MEASUREMENT
FOR hot and cold
water services
1
2
Direct system
Indirect system
DIRECT SYSTEM
4
Direct System
DIRECT COLD WATER SYSTEM
7
DIRECT COLD WATER SYSTEM
8
INDIRECT SYSTEM
9
12
PLUMBING & MECHANICAL ENGINEERING
INSTALLATION (Section Q)
13
2.SPECIAL CONNECTION
Special connection and special joints shall be
enumerated separately stating the nominal size
and kind of pipe concerned and the method of
jointing (Q.9.1)
Classificationshall be as follows:-
◦ Connection between pipes of differing
materials and differing grades of the same
materials
◦ Connection between pipes and appliances or
equipment
◦ Connection to existing pipes
14
3.SUNDRIES
Pipe sleeves through walls, floors and
ceiling shall be enumerated stating the
◦ type,
◦ lengths,
◦ the nominal size and
◦ kind of pipe passing through (Q.11.6)
15
4.PIPEWORK SUPPORTS
Standard pipe support shall be given in the description of the
pipes stating type and spacing of the supports (Q.12.1)
16
5.CONNECTION TO PUBLIC
MAIN
Connection to public mains which
may be carried out by a Public
Undertaking / Local Authority shall
be given as a provisional sum (Q.13)
17
6.EQUIPMENT AND
ANCILLARIES
19
8. INSULATION
Generally, particulars of Q.25.1a-d shall be
given
20
8. INSULATION
Working insulation over flanges and pipe
fittings shall be deemed to be included
with the insulation pipe work (Q.26.3)
21
9. SUNDRIES
Testing each installation shall be
given as an item stating (Q.30.4):-
◦ Any required qualifications of the
attendant
◦ The number of stage tests in addition
to the final
◦ The purpose of tests
◦ The instrument and appliances required
to be provided
22
10. BUILDER’S WORK
All items of builder’s work shall be
given in accordance with the
appropriate sections (Q.31.1)
23
10. BUILDER’S WORK
EXAMPLE:-
◦ Trench excavation
◦ Inspection chambers
◦ Boring or excavation holes in the
ground
24
25
COLD WATER
INSTALLATION
1. Pipe work
2. Pipe fittings
3. Valve
4. Water tank
5. Excavation
6. Testing
26
1. PIPEWORK
Have to be separated according to type & size and
place laid/fixed (Q.8.4)
EXAMPLES OF DESCRIPTION:-
27
1. PIPEWORK (CONT’D)
EXAMPLES OF DESCRIPTION:-
28
2. PIPE FITTINGS
Measured in No. as extra over the pipe
(Q.8.6)
29
2. PIPE FITTINGS (CONT’D)
EXAMPLES OF DESCRIPTION:-
30
3. VALVE
Stop valve – high pressure pipework (before main water tank)
Measured in No.
EXAMPLES OF DESCRIPTION:-
….mm Diameter low pressure, gate valve and jointing to pre tubing
at both ends
31
4. WATER TANK / CISTERN
Measured in No.
EXAMPLES OF DESCRIPTION:-
32
4. WATER TANK / CISTERN
04/08/21 33
5. TESTING
As an Item
EXAMPLE OF DESCRIPTION:-
34
35
DOMESTIC HOT WATER
SYSTEM
36
HOT WATER
INSTALLATION
Central Heating
Direct System
Indirect System
Individual System
Electric Water Heater
Gas Water Heater
Solar Water Heater
37
A CENTRAL HEATING SYSTEM
38
CENTRAL
HEATING:-
DIRECT
SYSTEM
39
CENTRAL
HEATING:-
INDIRECT
SYSTEM
40
INDIVIDUAL SYSTEM: 1.
ELECTRICAL WATER HEATER
41
INDIVIDUAL SYSTEM: 1.
ELECTRICAL WATER HEATER
04/08/21 42
INDIVIDUAL SYSTEM: 1. GAS
WATER HEATER
43
44
SUMMARY FOR ITEMS TO BE
MEASURED FOR HOT WATER
INSTALLATION
Pipework Insulation
Copper, brass, Insulation to pipe
stainless steel Insulation to water
Smaller nominal size source (boiler/cylinder)
compared to cold
water pipe Hot Water Source
Boiler
Pipe fittings
Calorifier
Bends, elbow, tee
Hot water cylinder
Valves
Stop / gate valves
45
ITEM TO BE MEASURED
1. Pipework (m)
1. State the type, nominal size, method of
jointing and fixing
2. Pipe fittings (No.)
1. Extra over the pipe
3. Valves (No.)
1. State the type, nominal size, method of
fixing to pipe
46
ITEM TO BE MEASURED
4. Insulation
4. To pipe work (Q.25)
5. To equipment (Q.28) (No.)
5. Boiler, Calorifiers, Hot water
cylinder (appliances for providing a
more-or-less constant supply of hot
water) (No.)
6. Testing (Item)
47
48
HOT WATER IN COLD WATER
TANK
49