Professional Documents
Culture Documents
A
Kitchen
8.5
B
5.25
Corridor
25
Up
D
E
2.15
A
Storage
8.5
B
5.25
Corridor
25
D
E
2.15
A
Storage
8.5
B
5.25
Corridor
25
D
E
2.15
A
Storage
8.5
B
5.25
Corridor
25
Room
Room
Up
D
E
2.15
A
Storage
8.5
B
5.25
Corridor
25
Room
Room
Up
D
E
2.15
A
Storage
8.5
Office Conference
Room
Down
B
5.25
Corridor
Function Hall
25
Room
Down
D
E
2.15
APEX LINE
3.8
6th FL
3.8
5th FL
3.8
4th FL
3.8
3rd FL
3.8
2nd FL
3.8
1st FL
FGL
0.2
Front Elevation
PREPARED BY: PROJECT TITLE: CHECKED BY:
APEX LINE
3.8
6th FL
3.8
5th FL
3.8
4th FL
3.8
3rd FL
3.8
2nd FL
3.8
1st FL
FGL
0.2
Rear Elevation
APEX LINE
3.8
6th FL
бридж
3.8
5th FL BLDG.
3.8
4th FL
3.8
3rd FL
3.8
2nd FL
3.8
1st FL
FGL
0.2
Left View Elevation
PREPARED BY: PROJECT TITLE: CHECKED BY:
APEX LINE
3.8
6th FL
3.8
5th FL
3.8
4th FL
3.8
3rd FL
3.8
2nd FL
3.8
1st FL
FGL
0.2
Right Side Elevation