You are on page 1of 1

REPUBLIC OF THE PHILIPPINES

27.55 D.E.P.W.
OFFICE OF THE BUILDING OFFICIAL
2.15 4.70 4.70 4.70 3.60 4.70 3.00
CITY OF CEBU
C2
RECOMMENDING APPROVAL:

B PB
HEAD ARCHITECTURAL SEC.
s1 s1
APPROVED BY: DATE

9W 9W 9W 9W 9W
9W
2.95

BLDG. OFFICIAL DATE

R S
9W
WALL

T E
9W

N
5.10

A
9W 9W 9W 9W

P L
s1
FIRE

9W
1.08

s1
9W 9W 9W 9W 9W s3
1.08

s1 9W 9W
9W
A

C1

2.15 4.70 4.70 4.70 4.70 6.60 2.50


27.55
1 2 3 4 5 6 7 L E G E N D

ELECTRICAL PLAN TO POWER SUPPLY


10W (LED BULD) 6" PIN LIGHT CASING
DUPLEX CONV. OUTLET
SCALE : 1:80 MTS. SERVICE PANEL BOARD
ENTRANCE CIRCUIT BREAKER
LIGHT CIRCUIT LINE

OUTLET SCHEDULE OF LOAD M KILOWATT HOUR METER


2
2- NO. 8mm THW @ 20mmØ RSC
POWER CIRCUIT LINE
SWITCH DROP
CIRCUIT
NO. CIRCUIT SIZE OF WIRE TO BE USE CIRCUIT HOMERUN
DESCRIPTION VOLTS WATTS AMPS BREAKER CONDUIT

2
C1 21 21 (9 WATTS) 230 189 0.82 15 AT 20mmØ 3.5mm THW + 1-2.0mm
2 30 AT 2P
C2 8 8 (200 WATTS) 230 1600 7.00 20 AT 20mmØ 5.5mm THW + 1-2.0mm

C3 SPARE
15 AMPS
2 2
20 AMPS
SPECIFICATION
3.5mm THW 5.5mm THW
C4 SPARE C1 C1 ALL ELECTRICAL INSTALLATION SHALL CONFORM WITH THE
21 8 1789 7.82 RULES AND REGULATION OF THE P.I ELECTRICAL CODE OF
SPARE SPARE THE PHILIPPINES LOCAL ORDINANCE AND VECO.
C3 C4
ALL ELECTRICAL WIRING TO BE INSTALLED SHALL BE UNDER
SAMPLE COMPUTATION THE RESPONSIBLE CHARGE OF AN ELECTRICAL ENGINEER
OF ANY GRADE.
I = (0.25 LF X 7.0 + 7.82 ) X 100% DF I S= ( 2.0 X 7.0 + 7.82) X 100% 1-2.0mm GROUNDING
C ALL ELECTRICAL WIRING LAYOUT INSTALLATION SHALL BE
= 9.57 AMPS = 21.82 AMPS AS SHOWN IN THE PLAN.
RECOMMENDING APPROVAL
USE: 2- 8.0mm 2 THW @ 20mmØ RSC USE: 30 AT 2P CIRCUIT BREAKER NO WIRE SMALLER THAN 12mmØ TO BE USED.
SINGLE LINE DIAGRAM
LOWELL M. CORMINAL
OIC-ASST. CITY ENGINEER

FROM THE OFFICE OF: PREPARED: CHECKED & RECOMMENDED BY: PROJECT TITLE: SOURCE OF FUND: AIP 2015 APPROVED AS TO PLANS: APPROVED: SHEET NO.

THE CITY E REPUBLIC OF THE PHILIPPINES


OF C E B U C I T Y G O V E R N M E N T
REHABILITATION OF MULTI-PURPOSE BUILDING AT SITIO SANTO NIÑO
NG

E1 - E1
E
O F F IC

IN

OFFICE OF THE CITY ENGINEER


E ER

DEPARTMENT OF ENGINEERING BESIDE SPORTS COMPLEX


DOMINIC V. RABOR ELEAZAR R. LIPANG KENNETH C.M. ENRIQUEZ HON. EDGARDO C. LABELLA 05 05
1979

AND PUBLIC WORKS


CI

TY
U

C EB 3RD FLR. YUTIVO BLDG. JAKOSALEM ST. CEBU CITY ENGINEER, DEPW
OF ENGINEERING ASSISTANT, DEPW ARCHITECT IV - HEAD, PLANNING & DESIGN DIVISION LOCATION: BRGY. PASIL, CEBU CITY CEBU CITY MAYOR
CITY APPROVED:

You might also like