You are on page 1of 1

Scope of work

PROJECT NAME : SKMC DEVELOPMENT PROJECT- OUTPATIENT SPECIALITY CLINIC

CLIENT : M/S. SEHA & M/S SHEIKH KHALIFA MEDICAL CITY

CONSULTANT : M/S. Morgan Consulting Engineers.

CONTRACTOR : M/S. AL Reem Hospico Company LLC.

JOB TITLE : Rerouting of drainage riser 1st and 2nd floor to temporary


drainage network for renovation of the external drainage
network.

LOCATION : OUTPATIENT SPECIALITY CLINIC NO. – 1

INSTRUCTING PERSONAL : ENG. HARON SYAHI

END USER/ Contact no. : AL REEM HOSPICO COMPANY LLC. / 0501368515

S.NO Job Description


.
1 Coordinate with end user and security
2 Coordinate with SKMC MEP team
3 Work area cleared for safe access
4 Final circuit arrangements will be determined
5 Obtain Permit to work.
6 take clearance from the client
7 prepare the area for work
8 protect the work area
9 Shut down the 1st floor and 2sd floor bathroom and wash basin
10 Disconnect the existing pipe coming from 1 st & 2sd floor from ground floor
11 Rerouting the existing pipe to the temporary pipe
12 Check the drainage pipes
13 Restart the bathroom in 2st and 2sd floor
14 Check the new work for any leakage
15 Check all functions of the system
16 Site will be cleared
17 Site contact notified of work finished
18 Cancel permit to work
…..END……

Prepared by,
ENG. HARON SAYAHI
AL REEM HOSPICO COMPANY LLC.