Professional Documents
Culture Documents
Skema Jaringan DIR Ngulak B.nk.1 - B.nk.4-Model
Skema Jaringan DIR Ngulak B.nk.1 - B.nk.4-Model
A = 151.00 ha.
Q = 0.27 m3/dt.
D III Teknik Sipil
L = 409 m
Konsentrasi Bangunan Ai
A = 127.00 ha.
Q = 0.23 m3/dt.
B.Nk.3a
B.Nk.2
L = 2420 m
Kegiatan :
A = 24.00 ha.
Q = 39
L = 362 m
l/dt.
Perencanaan Irigasi
a.2 K a.1 Nk.3 Ka
B.Nk.3
Nk.3 Ki
Desa Ngulak B.Nk.1 - B.Nk.4
13.00 ha 15.00 l/dt 11.00 ha 15.00 l/dt 10.00 ha 15.00 l/dt 8.00 ha 15.00 l/dt
A = 109.00 ha.
Q = 0.20 m3/dt.
Kabupaten Musi Banyuasin
L = 350 m
B.Nk.4
Provinsi Sumatera Selatan
Nk.4 Ka Nk.4 Ki
10.00 ha 15.00 l/dt 6.00 ha 15.00 l/dt
A = 93.00 ha.
Q = 151 l/dt.
L = 500 m
Menyetujui/ Memeriksa
a.3 T.1 a.1
7.00 ha 18.00 l/dt 5.00 ha 15.00 l/dt Pembimbing I
a.2 A = 77.00 ha.
Q = 125 l/dt.
4.00 ha 15.00 l/dt
L = 470 m
a.4 T.2
5.00 ha 15.00 l/dt
A = 72.00 ha.
Q = 117 l/dt.
L = 80 m
b.4
T.5
8.00 ha 15.00 l/dt
A = 38.00 ha.
Q = 62 l/dt.
L = 181 m
LEGENDA:
A = 26.00 ha.
BANGUNAN BAGI SADAP K.1
Q = 42 l/dt.
L = 97 m
c.2 K.2 c.3
5.00 ha 15.00 l/dt 14.00 ha 15.00 l/dt Dr. Indrayani S.T., M.T.
BANGUNAN SADAP
c.1
A = 12.00 ha.
Q = 19 l/dt.
NIP : 197402101997022001
BOKS TERSIER 6.00 ha 15.00 l/dt L = 264 m