Professional Documents
Culture Documents
Improve Control
Define Measure
Measure Analyze Design Verify
Measure
Input Output
ü Boundaries of the Project ü DPU and / or DPMO
ü Detailed definition of the ü ZST and ZLT
defect ü Control vs. Technology
ü Examination of benefits Plot
ü Team composition Measure ü Measurement System
ü Product Tree Analysis
ü Process Map
Control
ZShift
1,5
Control OK World
Technology to be class
improved 6S Area
good 00 3 6
poor ZST good
Technology
Mathematically
You have this
When you can: modeled
data type:
by this distribution
Classify Defectives (Attribute) Binomial
The type of data collected determines which Six Sigma instrument should be
applied to the project
Poor 3
Control (difference between short and long term capability)
1,5
Inaccuracy in the measurement system can alter the results of the process
Observed defects
Real defects
Real defects