Professional Documents
Culture Documents
Project MarkSheet Semester 2 - 2023
Project MarkSheet Semester 2 - 2023
Group Project
S2, 2023
Group Name :
Group Members :
Day:
Slide 2 Yes [ ]
Month:
The name of the company for whom you are preparing the No [ ] Group Leader Lecturer (Signature)
presentation. Include their mission statement.
. .
Day:
Slide 3
Month:
Yes [ ]
The problem that the organisation is facing or opportunity Group Leader Lecturer (Signature)
that it has not taken, and the desired outcome. No [ ]
. .
Day:
Slide 4 Yes [ ]
Month:
. .
Day:
Slide 5
Month:
Yes [ ]
Context diagram of the current system and state the new Group Leader Lecturer (Signature)
capabilities of the proposed solution. No [ ]
. .
Day:
Slide 6 Yes [ ]
Month:
Day:
Slide 7
Month:
Yes [ ]
Context diagram of the proposed system. Group Leader Lecturer (Signature)
No [ ] . .
Day:
Slide 8 Yes [ ]
Month:
The work breakdown structure, the Gantt and PERT No [ ] Group Leader Lecturer (Signature)
chart of the project.
. .
Day:
Slide 9 Yes [ ]
Month:
Return on investment (ROI) and the payback No [ ] Group Leader Lecturer (Signature)
period, illustrate this by means of Cost-Benefit layout. . .
TOTAL: __
100
Slide show
Slide # Description Comments Mark
1
Cover page
__
• Group name & logo (3)
• S/nr, surname, initials(s), name, course, class group and also include
5
lecturer’s name (2)
2
Mission Statement __
• Name of company for whom you are preparing the presentation. (2) 5
• Their logo & mission statement. (5)
3 __
Define the Business Need.
12
4
The Preliminary Investigation Report:
Introduction (1)
Systems Request Summary (2)
Findings (3) __
Case for action (2) 15
Project Roles (1)
Time and Cost estimates (2)
Expected benefits (2)
Appendix(2)
5
Capability Gap Assessment:
__
• Context diagram of the current system and 10
• Outline the new capabilities of the proposed solution.
6
System Requirements:
__
• The functional and non-functional requirements of the proposed solution.
Classify them based on the five general categories of systems
10
requirements.( -½ if not classified)
7
Context diagram of the proposed system. __
10
8
Work Breakdown, GANTT & PERT
__
Length PERT = length GANTT
-5 If # of years not equal to GANTT chart # of years 15
9
Cost-Benefit layout (for the entire project)
10 Other
• Overall impression (3) __
• Other (2) 5
-10% if student did not hand in a disk or working disk