The document lists 11 pending tasks for a construction project, including installing calcium silicate boards in the bathroom ceiling, handles for the TV storage and mandir grawers, buffing and polishing railings and welding, polishing safety door rods, installing bedroom doors and hardware, making an MDF shutter door with CNC cutting for the mandir, laminating the kitchen loft, installing hardware for the main and safety doors, and properly applying rubber to the windows.
The document lists 11 pending tasks for a construction project, including installing calcium silicate boards in the bathroom ceiling, handles for the TV storage and mandir grawers, buffing and polishing railings and welding, polishing safety door rods, installing bedroom doors and hardware, making an MDF shutter door with CNC cutting for the mandir, laminating the kitchen loft, installing hardware for the main and safety doors, and properly applying rubber to the windows.
The document lists 11 pending tasks for a construction project, including installing calcium silicate boards in the bathroom ceiling, handles for the TV storage and mandir grawers, buffing and polishing railings and welding, polishing safety door rods, installing bedroom doors and hardware, making an MDF shutter door with CNC cutting for the mandir, laminating the kitchen loft, installing hardware for the main and safety doors, and properly applying rubber to the windows.
Calcium Silicate Moisture Resistant Board Ceiling for bathroom pending
2. Handle for tv storage pending
3. Handle for mandir grawers peding 4. Ralling buffing and polish and velding is pending 5. Polish if saftey door rods pending 6. 2 bedroom door installation pending 7. Bedroom door hardware pending 8. Mdf shutter door with cnc cut in duco finish for mandir pending 9. Kitchen loft lamination pending 10 main door and saftely door hardware pending 11. Windows rubber properly not done