Professional Documents
Culture Documents
January , 2023
Contents
1. Introduction
§ Preparation of plans
plans
corridors.
central area.
§ Land uses
§ Building height
2. TOD and the Structure plan
ለቡ ቡልቡላ
ü Limiting traffic in the city core.
ወደ ሰበታ ሃና ማሪያም ቃሊቲ
lines
ወደ ቡራዮ መገናኛ ሲመሲ
አያት
ጦር ሀይሎቸ ለገሃር
ሰሚት
Ø LRT :- A total length of
አለም
ባንክ
አየር ጤና ጎተራ ቦሌ አራብሳ
34.25 Km
ቦሌ ኤርፖርት
ጀሞ
ወደ ሰበታ ሃና ማሪያም
connected with Sebeta –
ቃሊቲ
ኮዬ ፍቼ Legend
Meisso railway line. አቃቂ
BRT Route
Ø urban renewal
projects
Ø Integrating the centers LRT
Ø TOD approach
2. TOD and the Structure plan
§ Autobus Tera ,
§ Tor-hyloach,