You are on page 1of 3

Sanitary mechanical works

Total Category Quantity Unit HUSSAIN AL MUFTAH ESTABLISHMENT Item No


PROPOSED WAREHOUSE (G+M) , SHOWROOM (G+M) , OFFICE (G+1) &
ACCOMMODATION (G+2)

Water supply works


Polypropylene Random Copolymer water pipes
By longitudinal meter, supply and installation of PPR pipes, produced
by Blanger (B.R& hdpe) PN20, to be installed on the wall, suspended
in the ceiling, or buried in the floors or walls, complete with all
accessories, special parts, fixings, and everything necessary to complete
the work in the best way and according to the drawings and
specifications. Centimeters, including pipe insulation according to
request And the work is complete from all of it.

44 MT 15 mm diameter
66 MT 22 mm diameter
HDPE water pipes
'By longitudinal meter, supply and installation of HDPE pipes,
produced by Blanger (B.R& hdpe) PN20, to be installed on the wall,
suspended in the ceiling, or buried in the floors or walls, complete with
all accessories, special parts, fixings, and everything necessary to
complete the work in the best way and according to the drawings and
specifications. Centimeters, including pipe insulation according to
request And the work is complete from all of it.

54 MT 15 mm diameter
148 MT 22 mm diameter
20 MT 28 mm diameter
15 MT 32 mm diameter
100 MT 42 mm diameter
sanitary devices
By number: Supply, installation and testing of a luxury s&p French toilet
with a self-produced bidet (ideal standard or similar) with a comprehensive
anti-discharge valve, Chinese and sedele leaf, lock cocks, drainage, feeding
12 NO and ventilation connections, and the item with all its inclusions from what
.it assembled

Supplying and installing an oval washbasin,fixed above the marble, brand


Ideal Standard, or similar, , including the floor, all drainage and feeding
connections, angle valves, accessories for finishing, and everything
9 NO necessary to finish the work in the best way, according to the specifications
and drawings

Supplying and installing an oval washbasin, brand Ideal Standard, or


similar, , including the floor, all drainage and feeding connections, angle
valves, accessories for finishing, and everything necessary to finish the
6 NO .work in the best way, according to the specifications and drawings

Kitchen Sink wall


6 NO

water tank
Closed type tank300 galon made from polyethylen or grp
2 NO c/w all valves and accessories as per cpecs.
Sanitary mechanical works

Total Category Quantity Unit HUSSAIN AL MUFTAH ESTABLISHMENT Item No


PROPOSED WAREHOUSE (G+M) , SHOWROOM (G+M) , OFFICE (G+1) &
ACCOMMODATION (G+2)

'Closed type tank 1000 galon made from polyethylen or


2 NO grp c/w all valves and accessories as per cpecs.

sewage works
Upvc pipes
By longitudinal meter, supply and installation of Upvc plastic pipes 6 bars
for the necessity of drainage, work and ventilation, to be installed on the
wall, suspended under the ceilings, or buried inside the wall or under the
tiles, according to the specifications, drawings, and the item includes
suspension, isolation, and special pieces, provided that they are of the type
that are installed in the manner of gaskets, and everything necessary for
finishing Work perfectly.

72 All of which are Upvc plastic pipes with a diameter of 50mm


MT
162 All of which are Upvc plastic pipes with a diameter of 100 mm
MT
111 All of which areUpvc plastic pipes with a diameter of 150mm
MT
electrical heater
Supplying and installing an electric water heater complete with flexible
connections, a safety valve, a non-return valve, and everything necessary
to complete the work according to the specifications and drawings.
9 NO electrical heater 50 LIT C
3 NO electrical heater 150 LIT
Floor siphon
By kit. Supply and installation of a floor siphon made of plastic, complete
with a non-rusting cover, gold or similar, with all inclusions, connections
23 NO and drainage, according to specifications. The outlet diameter is 3 inches,
.which is assembled

Floor Clean Out


Bynumber supplying and installingfloor clean out with all connections
8 NO according to specifications
plastic hobbies
By the number supply and installation of a hobby of plastic the need to
cover the drainage and work columns Ventilation, rain and all that is
5 NO necessary to complete the work in the best way, according to the
" specifications and drawings

stream of flowers
Gregory
By number Supply and installation of rain drains for the roof Roof
drain Installation next to the wall or in the middle in the form of a semi-
circle or a circle with a cover, provided that they are of the best
imported types, western industry, and the item includes everything
necessary to complete the works according to the specifications and
drawings to the fullest extent

10 NO All of which are rain drains with a diameter of 110 mm


3 NO RAIN water gully
GUTTER DRAIN
1 NO 10000X200X200mm REINFORCE CONCRETE GUTTER DRAIN
1 NO C/W HEAVY DUTYREINFORCE
6000X200X200mm GALVANIZED STEEL GRATING.
CONCRETE GUTTER DRAIN
C/W HEAVY
Water meter DUTY GALVANIZED STEEL GRATING.
Sanitary mechanical works

Total Category Quantity Unit HUSSAIN AL MUFTAH ESTABLISHMENT Item No


PROPOSED WAREHOUSE (G+M) , SHOWROOM (G+M) , OFFICE (G+1) &
ACCOMMODATION (G+2)

Supplying and installingcopper, a western industry of the finest types.


The category is loaded with the chamber, cover, connection and
installation from an approved sample and all that is needed to complete
the work in the fullest manner.

1 NO Water meter
Inspection rooms
Supply and installation of man hole from concrete according to
drawing and spec, with600*750

8 NO Which is all in number


Supply and installation of man hole from concrete according to
drawing and spec, with 600*900

1 NO Which is all in number


Supply and installation of man hole from concrete
according to drawing and spec, with 900 DIA

1 NO Which is all in number


1 NO GREASE TRAP (450*450)
Locker room
Supply, installation and work of a valve chamber with an internal
size of 60 x 90 cm with cast iron cover and a weight of 125 kg
1 NO .with a valve locking diameter of 50 mm

1 NO Gate VALVE
DOMESTIC LIFTING PUMPS
2 NO (1DUTY+1 STANBY)2.0 L.S
DOMESTIC DISTRIBUTION PUMPS
2 NO (1DUTY+1 STANBY)2.5 L.S
2 NO (1DUTY+1 STANBY)1.5 L.S
TOTAL WORKESanitary mechanical