The daily safety report summarizes activities from installing ballistic windows and doors at Project SEJ Security Upgrade & Annex Refurbishment. Three workers set doors 60-63 and prepared the sealant for door and window locks at location 2 from 8am to 5pm. There were no safety incidents reported. The weather was sunny all day.
The daily safety report summarizes activities from installing ballistic windows and doors at Project SEJ Security Upgrade & Annex Refurbishment. Three workers set doors 60-63 and prepared the sealant for door and window locks at location 2 from 8am to 5pm. There were no safety incidents reported. The weather was sunny all day.
The daily safety report summarizes activities from installing ballistic windows and doors at Project SEJ Security Upgrade & Annex Refurbishment. Three workers set doors 60-63 and prepared the sealant for door and window locks at location 2 from 8am to 5pm. There were no safety incidents reported. The weather was sunny all day.
DAILY SAFETY REPORT 13-Jul-23 DATE DAILY NO. No. Location Time Activitie 1 Lock 2, door 60,61,62,63 08.00 - 17.00 Setting doors 60,61,62,63 2 Lock 2 08.00 - 17.00 Preapre sealant door & window lock 2
Man Power Qty Meeting Qty Accident /Incident TODAY
Indolok Bakti Utama 1 Toolbox Meeting 1 Fatality / Kematian 0 Ballistic Door & Window 2 Lost Time Injury (LTI) 0 Safety Officer - Non Lost Time Injury (NLTI) 0 First Aid 0 Inspection Qty Near Miss 0 Total Man Power 3 Operation site Inspection Property/Asset damage 0 PPE - Man Hours 24 Tools Over Time : prsn X 4 hrs Manajemen Visit Yesterday Man Hours Total Today 0 Cumm Man Hours 24 Training Qty Weather : S: Sunny C: Cloudy R: Rain Material Safety Data Sheet - 08.00 : S 13.00 : S 09.00 : S 14.00 : S Safety Induction - 10.00 : S 15.00 : S 11.00 : S 16.00 : S Total Today 0 12.00 : S 17.00 : S Activity in site Area