You are on page 1of 2

MANDERA/LODWAR FAT TEST CHECKLIST

415V BOARD
EQUIPMENT TEST
1 Physical inspection Dimensions, color
2 Current Transformers -Ct analysis
-Insulation resistance (IR)
-Primary injections
3 RELAY -secondary injections and trip test
-measurements (Relay, meters)
4 Circuit breaker -IR
-Pressure test
-manual operations & indications
- electrical operations & indications
5 Board -pressure test the Bus bar (2kv for 1min)
-interlock checks
-confirm auxiliary supplies (24VDC)

3.5MVA 415V/11KV Transformer –routine test in addition to the attached pdf as per tender
1 Physical inspection See attached pdf
2 Routine tests - Winding Resistance (all taps)
- Voltage Ratio ( all taps) and core balance(nominal tap)
- Polarity & Vector Group.
- Short Circuit Impedance
- No Load Losses
- Load Losses
-Insulation Resistance & PI (10min)
-Separate Source Ac Voltage Withstand Test
- BDV Of Transformer Oil
3

11kv BOARD

1 Physical inspection -Dimensions [WxHxD [attach layout drawing]


-Colour
-Busbar material (electrolytic copper),
-Lockable door with viewing glass in CB compartments.
-Shutters for Busbars [red] circuit [yellow], and provided.
-Anti condensation heater
-Hygrostat with variable and temperature control setting
-Rating (12kv)
2 Circuit breakers -rating 11kv , 630A feeders, 800A incomers
-IR
-Pressure 17.5Kv
-contact resistance test
-Timing test
-Manual operations and indications (3times)
-Electrical operations and indications (3times)
3 Current Transformer -IR
-Primary injections and trip tests
-Measurements (relay, meters)
-CT analysis
4 Voltage transformer -Ratio test
-IR
-Measurement(relay and meters)
5 Relays -secondary injections and trip tests
6 Bus bar Pressure test 17.5kv 1min