You are on page 1of 2

AUTO-BUILD CONT.

COMPANY

PROJECT : PROPOSED G+4+R RESIDENTIAL BUILDING


PLOT NO : 6430288 @ WADI AL SAFA 2ND, DUBAI - UAE
CLIENT CONSULTANT CONTRACTOR
AZIZ ALI MOHAMMAD HASAN CUBIC AUTO-BUILD CONT.
AL MARZOOQI ENGINEERING CONSULTANCY COMPANY

REF NO INSPECTION REQUEST DATE


AAQ/MEP/IR/EL-02 MEP 13-11-2022

Inspection
Activity Location Date* Time
Inspection for MEP Works in the slab
Ground Floor H/L 14/11/2022
for Attic Slab Area
attached Sketch/shop drawing attached method of statement material approval submittal

Contractor's undertaking
I UNDERTAKE FULL RESPONSIBILITY OF HAVING EXECUTED THE SUBJECT
WORK EXACTLY IN ACCORDANCE WITH THE LATEST APPROVED DRAWINGS,
SPECIFICATIONS AND METHOD STATEMENT

MEP Sub Contractor's sign & Main Contractor's Consultant's


stamp sign receipt

For consultant's use


Approved Approved Rejected
subject to comments
Comments

Checked Received
Consultant's Contractor's
sign & date sign & date
* Inspections requests must reach the consultant at least 24 hours in advance
1 2 3 4
1840
725 835 280

PLOT LIMIT PLOT PLOT PLOT

11 12 13 14 15 16 17 18
+0.85
INT. LVL.

AD-02
TEL.
A +1.00
F.F.LVL.
CU-TEL

SPEED HUMP
10
+0.70 +0.70
MS
DRIVEWAY LVL. DRIVEWAY LVL.

795
50% OF THE PAVING SPACE'S SHOULD 50% OF THE PAVING SPACE'S SHOULD
SPEED HUMP

HAVE SOLAR REFLECTANCE INDEX (SRI) HAVE SOLAR REFLECTANCE INDEX (SRI)
VALUE OF 29 OR ABOVE VALUE OF 29 OR ABOVE

09

MS

B
08
23 22 21
24
SPEED HUMP SPEED HUMP

440
+0.70
DRIVEWAY LVL.
20 19
07

CU-ELE
CU-GAR CU-W.MAN

C CU-GF 01
ALD-01

GARB. R. +0.85
+0.95
INT. LVL.
F.F.LVL.

280
06
AD-01

2865
MS

MS
D
+0.60 W.M W05
+0.65
INT. LVL.

DRIVEWAY LVL.

OPEN SPACE
05 GREEN
BICYCLE PARKING

LIFT LOBBY
+0.65
GR.F.LVL. AD-04

PUMP R. +0.65
INT. LVL.
SC +0.75
04 F.F.LVL.
10

11 09

810
12 08
SLOP 2 %

13 07

14 06
+0.60
15 05 AD-03
INT. LVL.
50% OF THE PAVING SPACE'S SHOULD 16 04 ELEC. WATER TANK
HAVE SOLAR REFLECTANCE INDEX (SRI) 17 03 +0.75
VALUE OF 29 OR ABOVE 18 02
S.S.L & F.F.L
19 01
30 STEPS X 15.83cm

20
3.5 %

03 +0.50
SCGR.F.LVL.

E
SLOP

SD-01

MS
+0.50
GR.F.LVL.
02 LOBBY
+0.65 TRANSFORMER GREEN
GR.F.LVL.
AREA :32.33 SQ/M LW01
F.F.C
RCC

GF-02
+0.45
S.S.L & F.F.L
540

GAS PIPES

01 ENTRANCE
+0.65
GR.F.LVL.
PROPOSED GATE LVL. +0.30
PROPOSED GATE LVL. +0.30
DMD GATE LVL. +31.62

Gate barrier
ATTIC SLAB

DMD GATE LVL. +31.62


SLOP : 3.5 %
SLOP : 8.2 %

ALD-02

F
PROPOSED GATE LVL. +0.35
DMD GATE LVL. +31.67

PLOT LIMIT PLOT


ENTRY/EXIT

PROPOSED UPSTAND KERBSTONE


*

01
02
03

NO.
Notes:-
SC

MS

MS

MS

DATE:
CAD BY :

DUBAI
CLIENT
SYMBOL

EMIRATES
Signature:
DATE

PROJECT

C215101
LEGEND:

REVISION:

00 10.11.2022

PROJECT NO.
CHECKED BY :
B
A

D
C

CONSULTANT

DRAWING TITLE
MEP CONTRACTOR
MAIN CONTRACTOR
Rejected

Abdul Gafoor

DUBAI
Eng. SWEED

10 Nov 2022

LOCATION
REVISED
DESCRIPTION

WADI AL SAFA 2ND,


Approved As Noted
ISSUED FOR APPROVAL

DWG. REF.NO.
CONSULTANT'S TABLE

Revise and Resubmit

PROPOSED DROP KERBSTONE

SIGN:
SIGN:
COMPANY

SCALE:
Approved As Submitted

Date:

AL MARZOOQI
SHOP DRAWING

AAQ/SD/GF/SM-01
PROPOSED G+4+R

3) Shop Drawings\9. Slab Marking\2. Slab Marking 05.11.2022


RESIDENTIAL BUILDING

AUTO-BUILD CONT.

PLOT NO.
NTS@A2

6430288
GROUND FLOOR PLAN H/L

Dwg. Ref G:\Abdul Gafoor System Files\2022\1) Job In Hand\5) G+4+R (Cubic)\
00
STATUS

SLAB MARKING DRAWING

REV.
AZIZ ALI MOHAMMAD HASAN
All Dimensions are in mm, Otherwise Indicated

You might also like