1. Supplying, fitting and fixing G.I.

pipe with all general fittings, such as Bends, elbows,


sockets, reducing sockets. Tee, unions, jam-nuts etc. including cutting trenches where
necessary and fitting the same with earth duly rammed and fixing in walls with holder bats and
making hole in floors, walls and consequent mending good the damages etc. all complete in all
respects approved and accepted by the Engineer.
a) 25 mm dia G.I. pipe with thickness 3.35 mm, outside diameter min 31.3 mm, weight
2.59 kg/m, can withstand min 50 kg/cm2 hydraulic pressure.
b) 50 mm dia G.I. pipe with thickness 3.65 mm, outside diameter min 57.3 mm. weight
5.38 kg/m, can withstand min 50 kg/cm2 hydraulic pressure.
2. Supplying, fitting and fixing of G.I. Union with sealant etc. complete in all respects approved
and accepted by the Engineer-in-charge. 50 min dia G.I Union
3. Supplying, fitting and fixing of best quality G.I. gate valve with sealant etc. Complete
approved and accepted by the Engineer
a) 25 mm brass gate valve
b) 50 mm brass gate valve
4. Supplying, fitting and fixing of best quality G.I. globe valve, threaded Joint with scalant etc.
Complete approved and accepted by the Engineer-in-charge.
a) 12 mm dia brass globe valve
b) 12 mm dia brass globe valve
5. Supplying, fitting and fixing of best quality G.I check valve, threaded Joint with sealant etc.
Complete approved and accepted by the Engineer-in-charge.
a) 75 mm brass check valve
6. Supplying, fitting and fixing of best quality Cast Iron Manual Butterfly Valve complete
approved and accepted by the Engineer-in-charge.
a) 50 mm Iron Manual Butterfly Valve
b) 75 mm Iron Manual Butterfly Valve
7. Supplying, fitting and fixing of best quality Non-Return flanged valve complete approved
and accepted by the Engineer-in-charge.
8. Supplying, fitting and fixing of best quality plastic coil pipe complete approved and accepted
by the Engineer-in-charge. 25 mm plastic coil pipe
9. Supplying, fitting and fixing of best quality Dosing pump
Dosing Capacity: 21L/hr. @ 7 bar
Brand: New Dose
Volt: 220V etc all complete in all respects approved and accepted by the engineer
10. Oxidation chamber
Maintenance and repairing of oxidation chamber with charged filter materials (catalyst). Two
coats of anti-corrosive bit mastic for internal and two coats of epoxy synthetic for external paint
etc. all complete in all respects approved and accepted by the Engineer.
11. Sodium hypo chloride NaOCL (Liquid)
Sodium hypo chloride is a strong oxidation agent. To oxidize raw water, this is used in water
plant etc. all complete in all respects approved and accepted by the Engineer.
12. Supplying, fitting and fixing of best quality Filter media complete approved and accepted
by the Engineer-in-charge.
a) Multimedia Gravels and Mash sand
b) Activated Carbon coconut shell or coal-based granular
c) Manganese Zeolite
13. Supplying, fitting and fixing of best quality Internal filter of WTP (Existing vessels top and
bottom strainer repair and charge) complete approved and accepted by the Engineer-in-charge.
14. Renewing painting of epoxy paint inside and enamel paint on the outside of the filter vessel
etc. all complete in all respects approved and accepted by the Engineer.
15. Tank Wash (Underground raw water tank and treated water tank wash and disinfection.)
all complete in all respects approved and accepted by the Engineer.
16. Supplying, fitting and fixing of best quality Internal filter for Mini WTP of roof of Old PTB
(Existing vessels top and bottom strainer repair and charge) complete approved and accepted
by the Engineer-in-charge.
17. Supplying, fitting and fixing of best quality Front and delivery pipe line Valve, Pipe and
Fittings (CPVC), 25mm 150 Rm, 12mm pipe 60 Rm etc. all complete in all respects approved
and accepted by the Engineer.
18. Pipe line wash with chemical for Mini WTP of roof of old PTB complete approved and
accepted by the Engineer-in-charge.
19. Supplying, fitting and fixing of food graded plastic overhead water reservoir/ tank including
all necessary fittings, hardware and consumables etc. all complete approved and accepted by
the Engineer-in-charge (2000 liter capacity)
20. Washing of food graded plastic tank/ ferro-cement tank with bleaching powder & change
of jam-net including all necessary fittings, hardware and consumables etc. all complete
approved and accepted by the Engineer-in-charge.