columns
C1
C2
C3
Area of Columns
and Ftg 30.91
Area of Slab 40.9
Total Area 71.81 x 0.10 = 7.18 cu.m
Soil Poisoning
Application before pouring of concrete on foundation
(E.g. Chlordane - 6tbsp/gallon of water)
VOL Concrete AREA
2.88 11.52
0.75 3
1.28 5.12
1.29 8.63
0.27 1.83
0.12 0.81
6.60 30.91
LENGTH WIDTH QUANTITY DEPTH 1 DEPTH 2 VOL EXCAVATED VOL FILL AREA
Footing
F1 1.20 1.20 8.00 0.25 1.25 14.40 2.88 11.52
F2 1.00 1.00 3.00 0.25 1.25 3.75 0.75 3
F3 1.60 1.60 2.00 0.25 1.25 6.40 1.28 5.12
Columns
C1 0.20 0.30 8.00 1.00
C2 0.25 0.30 3.00 1.00
C3 0.20 0.30 2.00 1.00
Area of Columns
and Ftg 30.71
Area of Slab 37.9
Total Area 68.61 x 0.10 = 6.86
Soil Poisoning
Application before pouring of concrete on foundation
(E.g. Chlordane - 6tbsp/gallon of water)
Exercise 2: Concrete Works
Footing
F1 1.20 1.20 8.00 0.25 2.88
F2 1.00 1.00 3.00 0.25 0.75
F3 1.60 1.60 2.00 0.25 1.28
Columns
C1 0.20 0.30 3.4 0.20
C2 0.25 0.30 3.4 0.26
C3 0.20 0.30 3.4 0.20
C4/PC4 0.15 0.30 2.40 0.11
CS-1 0.20 0.30 2.40 0.14
CS-2 0.20 0.30 2.40 0.14
Beams
B1 0.20 0.35 15.00 1.05
B1A 0.20 0.35 5.80 0.41
B2 0.20 0.35 10.50 0.74
B2A 0.20 0.35 2.80 0.20
B3 0.20 0.35 2.40 0.17
B4 0.20 0.35 10.80 0.76
B5 0.20 0.40 4.80 0.38
4.75
CONCRETE
AREA DEPTH VOLUME
SLAB GF 37.9 0.075 2.8425 8.88
SLAB SF 39.0 0.075 2.93
STAIRS 1.20
Structure: Footing
REBAR SCHEDULE
Bar Type/ Bar Cutting Number Total No. of Pcs/ Ordered Quantity Total Cummulative
Mark Description/Cutting Detail Bar Size Weight Length of Pcs. Quantity Commercial (Commercial Length) Weight Weight
(kg/m) (m) /Set Length (kgs) (kgs)
1.20
10 8
F1 16mmØ 1.579 1.10 80 10.00 pcs - 16mmØ x 9.00 m 142.11
1.10 8 9
1.00
8 8
F2 16mmØ 1.579 0.90 24 3.00 pcs - 16mmØ x 7.50 m 35.53 #VALUE!
0.90 3 7.5
1.60
14 5
F3 16mmØ 1.579 1.50 28 6.00 pcs - 16mmØ x 7.50 m 71.06 #VALUE!
1.50 2 7.5
StructureColumn
REBAR SCHEDULE
Bar Type/ Bar Cutting Number Total No. of Pcs/ Ordered Quantity Total Cummulative
Description/Cutting Detail Weight Length of Pcs. Quantity Commercial Weight Weight
Mark Bar Size (kg/m) (m) /Set Length (Commercial Length) (kgs) (kgs)
0.20
0.30
4.35 6 2
C1 16mmØ 1.579 4.50 48 24.00 pcs - 16mmØ x 9.00 m 341.06 341.06
0.15 8 9
31 8
Ties 0.035 0.22 9mmØ 0.505 0.75 217 28.00 pcs - 9mmØ x 6.00 m 84.84 425.90
7 6
0.12
0.225
0.30
4.35 2 2
16mmØ 1.579 4.50 4 2.00 pcs - 16mmØ x 9.00 m 28.42 454.33
0.15 2 9
C3
4.35 4 2
20mmØ 2.466 4.50 8 4.00 pcs - 20mmØ x 9.00 m 88.78 543.10
0.15 2 9
31 8
Ties 0.035 0.22 9mmØ 0.505 0.75 62 8.00 pcs - 9mmØ x 6.00 m 24.24 567.34
2 6
0.12
Project: Oct. 21, 2014
Unit :
StructureColumn
REBAR SCHEDULE
Bar Type/ Bar Cutting Number Total No. of Pcs/ Ordered Quantity Total Cummulative
Mark Description/Cutting Detail Bar Size Weight Length of Pcs. Quantity Commercial (Commercial Length) Weight Weight
(kg/m) (m) /Set Length (kgs) (kgs)
0.20
0.30
3.60 4 2
C2 16mmØ 1.579 3.75 12 6.00 pcs - 16mmØ x 7.50 m 71.06 71.06
0.15 3 7.5
25 8
Ties 0.035 0.22 9mmØ 0.505 0.75 75 10.00 pcs - 9mmØ x 6.00 m 30.30 101.36
3 6
0.12
0.15
0.30
2.40 6 2
C4/PC 12mmØ 0.888 2.55 54 27.00 pcs - 12mmØ x 6.00 m 143.86 245.21
0.15 9 6
15 9
Ties 0.035 0.22 9mmØ 0.505 0.65 135 15.00 pcs - 9mmØ x 6.00 m 45.45 290.66
9 6
0.07
0.035 0.22
0.07
0.20 0.30
4.35
0.15
0.035 0.22
0.12
0.20
0.30
3.60
0.15
0.035 0.22
0.12
0.15
0.30
0.30
3.60
0.15
0.035 0.22
0.07
0.20 0.30
4.35
0.15
0.035 0.22
0.12
0.20
0.30
3.60
0.15
0.035 0.22
0.12
0.15
0.30
3.60
0.15
0.035 0.22
0.07
1.50
1.20
1.07
Beam 1 (L=3.25m)
dimension : 200mm x 350mm
Grid 4'/B-C
REBAR SCHEDULE
Bar Type/ Bar Cutting Number Total No. of Pcs/ Ordered Quantity Total Cummulative
Mark Description/Cutting Detail Bar Size Weight Length of Pcs. Quantity Commercial (Commercial Length) Weight Weight
(kg/m) (m) /Set Length (kgs) (kgs)
3.25
0.15 (verify) 0.15 4 2
A 16mmØ 1.579 3.55 4 2.00 pcs - 16mmØ x 7.50 m 23.69 23.69
1 7.5
0.15 0.85 2
B 16mmØ 1.579 1.00 2 23.69
1
0.85 0.15 2 1
C 16mmØ 1.579 1.00 2 1.00 pc - 16mmØ x 6.00 m 9.47 33.16
1 6
excess 1 - 1.2m
2.20 1
D 16mmØ 1.579 2.20 1 use excess @ Grid B/2-6 (Bar C) 33.16
1
0.045 0.12 21 7
0.26 9mmØ 0.505 0.85 21 3.00 pcs - 9mmØ x 6.00 m 9.09 42.25
1 6
Beam 1 (L=6.5m)
dimension : 200mm x 350mm
Grid 2/B-D
REBAR SCHEDULE
6.5
0.15
verify 0.15 4 1
A 16mmØ 1.579 6.80 4 4.00 pcs - 16mmØ x 7.50 m 47.37 47.37
1 7.5
0.15 0.85 2
B 16mmØ 1.579 1.00 2
1
0.85 0.15 2
C 16mmØ 1.579 0.95 2 2.00 pc - 16mmØ x 6.00 m 18.95 66.32
1
2.20 1
D 16mmØ 1.579 2.20 1 66.32
1
2.20 1
E 16mmØ 1.579 2.20 1 66.32
1
2
F 1.65 16mmØ 1.579 1.65 2 66.32
1
0.12
0.045 37 7
E 0.26 9mmØ 0.505 0.85 37 6.00 pcs - 9mmØ x 6.00 m 18.18 84.50
1 6
E 9mmØ 0.505 0.85 37
1 6
EXERCISE 4: FORMWORKS
Input here
Results only, do not overlay
BD FT 1,125.00 Bd.ft
Use
Lumber 211.00 PCS
Nails 26.00 KGS
Plywood 10.00 PCS