You are on page 1of 1

D-XXXXX: XXXXXXXXXXXXXXXX

REF NO: 15

15.0 BRIEF DESCRIPTION (HSE CONTINUAL IMPROVEMENT


PROGRAMS)
MVP TECH is required to continually improve the suitability, adequacy, and
effectiveness of the HSE management system in order to prevent occurrence of incidents
and nonconformities, promote a positive occupational health and safety culture and
enhance OH&S performance.
Continual improvement process to be adopted in the project includes:
1. Promotion of good practices deed as implementation of rewards program.
2. Implementation of Safety campaigns such as medical surveillance day, Heat stress
campaign, Health day, Safety day etc.
3. Direct involvement and participation of top management in all HSE related
programs.
4. Engagement with Local community on safety related awareness programs.
5. Proper Management of Change Process
6. Ensuring Intensive training for all project staff
7. External auditing of HSEMS and closing out of non-conformances in addition to
implementing lesson learned actions in all aspect of the project.

Supporting Documents Attached:


• Safety Champion Certificate
• Responsibility Matrix & Competency Matrix
• Specified training for proposed project staff (First Aid/Firefighting)
• Safety Reward Program
• Heat Stress Campaign program
• Environmental Day

PREPARED BY: YASIR HUSSAIN APPROVED BY: HANEEN HANKIR


AHSE ENGINEER ES OPERATIONS MANAGER-MEA

You might also like