Project : DS‐188 Jabel Ali Industrial ‐ Sewerage and Drainage Systems

Employer : Dubai Municipality


Contractor : Arabtec Engineering Services LLC

(BATCH 75 ‐ Rev.1) DESIGN OF SECANT PILES NDM PITS


Date: 11.09.2023

Pit Excavation
Main Pit Formation Pit Excavation
S.N. MH Ref MH Type BH Reference Pipe Dia (mm) Pit Designation OGL (m) IL (m) Diameter ‐ Pit Type Machine Remarks
Zone Level (m) Depth (m)
Internal (m)

1 2E MH‐1‐9/14/4 I 420 A 500 DRIVING 10.830 4.580 3.630 7.200 5.00 Circular AVN 800 BH Report revised
2 2E MH‐1‐9/14/5 I 422 500 RECEVING 9.370 4.700 4.225 5.145 4.00 Circular AVN 800
3 2E MH/R6/9/15 D 424 200 RECEVING 8.794 2.377 1.852 6.942 4.00 Circular AVN 800
4 1M MH‐1‐3/19/2 J 386 B 600 DRIVING 8.110 0.805 0.005 8.105 5.00 Circular AVN 600 MH & BH Changed

Page 1 of 1