You are on page 1of 2

Success Checklist

As we move into the second part of the course, we will need to focus on different
activities to be successful on the course.
By now, I expect everyone to have Microsoft Project and Microsoft Visio installed
as we will not spend time during the class performing these activities. It was part
of Week 1 and I fully expect everyone in the class to have completed.
For the week of March 12th, these are the activities we will need to perform:

# Activity Note (Y/N)


Before the Class
1 Have Microsoft Project  This was requested on
installed in your computer and Week 1 and you can find
ready for the class. detailed instructions on
DC Connect Week 1
2 Have Microsoft VISIO installed  This was requested in
in your computer and ready for Week 1 and you can find
the class. detailed instructions on
DC Connect Week 1
During the Class
3 Explore Microsoft Project along  This will also set you up
with the Professor. for success in the
delivery of your first
assignment.
4 Explore Microsoft Visio along  This will also set you up
with the Professor. for success in the
delivery of your first
assignment.
5 Make sure you are able to  This will make sure that
locate all the activities required you don’t fall behind in
that are due before the end of your studies.
next class.
After the Class
6 Complete the activities on  As part of the course you
Week 9: Asynchronous are required to watch
Activities > Step 1: Visio these videos. For better
Introduction results download the
following 2 handouts to
accompany you through
the videos:
- Week 9: Asynchronous
Activities > Step 1: Visio>
Introduction HANDOUT
to accompany
Demonstration Videos

- Week 9: Asynchronous
Activities > Step 1: Visio>
VISIO FILE to accompany
the demonstration videos
7 Start the first VISIO assignment This is due on March 22nd and
Week 9: Asynchronous assignments will not be
Activities > Step 2: Visio accepted after this date.
Assignment
8 Start the first VISIO assignment This is due on March 22nd and
Week 9: Asynchronous assignments will not be
Activities > Step 3 MS Project accepted after this date.
Basics
9 Start the first VISIO assignment Extremely important activity,
Week 9: Asynchronous you need to do it as soon as
Activities > Step 4: Get setup to possible.
use LinkedIn Learning
10 Start the first VISIO assignment This is due on April 17, however
Week 9: Asynchronous it is a time consuming activity
Activities > Step 5: MS PROJECT and you need to start as soon
LinkedIn Certificate as possible.
11 Start the first VISIO assignment This is due on April 17, however
Week 9: Asynchronous it is a time consuming activity
Activities > Step 6: Visio and you need to start as soon
LinkedIn Certificate as possible.