Professional Documents
Culture Documents
I, ELDRIC L. TUBILLA, DRAFTSMAN III of the Building Design Division commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the pe
2023.
ELDRIC L. TUB
Draftsman II
Date: May 29,
Weight RATING
Major Final Output (MFO) SUCCESS INDICATORS (Targets + Measures) Actual Accomplishments
Allocation Q E T
90% CORE FUNCTIONS (90%)
A. Building Design Division Services
I. BUILDING DESIGN DIVISION - OFFICE
MFO-I
MANAGEMENT
1.1 OFFICE RECORDS, COMPILATION
OR DATABASE
1.1a Database / List of materials with updated 100% list of materials on database with updated price thoroughly
price. prepared every quarter of the year.
1.1b Compilation of completed projects plans 100% of completed project plans and details, specifications, and
and details, specifications, pictures and other pictures properly and completely compiled within 1 month after
documents. completion of the project for submission of documents.
100% of requested repair and maintenance of computers and
1.1c Repair and maintenance of computers and
printers checked and repaired within 4 hours upon receipt of
printers.
request.
100% of completed design and production of details properly
1.1d Database of Project Plans and Details saved/filed in a database within 1 month after completion of the
project.
ARCHITECTURAL DESIGN OF PARKS,
BUILDINGS AND RELATED
MFO-2
STRUCTURES (NEW PROJECTS / BY
CONTRACT / BY ADMIN)
2.1 PROJECTS DESIGN REQUIREMENTS
RESEARCH
2.1a Preparation of design requirements 100% of project design requirements properly and completely
research for building projects. (10sqm. to prepared research within 3 days upon receipt of the information
499sqm.) and inspection data for building projects. (10sqm. to 499sqm.)
2
2.2 PROJECT SITE INSPECTION AND
DATA GATHERING
2.2a Conduct complete site inspection and data 100% of site inspection and data gathering properly and
gathering for design consideration of building completely conducted within 2 days upon receipt of request or
projects. (10sqm. to 499sqm.) instruction for building project. (10sqm. to 499sqm.)
3.4a Prepare Sanitary and Plumbing plans and 100% of Sanitary plans and details completely prepared within 5
details. (100sqm. to 499sqm.) days upon receipt of data. (100sqm. to 499sqm.)
3.5a Prepare Electronics plans and details. 100% of Electronics plans and details completely prepared within
(100sqm. to 499sqm.) 5 days upon receipt of data. (100sqm. to 499sqm.)
3.6 FIRE PROTECTION PLANS AND
DETAILS
3.6a Prepare Fire Protection plans and details. 100% of Fire Protection Plans and details completely prepared
(100sqm. to 499sqm.) within 5 days upon receipt of data.(100sqm. to 499sqm.)
3
REVIEW AND REVISION OF
ARCHITECTURAL DESIGN OF PARKS,
MFO - 4 BUILDING AND RELATED
STRUCTURES, AND ENGINEERING
PLANS AND DETAILS.
4.1 ARCHITECTURAL PLANS & DETAILS
4.1a Review and revise Architectural plans and 100% of Architectural plans and details reviewed and revised 5
details of building project. (10sqm. to 499sqm.) days upon receipt of revision instruction. (10sqm. to 499sqm.)
4.4a Review and revise Electronics plans and 100% of Electronics plans and details completely reviewed and
details. (10sqm. to 499sqm.) revised within 5 days upon receipt of data. (10sqm. to 499sqm.)
5.1a Conduct inspection of Existing building 100% of Existing Buildings requested for renovation, completion,
requested for renovation, completion, expansion, extension, repair, alteration, properly inspected and
expansion, extension, repair, alteration. (10 sqm. data gathered within 4 hours upon receipt of instruction. (10 sqm.
to 499 sqm.) to 499 sqm.)
5.5a Prepare Sanitary and Plumbing plans and 100% of Sanitary plans and details completely prepared within 5
details. (10sqm. to 499 sqm.) days upon receipt of data. (10sqm. to 499 sqm.)
5
MFO-6 SPMS REPORT
11.1 Prepare IPCR Accomplishment Report Accomplishment report from January to June 2023, completely
from January to June 2023 prepared and submitted on the 10th of July 2023.
11.2 Prepare IPCR Target from January to June IPCR target from January to June 2024, completely prepared and
2024 submitted on the 11th of December 2023.
2. Attendance to the concern activities of the 100% City Government activities participated / attended within
City Employees the specified schedule
2.1 Adopted School Clean up
2.2 Coastal Clean up
2.3 PPUR Day / Subaraw Festival
2.4 Balayong Tree Planting Program
2.5 Light a Tree
2.6 Christmas Party
3. Participation in the Civil Service Commission 100% Celebration of Civil Service Commission (CSC) actively
(CSC) Celebration attend/participated in the specified schedule
4. Flag Raising Ceremony every Monday 100% Flag Raising ceremony properly and completely
Morning. attend/participate every Monday before 8:00 am.
Comments and Recommendations for Development Purposes
Core Functions
Support Functions
Adjectival Rating
ELDRIC L. TUBILLA
Draftsman III
Date: May 29, 2023
Date
TING
Remarks
A
8
9
10
11
Rating by Date
O R. TEVES
rchitect
12
mary Rating
Date