ITEM DESCRIPTION

Stage 01
Network Pipes (HDPE)
Supply and install HDPE (PE 100 SDR 11 ) pipes for water networks, pressure class 16.00 bars, including all fittings laid in tre
200 mm dn
Air valve Chamber for Main Network
Reinforced Concrete Air valve chamber on nominal bore : 75 mm, including excavation, concrete works, valves, associated pi
cover, backfilling etc. complete in all respects and in accordance to schedule of Project requirements, particular specification
concept drawings.
on 200 mm dn main pipe
Wash valve Chamber for Main Network

Supply, construct, and equip, Washout Valve Chamber, complete with all valves, fittings and accessories; including excavati
material, reinforced concrete chamber with all structural works, stairs, covers and frames, backfilling using suitable material
removal of excess materials, connection to main pipe, etc.; as specified and detailed on drawings.

on 200 mm dn main pipe


Stage 02
Network Pipes (HDPE)
Supply and install HDPE (PE 100 SDR 11 ) pipes for water networks, pressure class 16.00 bars, including all fittings laid in tre
200 mm dn
Air valve Chamber for Main Network
Reinforced Concrete Air valve chamber on nominal bore : 75 mm, including excavation, concrete works, valves, associated pi
cover, backfilling etc. complete in all respects and in accordance to schedule of Project requirements, particular specification
concept drawings.
on 200 mm dn main pipe
Stage 03
Network Pipes (HDPE)
Supply and install HDPE (PE 100 SDR 11 ) pipes for water networks, pressure class 16.00 bars, including all fittings laid in tre
150 mm dn
200 mm dn
Valve Chambers

Reinforced Concrete Isolation valve chamber : including excavation, concrete works, valves, associated pipe fittings, chamb
etc. complete in all respects and in accordance to schedule of Project requirements, particular specifications and as shown o

150mm dn
Air valve Chamber for Main Network
Reinforced Concrete Air valve chamber on nominal bore : 75 mm, including excavation, concrete works, valves, associated pi
cover, backfilling etc. complete in all respects and in accordance to schedule of Project requirements, particular specification
concept drawings.
on 200 mm dn main pipe
Wash valve Chamber for Main Network
Supply, construct, and equip, Washout Valve Chamber, complete with all valves, fittings and accessories; including excavati
material, reinforced concrete chamber with all structural works, stairs, covers and frames, backfilling using suitable material
removal of excess materials, connection to main pipe, etc.; as specified and detailed on drawings.

on 200 mm dn main pipe


meter with manhole 8 "
Water Pump Station
Supply, installation, delivery, testing and commissioning of BOOSTIMG PUMP, complete including pump, motor, spare parts
pump manufacturer all as specified and as detailed on drawings.
A set of three pumps (two + one spare) each with a capacity of 350 gallons / minute and a pressure of 8 bar
Tank
Supply & installation of Concrete water Tank complete with all accesseories and control for tank filling and operation.
Tank Volume :3000 m3( for 1 week storage )
UNIT QTY

ngs laid in trenches as specified


MR 832

associated pipe fittings, chamber


specifications and as shown on

Nr 1

ding excavation in any kind of


ble materials, compaction, and
rawings.

Nr 1

ngs laid in trenches as specified


MR 461

associated pipe fittings, chamber


specifications and as shown on

Nr 1

ngs laid in trenches as specified


MR 600
MR 1697

ttings, chamber cover, backfilling


d as shown on concept drawings.

Nr 23

associated pipe fittings, chamber


specifications and as shown on

Nr 1
ding excavation in any kind of
ble materials, compaction, and
rawings.

Nr 2
Nr 1

, spare parts guaranteed by the

Nr 1

Nr 1