T H E I S L A N D - VALIDATION TRACKER

02 - ARC - PODIUM & BASEMENT


IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS
ARC (01-ARC-34)
R1029-02-KCD-DWG-B02-ARC-1305-A
R1029-02-KCD-DWG-B02-ARC-1306-A
Proposed 600 x 600mm Antibacterial metal tile ceiling fixed on metal grid system
R1029-03-KCD-DWG-GFL-ARC-1321-A
Refer to Item Ref.- 5 of Architectural particular specification . R1029-01-KCD-SPC-ARC-00001) ARCH
R1029-03-KCD-DWG-GFL-ARC-1323-A
Basements & Specified 600 x 600mm lay-in grid ceiling type not in line with operator PARTICULAR SPECIFICATIONS, ADDITION TO
01 ARC HIGH COORDINATION & COST PROCEED OPERATOR R1029-03-KCD-DWG-GFL-ARC-1324-A LEVEL 3 CLOSED
Podium guidelines, it should be a washable type ceiling. NOTE: Item has been moved to General Tracker. Implementation is done under SECTION K40,
R1029-02-KCD-DWG-ALL-ARC-6110-A
Tracker Ref 01-ARC-34 REFER TO ITEM NO.05
R1029-02-KCD-DWG-B02-ARC-6102-A
R1029-02-KCD-DWG-B02-ARC-6103-A
R1029-02-KCD-DWG-B02-ARC-6104-A
R1029-02-KCD-DWG-B02-ARC-6106-A

ARC
Proposed 300 x 300mm antibacterial heavy duty anti-slip porcelain tiles, with epoxy
R1029-01-KCD-DWG-ALL-ARC-6000-B
grout filling. Skirting: Cove skirting with same finish as flooring. R1029-01-KCD-SPC-ARC-00001) ARCH
Specified PA.08 resin flooring is not in line with Operator guidelines. R1029-01-KCD-DWG-B01-ARC-6001-B
Basements & PARTICULAR SPECIFICATIONS, ADDENDUM TO
02 In accordanec to operator' s guideline, quarry tile, vinyly tile to be ARC HIGH COORDINATION & COST PROCEED OPERATOR R1029-01-KCD-DWG-B02-ARC-6002-B LEVEL 3 CLOSED
Podium NOTE: Item has been moved to General Tracker. Implementation is done under SECTION M40,
provided. Quarry tile shall be non-slip with epoxy grout R1029-01-KCD-DWG-B02-ARC-6003-B
Tracker Ref 01-ARC-34 REFER TO ITEM NO.12
R1029-01-KCD-DWG-GFL-ARC-6004-B
R1029-01-KCD-DWG-L01-ARC-6005-B

ARC
R1029-02-KCD-DWG-B02-ARC-1301-A
R1029-01-KCD-SPC-ARC-00001) ARCH
Ceiling type specified includes Glass wool insulation which is difficult to Refer to Item 01-ARC-150 R1029-02-KCD-DWG-B02-ARC-1303-A
Basements & PARTICULAR SPECIFICATIONS, ADDENDUM TO
03 paint/finish. Unhealthy in conditioned space. In addition it will give wavy Ceiling type CL-06 in the Basement-2 BOH Corridors has been replaced with CL-02 ARC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-B02-ARC-1304-A LEVEL 3 CLOSED
Podium SECTION P10,
appearance due to its low density. (P10:160D Mineral wool with cement board). R1029-02-KCD-DWG-B02-ARC-1305-A
REFER TO ITEM NO.11
R1029-02-KCD-DWG-B02-ARC-1306-A

Particular Specification for Ceiling Type 2 ( CL-02) to Mineral wool with Cement
R1029-01-KCD-SPC-ARC-00001) ARCH
Board.
Basements & Ceiling type -2 is proposed with insulation which is difficult to paint/finish. ARC PARTICULAR SPECIFICATIONS, ADDENDUM TO
04 ARC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN LEVEL 1 CLOSED
Podium In addition it will give uneven appearance due to its low density R1029-01-KCD-DWG-ALL-ARC-6507 SECTION P10,
Construction Detail has been updated to reflect the accurate insulation reference
REFER TO ITEM NO.11
code with relevant Particular Specifications.

GA OVERALL PLANS
R1029-02-KCD-DWG-B01-ARC-1210 TO 1230
GA PART PLANS
R1029-02-KCD-DWG-B01-ARC-1211-TO-1236
Carpark finish have been indicated in the drawings according to the following:
Basements & FINISHES SCHEDULE
05 Carpark finishes are missing from the schedule/drawings. 1. GA drawings tagged for reference ARC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
Podium R1029-01-KCD-DWG-ALL-ARC-6000-B
2. Finishes schedule updated for CAR park finishes
R1029-01-KCD-DWG-B01-ARC-6001-B
R1029-01-KCD-DWG-B02-ARC-6003-B
R1029-01-KCD-DWG-GFL-ARC-6004-B
R1029-01-KCD-DWG-L01-ARC-6005-B

Security rating have been provided for all the fixed bollards. Security have provided
additional details for the bollards fixed for the slab on grade.
ARC
Discrpency between the bollards Details provided in landscape package, Architecture package have been updated as per security details & Provided the finish Refer to specification of "Security Package" for
06 Basement-2 ARC, SEC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-6575 LEVEL 3 CLOSED
Architectural Package & Security Package. for the removable & BOH bollards. Fix Type of Bollard

Landscape details have been updated to match the security details & provided the
finish for the bollards on the arrival drive & hotel drop offs.

Total m2 required
ARC
R1029-01-KCD-DWG-ALL-ARC-6622_A
R1029-01-KCD-DWG-ALL-ARC-6621_A
R1029-01-KCD-DWG-ALL-ARC-6620_A
R1029-01-KCD-DWG-ALL-ARC-6619_A
R1029-01-KCD-DWG-ALL-ARC-6618_A
R1029-01-KCD-DWG-ALL-ARC-6599_A
R1029-01-KCD-DWG-ALL-ARC-6596_A
The following systems of waterprofing have been proposed: R1029-01-KCD-DWG-ALL-ARC-6592_A
1- 2 Layer SBS for Tanking R1029-01-KCD-DWG-ALL-ARC-6567_A
Basements & Correction of waterproofing specs for external areas, roofs and landscape 2-2 Layer SBS Anti root for Soft Landscape R1029-01-KCD-DWG-ALL-ARC-6566_A
MEDIUM COORDINATION & COST
Podium areas. The current details are not technically acceptable. 3- Single Layer SBS for the roofs & terrraces R1029-01-KCD-DWG-ALL-ARC-6565_A
4-Polymer modified Cementitious waterproofing for internal wet areas. R1029-01-KCD-DWG-ALL-ARC-6562_A
R1029-01-KCD-DWG-ALL-ARC-6552_A
R1029-01-KCD-DWG-ALL-ARC-6549_A
R1029-01-KCD-SPC-ARC-00001) ARCH
R1029-01-KCD-DWG-ALL-ARC-6542_A
PARTICULAR SPECIFICATIONS, ADDENDUM TO
08 ARC, LA PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-6534_A LEVEL 3 CLOSED
SECTION J30, J31, J42
R1029-01-KCD-DWG-ALL-ARC-6530_A
REFER TO ITEM NO. 03 & 04
R1029-01-KCD-DWG-ALL-ARC-6529_A
R1029-01-KCD-DWG-ALL-ARC-6528_A
R1029-01-KCD-DWG-ALL-ARC-6525_A
R1029-01-KCD-DWG-ALL-ARC-6519_A
R1029-01-KCD-DWG-ALL-ARC-6523_A
R1029-01-KCD-DWG-ALL-ARC-6521_A;
Waterproofing of ramps have been specified as: R1029-01-KCD-DWG-ALL-ARC-6520_A
R1029-01-KCD-DWG-ALL-ARC-6518_A
Basements & J31: One layer, 5mm thick reinforced SBSmodified bitumen sheet membrane (1st R1029-01-KCD-DWG-ALL-ARC-6510_A
Waterproofing missing in the Main ramps area MEDIUM COORDINATION & COST R1029-01-KCD-DWG-ALL-ARC-6507_A
Podium layer) an
one-layer, 5mm thick reinforced SBS-modified R1029-15-KCD-DWG-ALL-ARC-6501-A
with mineral granulates surface (2nd layer) R1029-15-KCD-DWG-ALL-ARC-6502-A
R1029-15-KCD-DWG-ALL-ARC-6503-B
R1029-15-KCD-DWG-ALL-ARC-6551-B
R1029-15-KCD-DWG-ALL-ARC-6552-B

Drawing showing the revised detail of the curtain wall has been provided by AESG on
Curtain walling broken glass cannot be removed or drained. sheet R1029-AESG-DWG-ALL-FAC-1002 Rev. D that answers the concern of
Basements & maintennce and replacement in the event of glass breakage. Cap has been kept to FAC
09 FAÇ COORDINATION TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
Podium Frame to be exposed at head and base as agreed with wasl. Minimise cap minimum dimension. R1029-AESG-DWG-ALL-FAC-1002
vaiability.
The issue is implented under General Tracker as 01-FAC-10

Page 2 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

Retail F&B Main


Highlighted area is a curtain wall envelope as verified from the model.
Lobby @ Ground - Highlighted area is modelled as curtainwalling and should be changed to
10 N/A MEDIUM COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
ALL shopfront
No Further Action Required
SHOPFRONTS.

Retail F&B Main Note:


Curtain walling is indicated internally within the retail spine. This should be ARC
Lobby @ Ground - Glass and frame is tagged and specified in the ID drawings and specs.
12 single glazed shopfront as specified within the ID package (Central ARC, ID COORDINATION PROCEED TECHNICAL DESIGN R1029-03-KCD-DWG-GFL-ARC-1220-C NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
ALL The shopfront may not priced or included in the BOQ or provisional sum.
Entertainment package). R1029-03-KCD-DWG-GFL-ARC-1226-C
SHOPFRONTS. Dezire to confirm. Revit model has been updated to reflect the correct shop front
representation on plan

HIGH
MGM-2 SUBSTATION-1 & LV-1
Attic slab has been raised by 160mm to achieve a clear height 3660mm inside the
The clear height provided for the substation is 3500mm which is not
substation.
MGM2 complying with DEWA Requirements. ARC
15 n/a ARC COORDINATION & COST PROCEED AUTHORITY NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
Substation-1 R1029-02-KCD-DWG-B01-ARC-1210
The Main slab has been raised from 1600mm to 1960mm to increase the attic void
The void between Attic slab and main slab is 550mm which is not R1029-02-KCD-DWG-B01-ARC-1216
from 550mm to 700mm.
complying is with DEWA Regulation. Required depth is 600mm min. R1029-02-KCD-DWG-B02-ARC-4322

HIGH

ARC
MGM-2 SUBSTATION-2 & LV-2
Main slab has been raised from +2.550 to +2.700 to increase the attic void from 550 R1029-02-KCD-DWG-B02-ARC-1200
The void between Attic slab and main slab is 550mm which is not
to 700mm. R1029-02-KCD-DWG-B02-ARC-1206
MGM2 complying is with DEWA Regulation. Required depth is 600mm min.
16 ARC HIGH COORDINATION & COST PROCEED AUTHORITY R1029-02-KCD-DWG-B02-ARC-4327 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
Substation-2
The FFL of the LV Room & Adajcent corridor has been raised from -3.200 to -3.050 to R1029-02-KCD-DWG-B02-ARC-4354
The trench depth for the LV Room is 800mm which is not complying with
increase the Trench void from 800mm to 950mm.
the regulations. Required depth is 950mm min.

BASEMENT-2
100mm THK. Blockwork Type-IWT-03 and plaster in front of concrete wall added to
GENERAL R1029-02-KCD-DWG-B02-ARC-1405
17 Running of MEP services through RCC wall. rum MEP services from ceiling to sanitryware ARC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
ARRANGEMENT R1029-02-KCD-DWG-B02-ARC-1406
PLAN R1029-02-KCD-DWG-B02-ARC-6113

R1029-02-KCD-DWG-B02-ARC-1200_B
BASEMENT-2 Total m2 required R1029-02-KCD-DWG-B02-ARC-1203_A
At bends it will not possible for two buggies to pass simultaniously as At these locations two way parking mirrors are recommendable
GENERAL R1029-02-KCD-DWG-B02-ARC-1204_A
18 there is insufficient width of corridor. 7 NOS Polycarbonate reflective convex wall mounted mirrors are added ARC, TIS LOW COORDINATION & COST PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
ARRANGEMENT R1029-02-KCD-DWG-B02-ARC-1205_B
PLAN R1029-02-KCD-DWG-B02-ARC-1206_B
R1029-01-KCD-DWG-ALL-ARC-6573-A

BASEMENT-2
In accordance to Schematic report, highlighted lifts are Buggy lifts which Lifts are not buggy lifts.
GENERAL
19 have not been detailed out in DD. In case these lifts are buggy lifts, the Refer to item-06 in VT tracker. ARC, VTP, MEP LOW N/A N/A N/A N/A LEVEL 1 CLOSED
ARRANGEMENT
shaft sizes to be increased. No action required.
PLAN

R1029-01-KCD-DWG-ALL-ARC-6157
1-Sanitry Set R1029-01-KCD-DWG-B02-ARC-6002
Discripency in the Finshing schedule and Tile Layout smaller tile
Details Modifications are made in Finishes Legend. R1029-01-KCD-DWG-B02-ARC-6001
1. Floor tile (CT.01) Layout shows 300 x 300mm tiles 330x330 to be
20 CT.01 seze have been revised to 300mm x 300mm Porcelain tiles-BOH ARC LOW COORDINATION TECHNICAL DESIGN R1029-01-KCD-DWG-B02-ARC-6003 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
2. Finishes Legend shows (CT.01) 300 x 600mm Ceramic Tiles used on floor as
2-FINISHES R1029-01-KCD-DWG-B02-ARC-6004
3. Specs shows CT.01 as 300 x 300mm Porcelain Tiles well
SCHEDULE R1029-01-KCD-DWG-B02-ARC-6005

Staff Shower
R1029-01-KCD-SPC-ARC-00001) ARCH
Areas @ B2-Level L- Shape trim at
Floor recessed missing in the shower area Tile Trim L shape (Upper L with edge)powder coated Aluminum Tile edging Tile trim, R1029-01-KCD-DWG-ALL-ARC-6157 PARTICULAR SPECIFICATIONS, ADDENDUM TO
21 ARC LOW threshold with TECHNICAL DESIGN LEVEL 3 CLOSED
12mm height. Color to match with adjacent floor tile as per Engineer approval R1029-01-KCD-DWG-ALL-ARC-6525 SECTION P20
Sanitry Set slope to drain.
REFER TO ITEM NO. 41
Details

Page 3 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

R1029-01-KCD-DWG-ALL-ARC-6116
Typical Security Proceed with
22 Threshold Missing in all Security Rooms Thershold have been provided for all the toilets inside the security rooms ARC LOW COORDINATION & COST TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-6117 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
Booth threshold.
R1029-01-KCD-DWG-ALL-ARC-6525

Power point exist under MGM componenet.


Administrative Refer to Electrical Drawing:
23 Offices @ Missing Power point layout in accordance to Furniture Layout R1029-08-CKR-DWG-B01-ELP-1199-PDF [J] ARC, ELE MEDIUM COORDINATION & COST N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
B1,LOO, L01
No Further action required

Typical Comment
R1029-15-KCD-DWG-ALL-ARC-6501
Drainage cell are required under softlandscape to improve the growth of
R1029-15-KCD-DWG-ALL-ARC-6502 R1029-01-KCD-SPC-ARC-00001) ARCH
plants.
External R1029-15-KCD-DWG-ALL-ARC-6503 PARTICULAR SPECIFICATIONS, ADDENDUM TO
24 In current design, drainage cell have also provided under the Hardscape Drainage cell under hardscape area is deleted. ARC, STR, LA MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN LEVEL 3 CLOSED
landscape R1029-15-KCD-DWG-ALL-ARC-6551 SECTION J31,
which technically is not required. Therefore it is recommended to remove
R1029-15-KCD-DWG-ALL-ARC-6552 REFER TO ITEM NO. 03
the drainage cell under Hardscape which will be cost saving to the project.
R1029-15-KCD-DWG-ALL-ARC-6553

R1029-15-KCD-DWG-ALL-ARC-6501
R1029-15-KCD-DWG-ALL-ARC-6502
Typical Comment
External Screed for slope in planter boxes added for all planter as per Landscape Consultant R1029-15-KCD-DWG-ALL-ARC-6503
25 ARC, STR, LA MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
landscape Typical Detail. R1029-15-KCD-DWG-ALL-ARC-6551
Screed for slope in planter boxes are missing.
R1029-15-KCD-DWG-ALL-ARC-6552
R1029-15-KCD-DWG-ALL-ARC-6553

Overall There are trenches defined in the basement level-2 for 11kV cabling
Substation and which may not be acceptable to DEWA.
27 IBA confirmed there will be no objection from DEWA. Item has been closed. ELE HIGH COORDINATION & COST N/A AUTHORITY N/A N/A LEVEL 3 CLOSED
11KV Reticulation Trenches Structural drawings to be revised once DEWA final approval has
Layout been obtained.

R1029-01-KCD-DWG-ALL-ARC-6640 R1029-01-KCD-SPC-ARC-00001) ARCH


Waterproofing system and detail for retaining wall and under raft/pile Specification are revised from HDPE to two layer water proofing system. R1029-01-KCD-DWG-ALL-ARC-6641 PARTICULAR SPECIFICATIONS, ADDENDUM TO
25A External Works ARC, STR MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN LEVEL 1 CLOSED
caps need to be revised per KC specification. Additional Details are provided accordingly. R1029-01-KCD-DWG-ALL-ARC-6642 SECTION J31,
R1029-01-KCD-DWG-ALL-ARC-6643 REFER TO ITEM NO. 03

R1029-02-KCD-DWG-B02-ARC-4301;
Total m2 required R1029-02-KCD-DWG-B02-ARC-4302
R1029-02-KCD-DWG-B02-ARC-4305;
R1029-02-KCD-DWG-B02-ARC-4306;
1. . For all LV rooms- LV trench height are not complying with DEWA R1029-02-KCD-DWG-B02-ARC-4307;
Regulation of 950mm. R1029-02-KCD-DWG-B02-ARC-4309;
LV ROOMS @ Floor Level of all LV rooms shall be increased to achieve the 950mm trench height as R1029-02-KCD-DWG-B02-ARC-4312;
28 2. External Road level and LV rooms are at same level which will cause ARC, MEP HIGH COORDINATION & COST PROCEED AUTHORITY NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
Basements per DEWA regulation. R1029-02-KCD-DWG-B02-ARC-4313;
spillage of water inside LV room/trenches.
R1029-02-KCD-DWG-B02-ARC-4316;
R1029-02-KCD-DWG-B02-ARC-4319;
R1029-02-KCD-DWG-B02-ARC-4322;
R1029-02-KCD-DWG-B02-ARC-4327;

Blind spot at traffic crossing between MGM Entry ramp and Bellagio exit
R1029-03-KCD-DWG-L01-ARC-1232
29 Parking @ Lev-01 ramp Polycarbonate reflective convex wall mounted mirror added ARC LOW COORDINATION & COST PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
R1029-01-KCD-DWG-ALL-ARC-6573

31 Hand wash for staff dining not considered ARC, KWL MEDIUM COORDINATION & COST NOT REQUIRED TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED

The proposed locations are near to dirty tray drop off.


The proposal sent to Wasl for approval

The discripency is discussed with Wasl and operator and operator confirmed this
As per tender documents there are seven number parking bays shown for R1029-02-KCD-DWG-B02-ARC-1200_B
34 B02 modification of reducing the parking bays from seven number to two number. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
Staff buses, while the model shown two number parking for Staff. R1029-02-KCD-DWG-B02-ARC-1203_B

Page 4 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

R1029-03-KCD-DWG-GFL-ARC-4381
Cement Particle board blanket panel is removed in front of Louvers to resove
K10 Cement Particle Blanket Panel is provided to cover the Geneator R1029-03-KCD-DWG-GFL-ARC-4382
35 A-4300 Series Generator operational issue. ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
Louvers which can cause operational issue to Generator. R1029-03-KCD-DWG-GFL-ARC-4383
R1029-03-KCD-DWG-GFL-ARC-4390

BSMT & POD:


The K13 Cement particle board lining needs to be replaced with the Perforated Alumimium R1029-03-KCD-DWG-GFL-ARC-4381
panels with insulation backing. Refer Arch spec reference 170A page 105 to 107 for material R1029-03-KCD-DWG-GFL-ARC-4382
The current drawings for generator room wall lining shows K13 Cement Particle specifacation. The same needs to be changed in the drawings. R1029-03-KCD-DWG-GFL-ARC-4383
36 A-4300 Series Architectural MEDIUM COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
board with insulation backing which is incorrect. R1029-03-KCD-DWG-GFL-ARC-4390
The implementation done under
Tag Reference : 01-ACU-14 The implementation done under
Tag Reference : 01-ACU-14

R1029-02-KCD-DWG-B01-ARC-1210_Z
1. Centrifugal fans converted to axial fans.
R1029-02-KCD-DWG-B01-ARC-1212_X
2.Increasing No. of fans. R1029-03-KCD-DWG-GFL-ARC-1220_AD
3.Fan rooms shall be provided with proper acous c treatment due to using axial fan. R1029-03-KCD-DWG-GFL-ARC-1222_Z
- Ll Plantroom absorption onto slab/soffit and available walls shall be equivalent to R1029-03-KCD-DWG-L01-ARC-1232_X
50mm thick black woven mat faced glass wool insulation with perforated aluminum R1029-02-KCD-DWG-ALL-ARC-4453_C
R1029-02-KCD-DWG-ALL-ARC-4454_D For Architecture:
sheet facing having nominal 22% open areas. Alternatively, 50mm thick polyester
Current specfied Fans - Centrifugal fans need Fan room sizes to be R1029-02-KCD-DWG-ALL-ARC-4455_D Refer to item-24 of Particular specification (
B2, B1,L00, L01, panel having NRC 0.85 shall be installed. R1029-02-KCD-DWG-ALL-ARC-4456_C
37 N/A increased. This increase in size of rooms and relocation of shaft are ARCH/MEP MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN Material Update LEVEL 3 CLOSED
L02 - Adequate sound attenuators for Air terminals R1029-02-KCD-DWG-ALL-ARC-4459_C
causing to lose 29 nos parking spaces which is unacceptable to Client Clause No: 170A Acoustic Panel Lining to MEP
- Acoustic Louvers where required R1029-02-KCD-DWG-ALL-ARC-4460_C
R1029-02-KCD-DWG-ALL-ARC-4461_D Plant rooms.)
- Fans Vibration isolation
- Doors to be min. RW 35db R1029-02-KCD-DWG-ALL-ARC-4462_D
R1029-02-KCD-DWG-ALL-ARC-4464_D

NOTE: This item is implemented under MEP Tracker No : 02-VAC-19 NOTE: This item is implemented under MEP Tracker
No : 02-VAC-19

Drawings are updated in coordination with kitchen Drawings R1029-02-KCD-DWG-B02-ARC-1200


38 B02 Kitchen equipment is clashing with Architectural wall Architectural LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-B02-ARC-1205 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-02-KCD-DWG-B02-ARC-6103

R1029-02-KCD-DWG-B02-ARC-1200
39 B02 Kitchen equipment is clashing with Architectural wall ARCH. LAYOUT updated to suite the Equipment Layout Architectural LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-B02-ARC-1205 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-02-KCD-DWG-B02-ARC-6103

Total m2 required

R1029-02-KCD-DWG-B01-ARC-1210
40 B01 Wall termination and room permiters are not clear Visibitly issue in Model is resolved. Architectural LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-02-KCD-DWG-B01-ARC-1213
R1029-02-KCD-DWG-B01-ARC-4363

R1029-02-KCD-DWG-B01-ARC-1210
41 B01 Wall Missing in the GA layout Visibitly issue in Model is resolved. Architectural LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-02-KCD-DWG-B01-ARC-1216

R1029-02-KCD-DWG-B01-ARC-1210_AA
42 B01 Walls are not aligned showing rooms are not properly closed. Walls are aligned to the adjacent wall. Architectural LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-02-KCD-DWG-B01-ARC-1216_AA

R1029-03-BSB-DWG-GFL-ARC-1220_AA
43 GF Shaft wall termination is incomplete. Drawing is updated to fix the graphoical issue in the model. Architectural LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-03-BSB-DWG-GFL-ARC-1221_AA

Page 5 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

R1029-03-KCD-DWG-GFL-ARC-1220
44 GF Wall is not visible in the plan Drawing is updated to fix the graphoical issue in the model. Architectural LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-03-KCD-DWG-GFL-ARC-1222

ARC
R1029-02-KCD-DWG-B02-ARC-1200_AA
New Bellagio IDF has been introduced @ B2 by reducing the the size of GSM room for R1029-02-KCD-DWG-B02-ARC-1204_R
IDF room of Bellagio Hotel in B2-level having space constraint as the room is Security Racks. R1029-02-KCD-DWG-B02-ARC-1304_D
45 Basement-2 ARC l SEC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
being used for both ICT and Security Racks. Smartworld have no objection in reducing the size of GSM room.
Note: The comment is implemented under Tracker no: 02-SEC-16 SEC
Note: The comment is implemented under Tracker no:
02-SEC-16

R1029-02-KCD-DWG-B02-ARC-1200-C
R1029-02-KCD-DWG-B02-ARC-1202-B
The following guard rooms is designed with rack sizes of 650 x 650,The room R1029-03-KCD-DWG-GFL-ARC-1220-C
sizes are required to increase to accommodate the rack szes of 850 X 850mm. R1029-03-KCD-DWG-GFL-ARC-1227-A
1. GR.OG.02 (Arrival Drive) Cavity wall around the security rack to be removed to accommodate the 800 x 800 Rack.
GA Plnas & Detail R1029-01-KCD-DWG-ALL-ARC-6116-B
46 2. GR.OG.03 (Arrival Drive) ARC, SEC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
Plans 3. TC.OG.01 (Tennis Court) Note: The comment is implemented under Tracker no: 02-SEC-17
R1029-01-KCD-DWG-ALL-ARC-6117-B
R1029-02-KCD-DWG-B02-ARC-1302-A

Note: The comment is implemented under Tracker no:


02-SEC-17

47 L01 Unneccesary wall protruding within the room Drawing is updated to fix the graphoical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-03-BSB-DWG-L01-ARC-1230_AA NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

48 L01 Wall termination and room permiters are not clear Drawing is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-03-BSB-DWG-L01-ARC-1230_AA NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Specs are corrected mentioning the Fire rating is required as per Project requirement.
In FLS legend the walls fire ratings are maximum of 2hrs but on
50 B02-L03 ARC, FLS LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
specifications the wall fire ratings area maximum of 4hrs.
No Action is required.

Total m2 required

On detailed review it is noted that Wall Type Legend shows the Thickness of wall as
well.
51 B02-L03 There is no dimensions on wall thickness ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
No Action is required.

Drawing Series A-6112-Detailed Plans show MEP fixtures on drawings.


MEP fixtures are not refelected in the RCP drawing.R1029-03-BSB-DWG-
52 B02-L03 ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
L01-ARC-1306
No Action is required

Details are already available in Drawing no. R1029-02-BSB-02-ARC-6109.


Level tags, material specs and MEP fixures are not reflected in the RCP
53 B02-L03 ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
drawing :R1029-03-BSB-DWG-L01-ARC-1303
No action is required

54 B02-L03 Door accoustic in schedules are not matching with accoustic report Door schedule is being comletely revised. ARC, FLS LOW COORDINATION PROCEED TECHNICAL DESIGN DOOR SCHEDULE NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Page 6 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

There is a discripency notied between the PDF tender drawing and The drawing no: R1029-01-BSB-DWG-ALL-ARC-2001 is represented from latest Model.
55 Model . The subject area is marked on image of Elevation 1 of R1029-01- No any further modification is required. ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
BSB-DWG-ALL-ARC-2001.

The lines showing the edge of the curves on the façade .


56 There are lines on different areas of façade ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
No action is required

R1029-02-KCD-DWG-B01-ARC-1210-C
Electrical Room size is increased . R1029-02-KCD-DWG-B01-ARC-1212-B
57 B01, L01 As per Electrical requirement, the Electical Room size are increased. ARC, ELE LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
Note: The comment is implemented under Tracker no: 02-ELE-34 R1029-03-KCD-DWG-L01-ARC-1230-C
R1029-03-KCD-DWG-L01-ARC-1232-B

58 Floating Walls Drawings is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-3001 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

59 Floating Floor Drawings is updated to show the supporting structure to the ramp in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-3001 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

60 Access ladder height should be adjusted The ladder hight is fixed in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-3001 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Total m2 required

This a graphical representation which appears in high scale exports such as this
sections (scale 1:500), Line weight will be thick accordingly.
62 Line is too thick ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED

No arction required

63 Ramp should be hidden in this view Drawing is updated to reflect the correct section information. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-3001 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

64 Floating Walls Drawing is updated to reflect the correct section information. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-3001 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

65 Floating Wall Drawing is updated to reflect the correct section information. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-3001 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Page 7 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

66 Overlapping between floors and walls Drawings is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-3001 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

The space is an extract plenum ER-05


67 Missing Wall ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
No wall is required

68 The walls are penetrating to the lower floor levels. Drawings is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4001 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Floating Structural Column and Walls shown in section: R1029-01-BSB-


69 Drawings is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4001 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
DWG-ALL-ARC-4001

70 Several clashes between architecture and structure are identified. Drawings is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4001 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

71 Floating walls visible in section : R1029-01-BSB-DWG-ALL-ARC-4002_H Drawings is updated to fix the modeling issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4002 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

72 Overlapping wall and floor: R1029-01-BSB-DWG-ALL-ARC-4002_H Drawings is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4002 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Total m2 required

Model is updates to show the actual visibity of beam in the Section.


73 Floating object need to be check structural design ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4002 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

74 Walls are clashing Drawings is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4002 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Updated in the model/drawings:


75 Floating slab ARC LOW COORDINATION N/A TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4002 N/A LEVEL 1 CLOSED
Strucural dropped panel is attached to the slab.

76 Structural slab not visible in section. Drawing is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4003 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Page 8 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

Model is updated to fix the graphical issue in the drawing


77 Clashes between architectural and structure drawings. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4003 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

The space is an extract plenum ER-14


78 Missing wall ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
No wall is required

79 Structural slab not visible in section. Drawings is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4006 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

80 Floating object Drawings is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4007 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

1. structural beam is not visible 1. Drawings is updated to fix the graphical issue in the model.
81 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4057 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
2. Duplicated beam is visible in section. 2. Drawing is updated to fix the graphical issue.

82 Stair base must be revised Drawings is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4061 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Total m2 required

Cross references updated. Details are available in DWG: R1029-05-AESG-L02-FAC-


83 Missing curtain wall ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4063 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
2001

84 Unneccesary lines are visible in ceiling. Visibilty issue in Model resolved ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4066 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

85 Floating wall in section. Drawings is updated to fix the graphical issue in the model. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4067 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

86 Detail & tag are not matching Wrong tag have been removed from the Podium wall section DWG 4003. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4003 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Page 9 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

DETAIL SECTIONS
R1029-01-KCD-DWG-ALL-ARC-4052
R1029-01-KCD-DWG-ALL-ARC-4053
Reference detail number has been corrected to 6A/6505 in Drawing refernce R1029-
87 Refernce detail no. is incorrect. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4055 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
01-BSB-DWG-ALL-ARC-4052_A
R1029-01-KCD-DWG-ALL-ARC-4060
R1029-01-KCD-DWG-ALL-ARC-4065
R1029-01-KCD-DWG-ALL-ARC-4068

Drawing reference and detail refence have been found consistant.


88 Detail & tag are not matching ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
No further action required

DETAIL SECTIONS
R1029-01-KCD-DWG-ALL-ARC-4051
R1029-01-KCD-DWG-ALL-ARC-4053
New detail is developed and added to the additional sheet 6644 with detail refernce R1029-01-KCD-DWG-ALL-ARC-4055
89 Refernce detail no. is incorrect. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
01/6644 R1029-01-KCD-DWG-ALL-ARC-4061

CONSTRUCTION DETAILS
R1029-01-KCD-DWG-ALL-ARC-6644

Drawing reference and detail refence have been found consistant.


90 Detail & tag are not matching ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
No further action required

Call out reference of Detail is changed to 8/6505 in drawing reference R1029-01-BSB-


91 Detail & tag are not matching ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4053 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
DWG-ALL-ARC-4053_A

Call out reference of Detail is changed to 01/6644 in drawing reference R1029-01-BSB-


92 Detail & tag are not matching ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4053_A NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
DWG-ALL-ARC-4053_A

Total m2 required R1029-01-KCD-DWG-ALL-ARC-4055_A


93 Detail & tag are not matching New detail is developed with Call out 02/6644 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-KCD-DWG-ALL-ARC-6644_A

94 Fire hose cabinet is missing Drawing is updated to show the Fire Hose Cabinet ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4055 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

R1029-01-KCD-DWG-ALL-ARC-4056_B
95 Detail & tag are not matching New detail is developed with Call out 03/6644 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-KCD-DWG-ALL-ARC-6644_A

96 Detail & tag are not matching Both are found matching. No implementation is required. ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED

R1029-01-BSB-DWG-ALL-ARC-4057_A
97 Detail & tag are not matching New Tag number 04/6644 and detail is developed as per location. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-BSB-DWG-ALL-ARC-6644_A

Page 10 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

98 Detail & tag are not matching Both are found matching. No implementation is required. ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED

R1029-01-KCD-DWG-ALL-ARC-4058_B
99 Detail & tag are not matching New detail is developed with Call out 05/6644 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-KCD-DWG-ALL-ARC-6644_A

R1029-01-BSB-DWG-ALL-ARC-4059_A
100 Detail & tag are not matching New detail is developed with Call out 05/6543 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-BSB-DWG-ALL-ARC-6543_A

The call out refer to the Screed. The same is shown in detail. Therefore no
101 Detail & tag are not matching ARC LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
amendment is required.

GA Plans are indicating planters not Bollards.


102 Bollard is missing ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-BSB-DWG-ALL-ARC-4060_B NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
The drawing R1029-01-KCD-DWG-ALL-ARC-4060-B is revised to match the Plans.

R1029-01-BSB-DWG-ALL-ARC-4060_B
103 Detail & tag are not matching The Call out is corrected as 1/6505 which is consistent with refernce detail. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Total m2 required The Call out is corrected from 2/6575 to 2A/6575 which is consistant with reference
104 Detail & tag are not matching ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-BSB-DWG-ALL-ARC-4060_B NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
detail now.

Detail & tag are not matching


Call out is refering to the SS wall protection which is matching to the reference detail.
105 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
Thererfore no amendments is required.
R1029-01-BSB-DWG-ALL-ARC-4060_B

R1029-01-KCD-DWG-ALL-ARC-4060
106 Detail & tag are not matching New detail is developed with call out 10/6541 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-KCD-DWG-ALL-ARC-6541

R1029-01-KCD-DWG-ALL-ARC-4061
107 Detail & tag are not matching New details is developed with call out 06/6644 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-KCD-DWG-ALL-ARC-6644

R1029-01-BSB-DWG-ALL-ARC-4061
108 Detail & tag are not matching New details is developed with call out 11/6549 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-BSB-DWG-ALL-ARC-6549

Page 11 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

Detail & tag are not matching The detail is to provide the technical information, refer to scoping plans for the
109 R1029-01-BSB-DWG-ALL-ARC-4062_B profile of the cladding. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
R1029-01-BSB-DWG-ALL-ARC-6542_A no amendment is required.

New detail is developed with Call-out 10A/6576 and drawings are updated R1029-01-KCD-DWG-ALL-ARC-4062_A
110 Detail & tag are not matching ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
accordingly. R1029-01-KCD-DWG-ALL-ARC-6576_A

111 Detail & tag are not matching The call out reference has been corrected to 8/6561. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4064_B NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

112 Detail & tag are not matching Both are found matching. No implementation is required. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED

To revise the specification and


Change the Area of use as mentioned below:
1.CL-01 insula on ( Closed Cell phenolic board ) is specified within Ceiling Plenum (
ARC
It is noted that CL-01 insulation ( Closed Cell phenolic board ) is specified spec Ref. P10: 160D) R1029-01-KCD-SPC-ARC-00001) ARCH
R1029-03-KCD-DWG-GFL-ARC-1322-B
for Exposed BOH area and CL-02 insulation (Rigid foil faced Mineral Fibre) 2.CL-02 insula on ( Rigid Foil Faced Mineral Fibre) with Cement board covering is PARTICULAR SPECIFICATIONS, ADDENDUM TO
113 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-03-KCD-DWG-GFL-ARC-1323-B LEVEL 3 CLOSED
is specified within Ceiling Plenum. Using of Mineral Fibre within ceiling specified for Exposed BOH and Carparking areas.( spec Ref. P10: 160E) SECTION P10,
R1029-03-KCD-DWG-GFL-ARC-1325-B
void is not recommended due to unhealthy nature of the material REFER TO ITEM NO.11
R1029-03-KCD-DWG-GFL-ARC-1326-B
Several Areas in GFL where provided with CL02 insulation (Mineral fiber) that have
been revised to CL-01 insulation (Phenolic Board) to comply with Air quality
requirements.

Total m2 required

114 Detail & tag are not matching Both are found matching. No implementation is required. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED

R1029-01-BSB-DWG-ALL-ARC-4064_B
115 Detail & tag are not matching New details is developed with call out 4/6551 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-BSB-DWG-ALL-ARC-6551_A

Detail & tag are not matching


116 R1029-01-BSB-DWG-ALL-ARC-4064_B Both are found matching. No implementation is required. ARC LOW COORDINATION PROCEED TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
R1029-01-BSB-DWG-ALL-ARC-6533_H

R1029-01-KCD-DWG-ALL-ARC-4064
Detail & tag are not matching
The call out reference is corrected has been 05/6532 in drawing no: R1029-01-KCD- R1029-02-KCD-DWG-B02-ARC-4336
117 R1029-01-BSB-DWG-ALL-ARC-4064_B ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
DWG-ALL-ARC-4064 R1029-01-KCD-DWG-ALL-ARC-6532
R1029-01-BSB-DWG-ALL-ARC-6532_K

Page 12 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

New detail with Call out 15A/6521 is developed and accordingly the drawings have R1029-01-KCD-DWG-ALL-ARC-4065_A
118 Detail & tag are not matching ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
been updated R1029-01-KCD-DWG-ALL-ARC-6521_A

Detail call out is correct, Section Drawings has been updated to fix the graphical issue
119 Detail & tag are not matching ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4065_A NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
in the model.

The call out reference has been corrected to 05/6575 in drawing no: R1029-01-KCD-
120 Detail & tag are not matching ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4065_A NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
DWG-ALL-ARC-4065

R1029-01-BSB-DWG-ALL-ARC-4066_A
121 Detail & tag are not matching New details is developed with call out 9/6560 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-KCD-DWG-ALL-ARC-6560_A

R1029-01-KCD-DWG-ALL-ARC-4067_A
122 Detail & tag are not matching New details is developed with call out 07/6644 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-KCD-DWG-ALL-ARC-6644_A

The call out reference is corrected as11A/6575 & 11B/6575 in drawing no: R1029-01-
123 Detail & tag are not matching ARC LOW COORDINATION PROCEED TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
KCD-DWG-ALL-ARC-4068

Total m2 required

The call out reference has been corrected to 13/6505 in drawing no: R1029-01-KCD-
124 Detail & tag are not matching ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4069_A NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
DWG-ALL-ARC-4069

R1029-01-BSB-DWG-ALL-ARC-4069_B
125 Detail & tag are not matching New details is developed with call out 08/6644 ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-01-BSB-DWG-ALL-ARC-6644_A

Fire Hose cabinet incorporated in the drawing no: R1029-01-KCD-DWG-ALL-ARC-4070-


126 Fire hose cabinet is missing ARC LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-4070_B NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
B

R1029-03-KCD-DWG-GFL-ARC-1220-C
R1029-03-KCD-DWG-GFL-ARC-1225-B
127 Door should be swinging on the other direction Arch & FLS Plans to be updated reflecting the change ARC LOW COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
FLS DWG

Page 13 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

128 There is no fire rating on the schedule (Sample only) Fire rating to be updated in the doors schedule ARC LOW COORDINATION PROCEED TECHNICAL DESIGN DOOR SCHEDULE NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

MEP/ARCH
MEP to review the MEP
services height in the heavy
DEWA truck/Garbage
B2 vehicle
129 MEP services projecting below 4.5M truck route MEP services to clear the height requirement truck/loading /staff bus LOW COORDINATION PROCEED TECHNICAL DESIGN MEP NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
entrance
route and to ensure the clear
height from FFL to bottom of
MEP services shall not less
than 4500mm.

MEP/ARCH
MEP to review the MEP
services height in the heavy
DEWA truck/Garbage
B2 route to
130 MEP services projecting below 4.5M truck route MEP services to clear the height requirement truck/loading /staff bus LOW COORDINATION PROCEED TECHNICAL DESIGN MEP NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
loading dock
route and to ensure the clear
height from FFL to bottom of
MEP services shall not less
than 4500mm.

MEP/ARCH
MEP to review the MEP
services height in the heavy
DEWA truck/Garbage
B2 route to
131 MEP services projecting below 4.5M truck route at basement 2 MEP services to clear the height requirement truck/loading /staff bus LOW COORDINATION PROCEED TECHNICAL DESIGN MEP NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
loading dock
route and to ensure the clear
height from FFL to bottom of
MEP services shall not less
than 4500mm.

MEP/ARCH
MEP to review the MEP
services height in the heavy
DEWA truck/Garbage
132 B2 loading dock MEP services projecting below 4.5M truck route at basement 2 MEP services to clear the height requirement truck/loading /staff bus LOW COORDINATION PROCEED TECHNICAL DESIGN MEP NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
route and to ensure the clear
height from FFL to bottom of
MEP services shall not less
than 4500mm.

MEP/ARCH
MEP to review the MEP
services height in the heavy
DEWA truck/Garbage
133 B2 DEWA access MEP services projecting below 4.5M truck route MEP services to clear the height requirement truck/loading /staff bus LOW COORDINATION PROCEED TECHNICAL DESIGN MEP NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
route and to ensure the clear
height from FFL to bottom of
MEP services shall not less
than 4500mm.
Total m2 required
MEP/ARCH
MEP to review the MEP
services height in the heavy
DEWA truck/Garbage
134 B2 DEWA access MEP services projecting below 4.5M truck route MEP services to clear the height requirement truck/loading /staff bus LOW COORDINATION PROCEED TECHNICAL DESIGN MEP NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
route and to ensure the clear
height from FFL to bottom of
MEP services shall not less
than 4500mm.

MEP/ARCH
MEP to review the MEP
services height in the heavy
DEWA truck/Garbage
135 B2 staff drop-off MEP services projecting below 4.5M truck route MEP services to clear the height requirement truck/loading /staff bus LOW COORDINATION PROCEED TECHNICAL DESIGN MEP NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
route and to ensure the clear
height from FFL to bottom of
MEP services shall not less
than 4500mm.

Ground Floor
136 MEP services not indicated MEP services to be shown MEP LOW COORDINATION PROCEED TECHNICAL DESIGN MEP NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
RMU

Highlighted area is having soffit height is only 3800mm which is coming in The marked round about location at B2-Level is DEWA truck route only, To ensure the
B2 DEWA ARC, STR
137 the route of DEWA truck MEP services clear height should not be less than 3050mm. LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
roundabout
No Architectural /STR implementation is required.

Page 14 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

R1029-02-KCD-DWG-B02-ARC-1200
138 B2 Dirty Linen Sink next to concrete wall 100mm blockwall provided for MEP services runing from ceiling to Wash basin. Arch LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-B02-ARC-1206 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

R1029-02-KCD-DWG-B02-ARC-1200
139 B2 Dirty Linen Sink next to concrete wall 100mm blockwall provided for MEP services runing from ceiling to Wash basin. Arch LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-B02-ARC-1205 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

R1029-02-KCD-DWG-B02-ARC-1200
140 B2 Dirty Linen Sink next to concrete wall 100mm blockwall provided for MEP services runing from ceiling to Wash basin. Arch LOW COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-B02-ARC-1203 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED

Blockwork Type-IWT-03 and plaster added in front of concrete wall added to run
R1029-02-KCD-DWG-B01-ARC-1210
141 B1 Admin Office Running of MEP services through RCC wall. MEP services from ceiling to sanitryware Arch/MEP MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
R1029-02-KCD-DWG-B01-ARC-1215

100mm THK. Blockwork Type-IWT-03 and plaster added in front of concrete wall R1029-02-KCD-DWG-GFL-ARC-1220
142 L01 MGM Running of MEP services through RCC wall. added to rum MEP services from ceiling to sanitryware Arch/MEP MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-GFL-ARC-1225 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
R1029-03-KCD-DWG-ALL-ARC-6115

MEP, ID, ARC


GROUND FLOOR-
MEP is not coordianted with ID ceiling in GF retail corridor. Services are MEP to limit equipment within ceiling voids. Need further coordination between MEP Services below false ceiling
143 Main Retila MEDIUM COORDINATION PROCEED TECHNICAL DESIGN MODEL NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
exposed between ceilings. and ID. MEP services need to be redesigned due to technical issues. level should be shifted witin
Corridor
plenum above.

Total m2 required

Acoustic Rating of Generator Rooms/Fan Rooms are not available in


144 GROUND FLOOR N/A Note is added in Louver schedule as per Acoustic Consultant Direction. MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-01-BSB-DWG-ALL-ARC-5101 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
Louvers Schedule

RCP ceiling height will be updated


As per DM regulation the Prayer Room min. height should be 2.70m
GFL
145 NOTE: ID, MEP HIGH COORDINATION PROCEED AUTHORITY R1029-03-BSB-DWG-GFL-ARC-1322 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
PRAYER RM
Current ID drawing is considering 2.4 Currently ID consultant for CE is not on board. The modifications shall be undertaken
while ID consultant will be on board.

Curtain walling across Public Levels is not coordinated with ID RCPs. Curtain wall
External ceiling to have a gap of 600mm to access the glass. • R1029-01-AESG-DWG-ALL-FAC-1005
of the shell & core F&Bs at the Ground Floor have been extended till the sofit of
146 GFL ARC, FAÇADE MEDIUM COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
Level 2 Slab, not taking into consideration the external ceiling & future proposed
Façade detail in coordination with the Architectural will be updated. • R1029-03-BSB-DWG-GFL-ARC-2012
ceiling.

Page 15 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

The size of Ticketing BOH Office is redued due to increase in Lift shaft of E-PL5-01, Modification done in furniture layout without impacying on the capacity of staff and storage R1029-03-KCD-DWG-GFL-ARC-1220-C
147 GFL ARC, Electrical MEDIUM COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
E-PL5-02 and E-PL5-03 at Ground Floor. areas. R1029-03-KCD-DWG-GFL-ARC-1222-B

NOT USED

R1029-02-KCD-DWG-B02-ARC-1300
R1029-02-KCD-DWG-B02-ARC-1301
Soffit insulation is changed from CL-06 to CL-2 covering with cement board and paint
150 B02 Soffit insulation to be changed from CL-06 to CL-02 ARC COORDINATION & COST PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-B02-ARC-1303 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
finish.
R1029-02-KCD-DWG-B02-ARC-1304
R1029-02-KCD-DWG-B02-ARC-1305
R1029-02-KCD-DWG-B02-ARC-1306

F & B and Retails at GFL of the Central Entertainment showing Built up of


The Built up iin F & B and Retails are increased from 150mm to 800mm in the Scoping R1029-03-KCD-DWG-GFL-ARC-1521
150mm which is not in line with Built up in the Model which 800mm. The
151 GFL Plan. The details is revised with 75mm insulation and 75mm screed, and the ARC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN R1029-03-KCD-DWG-GFL-ARC-1522 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
structural drawing also showing the level difference beltween SSL and FFL
remaining 550 shall be By Tenanats. R1029-03-KCD-DWG-GFL-ARC-1524
is 800mm.
R1029-03-KCD-DWG-GFL-ARC-1525
R1029-03-KCD-DWG-GFL-ARC-1526

ARC
R1029-02-KCD-DWG-B01-ARC-4361
BELLAGIO LV ROOM @ B1 STR
MGM2 Main slab has been raised by 230mm to increase the attic void from 470 to 700mm
153 The void between Attic slab and main slab is 470mm which is not ARC HIGH COORDINATION & COST PROCEED AUTHORITY R1029-07-KCD-DWG-ALL-STR-3951-D NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
Substation-2 to comply with Dewa regulations for the attic slab.
complying is with DEWA Regulation. Required depth is 600mm min. R1029-07-KCD-DWG-GFL-STR-4005-D
R1029-07-KCD-DWG-GFL-STR-4032-C

ARC
MGM2 Additional Water Meter Room Additional watermeter room have been provided adjacent to Aria Core to allocate
154 ARC, MEP HIGH COORDINATION & COST PROCEED AUTHORITY R1029-02-KCD-DWG-GFL-ARC-1220 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
Substation-2 Missed out water meters for the f&bs (shell & core) in GFL retail spine. the additional water meters provided.
R1029-02-KCD-DWG-GFL-ARC-1223

ARC
R1029-02-KCD-DWG-B01-ARC-4361
BELLAGIO ADDITIONAL COURTYARD SHAFTS (STORMWATER) STR
MGM2 Additional shafts have been provided to allow for Stormwater emergency free
155 Courtyard stormwater Drainage has no emergency free discharge.
Total m2 required ARC HIGH COORDINATION & COST PROCEED AUTHORITY R1029-07-KCD-DWG-ALL-STR-3951-D NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
Substation-2 discharge.
R1029-07-KCD-DWG-GFL-STR-4005-D
R1029-07-KCD-DWG-GFL-STR-4032-C

ARIA- REDUCE ELECTRICAL ROOM SIZE


ARC
MGM2 The electrical room in Aria GFL can be reduced to remove the Clean agent The electrical room size has been reduced & clean agent system has been replaced
156 ARC, MEP HIGH COORDINATION & COST PROCEED AUTHORITY R1029-02-KCD-DWG-GFL-ARC-1220 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
Substation-2 system. with extinguisher.
R1029-02-KCD-DWG-GFL-ARC-1223

The Detail Pack-A mentioned for Substation Louvers. The profile of Louver
Louver Schedule The Pack detail is changed from PACK A to PACK L ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-5101 NO SPECIFICATIONS UPDATE REQUIRED
bank is not in line with DEWA

The Generator Louvers to be Acoustic Louver, therefore,


Acoustic Louver Generator Room are assigned with general Louvers in Schedule ARC MEDIUM COORDINATION TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-5101 NO SPECIFICATIONS UPDATE REQUIRED
The detail Pack of Generator room Louvers are changed from Pack A to Pack N.

Louver Detail PACK A -The arrangment of louver bank is provided with 90 degree angle.
Louvers are modified with louver bank at pitch 30-45 degree. ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-5101 NO SPECIFICATIONS UPDATE REQUIRED
PACK-A This may not suitable to prevent the Rain penetration inside the rooms.

Page 16 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

1. Louver Tags from L2009 to L2022 are not available in the Carpark
Ventilation KEY PLAN Level 02 (DWG.R1029-01-BSB-DWG-L02-ARC-4451
1. Louvers are taged in the DWG.R1029-01-BSB-DWG-L02-ARC-4451
while these are available in Louver Schedule.
2. Louvers (L2001, L2003, L2004, L2006,L2007,L2008, LL2028 )are taged in the
2. Bellagio Generator Room under the Ramp - Louver numbers are not
DWG.R1029-01-BSB-DWG-L02-ARC-4451
The Carpark available in the KEY PLAN- R1029-01-BSB-DWG-L02-ARC-4451 while these R1029-01-KCD-DWG-L02-ARC-4451
Ventilation Key are available in Louver Schedule R1029-01-KCD-DWG-ALL-ARC-5101
157 3. Louver numbers are populated in the schedule with the revised number from ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
Plan 3-Louvers located at Central Plaza Stairs are not marked in Louver R1029-01-KCD-DWG-ALL-ARC-5103
L2061 to L2067
Schedule while these are marked in the drawing no. 1029-01-KCD-DWG- 1029-01-KCD-DWG-ALL-ARC-5104
ALL-ARC-5104
4. Louvers number are added in Key plan R1029-01-KCD-DWG-ALL-ARC-5103
4. Louver number L2001, L2004, L2028 are available in Schedule while
these are not marked in the KEY Plan

Louver numbers ( from L2050 to L2060) are added in the R1029-01-BSB-DWG-L02-


Louver Schedule- R1029-01-KCD-DWG-L02-ARC-4451
Louvers for intake to staff dining and Spa are missing in the Package. ARC-4451 ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED
Plaza Stair R1029-01-KCD-DWG-ALL-ARC-5101-
and Schedule.

Grating material in Louver schedule is not in line with finishing specifying


Louver Schedule N/A Maerial of grating is changed from steel to Aluminum. ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-5101 NO SPECIFICATIONS UPDATE REQUIRED
in Landscape package Detail.

Free area ratio have been updated by MEP, Architectural Louver schedule Louvers L2061 to L2067 are scheduled in the Louver Scheduled. Louver area, free R1029-01-KCD-DWG-L02-ARC-4451
Louver Schedule N/A ARC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED
Freee area ratio column have been updated accordingly. area, Finish are provided. Detail Pack is provided. R1029-01-KCD-DWG-ALL-ARC-5101

Window Detail Pack E for Window type EW-03 is missing in A-6500 Series of
N/A Detail Pack E is added ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-BO2-ARC-6107 NO SPECIFICATIONS UPDATE REQUIRED
Schedule drawings.

Window Having same design parameters of EW-03 (upward Sliding) is changed to EW-04
For Window type EW-03 of Security Type 5A- Detail Pack F is missing. ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-ALL-ARC-5105 NO SPECIFICATIONS UPDATE REQUIRED
Schedule (Side Sliding). EW-04 could operate more conveniently in comparison with EW-03.

Window Window Tags are missing in HR department office windows at Basement-


Window Tag as EW-01 are provided . ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-BO2-ARC-6107 NO SPECIFICATIONS UPDATE REQUIRED
Schedule 2.

158 LEVEL 1 CLOSED

Window
The Pack A of window is not complying with 90Min FR. New The detail of Window is changed to 90Min FR ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-6557 NO SPECIFICATIONS UPDATE REQUIRED
Schedule
Total m2 required

Window Sill level of windows of security rooms viz 800mm is not complying with
Sill level of windows is increased from 800mm to 1220mm ARC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-BO2-ARC-6107 NO SPECIFICATIONS UPDATE REQUIRED
Schedule operator requirement viz 1220mm

Window Sill level of kitchen windows viz 800mm is not complying with Operator As per kitchen Consultant recommendation the Sill level of windows is raised from
ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-BO2-ARC-6107 NO SPECIFICATIONS UPDATE REQUIRED
Schedule Guidelines (1065mm) and Kitchen Consultant requirement (Viz 1220mm) 800mm to 1220mm

STR
R1029-07-KCD-DWG-B01-STR-3505-D
159 Bst & Podium N/A Drainage Pipes/Soil pies passing over the main Kitchen Area at B2-Level To provide Attic slab at 600mm from Bottom of Slab. ARC, STR MEDIUM COORDINATION & COST PROCEED AUTHORITY NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
R1029-07-KCD-DWG-B01-STR-3531-D
R1029-07-KCD-DWG-B01-STR-3603-B

ARC
R1029-02-KCD-DWG-GFL-ARC-1220
R1029-02-KCD-DWG-GFL-ARC-1224
R1029-02-KCD-DWG-L01-ARC-1230
R1029-02-KCD-DWG-L01-ARC-1234
STR
R1029-05-KCD-DWG-ALL-STR-3942-C
Bellagio Hotel There are no shafts provided to route the pipes from the Belllagio Plant 800 x 1500 shaft have been introduced in Bellagio GFL , L01, & L02 to allow the water
160 N/A ARC, STR, PS MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-05-KCD-DWG-L01-STR-5004-D NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
GFL, L01, L02, L03 Room on GFL to the Water Feature @ the Bellagio Drop-off on level 3. supply & drainage to route from the Plant room to the Water feature.
R1029-05-KCD-DWG-L02-STR-5104-D
PS
R1029- 05-TW-DWG-ALL-PS-0051
R1029- 05-TW-DWG-ALL-PS-0052
R1029- 05-TW-DWG-ALL-PS-0053
R1029- 05-TW-DWG-ALL-PS-0054

Page 17 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

- DEWA checker plate Trenches within the substations, lv rooms & RMU rooms have
been added as per the Electrical Drawings.
-Expansion joint allocation have been reveiwed and updated to assign correct
expansion joint profile. e.g. FOH expansion joints have been provided within the
FLOOR TYPE & EXPANSION JOINT CORRECTIONS
Retail shell & core Spaces.
- The floor Type for each room have been reviewed and updated to assign the correct
Floor types at several areas are not coordinated with the Finishes
floor types. ARC
Schedule, MEP requirements, construction details, Tenant area built-up,
- Additional Floor types have been added to include Floor built-ups that have not R1029-02-KCD-DWG-B01-ARC-1511_C to R1029-03-KCD-
Specialist requirements.
been considered before Such as the Dewa Checker Plate Trench & Chiller Floor Built- DWG-L01-ARC-1536_B
161 FLOOR TYPES N/A ARC, STR, PS MEDIUM COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
up
Wrong indication of expansion joints profile for several areas have been
(FT-30, FT-32, FT-33, FT-34, FT-35, FT-36, FT-37), Refer Drawings 6544 for these built- CONS DETAILS
provided.
ups. R1029-01-KCD-DWG-L01-ARC-6544_A
- Corner Expansion Joints are provided at straight junctions
-Kitchen Floor Types have been updated to reflect the finish zone requirement (from
- Internal Expansion joints are provided at car park areas.
paint to tiles)
- Expansion joints are proivded inside the retails areas.
The expansion joints have been rectified as per the project requirements & as per the
correct assignment for the area of the expansion joint & the profile type of the
expansion joint.

A-2045-ELE
R1029-02-KCD-DWG-ALL-ARC-2045-C
R1029-02-KCD-DWG-ALL-ARC-2047-A
R1029-02-KCD-DWG-B01-ARC-2048-A
- New Numbers have been assigned to the duplicated CW Numbers. R1029-02-KCD-DWG-L02-ARC-2049-A
- Additional legend have been added for the louvers within the ceiling void that have R1029-03-KCD-DWG-GFL-ARC-2011-C
CURTAIN WALL CORRECTIONS
been missed. R1029-03-KCD-DWG-GFL-ARC-2012-B
Summary of the Curtain Wall correction:
- Legend for the Facade system have been updated to refer to the relevant section R1029-03-KCD-DWG-GFL-ARC-2013-B
--Several Curtainwalls were sharing the same CW Number
for the facade system. R1029-03-KCD-DWG-GFL-ARC-2021-A
CURTAIN --Single code have been assigned for the Louvers within the Ceiling Void &
162 N/A - Facade System Codes assigned for each curtainwall have been validated & updated ARC, STR, PS MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-03-KCD-DWG-GFL-ARC-2022-A NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
WALLS External Facade Louvers.
as per the correct allocation to match the elevations & sections. R1029-03-KCD-DWG-GFL-ARC-2041-B
-- Legend of the facades system states (refer to AESG)
- Spandrel have been provided for these panels with mid termination to other R1029-03-KCD-DWG-GFL-ARC-2042-B
- Curtain wall termination to other elements such as walls & ceiling were
elements. R1029-03-KCD-DWG-GFL-ARC-2043-B
incorrect.
-the quantity of the panels stated in the schedules were in correct & have been R1029-03-KCD-DWG-GFL-ARC-2044-B
updated to match the actual quantity of the panels. R1029-03-KCD-DWG-GFL-ARC-2046-B

A-5200- CWS
R1029-01-KCD-DWG-ALL-ARC-5201-B

DOOR SCHEDULE
Summary of the door Schdule corrections DOORS SCHEDULE
- New schedule for the Doors have been developed to link the doors to the room
- Door Number was not linked with the rooms. R1029-03-KCD-DWG-ALL-ARC-531002-A
numbers provided, Key plans for the doors have been produced for ease of
- Several Doors were missing for the schedule. R1029-03-KCD-DWG-ALL-ARC-531003-A
reference.
- Metal Doors were proposed for FOH areas with finish by ID. R1029-03-KCD-DWG-ALL-ARC-531007-A
- Metal Doors in FOH areas have been replaced with wooden doors.
- Fire rating requirements of the doors were inline with the FLS R1029-03-KCD-DWG-ALL-ARC-531008-A
- FR of the Doors have been updated in coordination with the FLS drawings.
163 FLOOR TYPES N/A requirements for several doors. ARC, STR, PS MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-03-KCD-DWG-ALL-ARC-531009-A NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
- Pack Details in the construction details have been updated & door selection of the
- Security code provided for several doors were incorrect. R1029-03-KCD-DWG-ALL-ARC-531010-A
detail have been corrected accordingly.
- Pack Details for Threshold & Jamb have been reviewed & corrected to R1029-03-KCD-DWG-ALL-ARC-531011-A
- Door sizes have been correct to match the authorities minimum requirements.
match the relevant Detail Pack in the Construcion Details. DOORS KEY PLANS
- Acoustic rating have been updated to match the acoustic Specification & operator
- Several doors dimension were smaller the size acceptable by DEWA (For R1029-03-KCD-DWG-B01-ARC-530400-A TO R1029-03-
requirements.
Electrical Rooms) & DM ( Minimum width requirement). KCD-DWG-L02-ARC-530730-A
-Acoustic info were not matching the acoustic/ operator requirements.

Total m2 required

WALL PROTECTION CORRECTIONS - All the Ducts & pipe guards have been updated to follow the updated MEP risers.
- MEP Riser Guard location is not as per the risers. - Several Missing rubber wall guards & Corner guards have been added to the missed
- Rubber guard in several areas in the car park have been missed out from out areas. ARC:
WALL
164 N/A the some areas. - The FOH Bollards have been specified for both Landscape & Architecture, FOH ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-B01-ARC-5711-A to NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
PROTECTION
- Architecture Bollard & Landscape Bollard have the same tag. bollards have been segregated between LA & ARC. R1029-03-KCD-DWG-L01-ARC-5736-A
- Bollards Details have been updated incoordination with security crash rating
requirements.

ARC
Enclosure of the linen chute have been removed from B02 for MGM1 & 2 & ARIA R1029-02-KCD-DWG-B02-ARC-1200-D
R1029-02-KCD-DWG-B02-ARC-1203-B
165 Bst & Podium N/A Linen Chute @B02 have been enclosed with walls (which is not required). ARC, STR MEDIUM COORDINATION & COST PROCEED AUTHORITY NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
Bellagio linen chute enclosure is within a tight space that cannot be used. Enclosure R1029-02-KCD-DWG-B02-ARC-1205-C
for this linen chute have been retained. R1029-02-KCD-DWG-B02-ARC-1206-C

Page 18 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ARC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
PRIORITY / KEY ISSUES OPERATOR & IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
/ CRITICAL TECHNICAL DESIGN STATUS
REQUIRMENTS

1. Refernce Clauses from Specification are not linked with the description 1. The items part of Floor Type Details (6500 series) such as Screed type, Mesh,
of Call Out in Construction Details. insulation type, waterproofing, acoustic underlay, separation layer, finish zone are
2. Blinding and waterproofing are missing from the external work detail ( correctly linked to the Particular Spection Section and Clauses
10/ 6523, 11/6523). 2. Blinding and waterproofing are added to external work in detail
3. Cement board lining missing in Detail 4 and Detail 5 of drawing 10/ 6523, 11/6523
ARC
166 Bst & Podium N/A reference 6523. 3. Cement board lining are added in Detail 4 and Detail 5 of drawing reference ARC MEDIUM COORDINATION & COST PROCEED AUTHORITY NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
R1029-01-KCD-DWG-ALL-ARC-6523
4. Landscape Finishes and Cement board lining to soffit of slab are missing ......ARC-6523
in Detail 4 of Drawing reference 6523 4. Landscape Finishes and Cement board lining to soffit of slab are added in Detail 4
5. Waterproofing and screed over Floating Slab are missing in the detail- 6 of drawing reference ........ARC-6523
of drawing Reference 6523. 5. Waterproofing and screed over Floating Slab are provided in the detail- 6 of
drawing Reference ......ARC-6523

ARC:
R1029-02-KCD-DWG-B02-ARC-1206
R1029-02-KCD-DWG-B01-ARC-1216
R1029-03-KCD-DWG-GFL-ARC-1226
1. FHC and structural wall opening not coordinated.
167 Bst & Podium 2. The extend of the same structural wall in the model not matching with STR wall opening coordinated with FHC and model corrected as per plans. ARC, STR LOW COORDINATION PROCEED TECHNICAL DESIGN STR: NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
B02, B01, L00 architectural plans. R1029-08-KCD-DWG-ALL-STR-2790
R1029-08-KCD-DWG-ALL-STR-2907
R1029-08-KCD-DWG-B02-STR-3006
R1029-08-KCD-DWG-B01-STR-3506
R1029-08-KCD-DWG-GFL-STR-4006

Ladder Schedule :
MISC SCHEDULE
The Ladders in the P&B have been reviewed in accordance to the standards BS 5395
Ladder Schedule :
& ANSI A14.3.
Guard rail requirement is not matching the standard specified in the specs.
Schedule have been updated to refelect all Ladders.
Several Ladders have been missed from the Schedule.
Additional columns for Ladder schedule have been added to show the: Ladder
Several info to identify the laddeer & it's info are missing.
Number, Material, room number, safety Guard, Schedule have been updated to
reflect all the relevant Ladder information. ARC
168 Bst & Podium N/A Access Hatch Schedule: ARC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
R1029-01-KCD-DWG-ALL-ARC-6301
Several Access hactes have been missed in the schedules but shown in the
Access Hatch Schedule:
plans.
Several access hatches have been missed from the Schedule, Schedule have been
Manholes & Access schedules are merged in single schedule.
updated to include it.
Info for Fire rating, insulation, material for several access hatches are
Access Hatch (Vertical & Horizontal) Schedules have been segregated to diffrentiate
incorrect.
between access hatches & Manhole (lifting stations & car park).
The information (FR, Insulation, Material & finish)

DETAIL PLANS CORRECTIONS Detail plans have been updated to tag all furnitures and elements.
The detail Plans missed information for the furniture. The RCP legend have been updated to accurately reference the specification.
The legend of the RCP don't refer to the Specifications. The furntiure schedule in the detail plans have been updated to state all the
The schedule of the furniture is missing several furniture indicated in the furniture mentioned in the schedules. ARC
169 Bst & Podium N/A plans. ARC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-6100_C TO NO SPECIFICATIONS UPDATE REQUIRED LEVEL 1 CLOSED
Additional detail plans have been provided for the additional rooms, Additional detail plans have been provided for the additional rooms, Furniture R1029-03-KCD-DWG-ALL-ARC-6155_C
Furniture Schedule have been provided for these furntiures & have been Schedule have been provided for these furntiures & have been added in the BOH
added in the BOH Furniture Schedule. Furniture Schedule.

Total m2 required

FINISHES SCHEDULE CORRECTIONS


The finishes schedule legend don't refer to the relevant clause. ARC
Legend of the finishes have been updated to reflect the accurate clause in
Several rooms are provided with waterproofing where it's not required & R1029-01-KCD-DWG-ALL-ARC-6000
Specification.
not provided where it's required, the code of the waterproofing provided R1029-01-KCD-DWG-B01-ARC-6001
Waterproofing column have been corrected as per the requirements mentioned in
is incorrect. R1029-01-KCD-DWG-B02-ARC-6002
170 Bst & Podium N/A the specs & construction details. The code of the waterproofing have been corrected ARC MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
Several rooms have been provided with finishes that don't meet the R1029-01-KCD-DWG-B02-ARC-6003
as well.
required function of the room, R1029-01-KCD-DWG-L00-ARC-6004
Additional columns for section (overall schedule) have been added to link the rooms
The Overall P&B finishes schedule (6000) is not linked with the floors R1029-01-KCD-DWG-L01-ARC-6005
with the section stated in the overall schedule.
finishes schedule (6001 to 6005 )

Wasl Comment on MGM submission - MR_35


R1029-01-KCD-DWG-ALL-ARC-4110-B
The Cladding line below the staircase is moved to avoide unaccessible space below R1029-01-KCD-DWG-ALL-ARC-6549
171 Bst & Podium Consultant to ensure all the details that might accommodate debris, water ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
the staircase - 16
..etc. based on the external weather conditions studied and detailed
accordingly.

FOH Expansion joint have been provided for the Shell & core areas, which The expansion joint detail for the shell & core areas have been provided to dictate
172 Bst & Podium N/A ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-01-KCD-DWG-ALL-ARC-6538 NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
is in corret. Additional detail is required for Expansion joint to be provided. the scope demarcation for the tenant.

RCP Corrections
The legend has been updated to accurately refer to the subclause stated in the
In addition to the validation items 02-ARC-01/ 03/ 04/ 150 the following
specification.
has been picked up & corrected: ARC
The ceiling types which have been updated for these rooms incoordination with the
173 Bst & Podium N/A The legend don't state the sub clause refering to the Specification. ARC MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-B01-ARC-1311-B TO NO SPECIFICATIONS UPDATE REQUIRED LEVEL 3 CLOSED
MEP requirements.
Several Ceiling types were not meeting the MEP requirements such as Aria R1029-03-KCD-DWG-L01-ARC-1336-B
All the missed out Ceilings have been provided as per the finishes schedule & the
server room in B01. (Without ceiling).
room function requirements.
Several area ceiling have been missed out from the RCP plans.

Page 19 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - STR - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PRIORITY / KEY ISSUES / CRITICAL PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS INTERNAL STATUS

PODIUM & BASEMENT - GENERAL


R1029-02-KCD-DWG-ALL-STR-2511-B;
R1029-02-KCD-DWG-ALL-STR-2721-B;
R1029-02-KCD-DWG-ALL-STR-2722-A;
R1029-03-KCD-DWG-ALL-STR-3911-A;
R1029-03-KCD-DWG-GFL-STR-4002-C;
Additional information from DM approved drawings incorporated in the NO SPECIFICATION UPDATE
01 Zone E N/A Difference between DM approved drawings and Tender drawings STR HIGH COORDINATION & COST PROCEED R1029-03-KCD-DWG-L01-STR-5002-B; LEVEL 3 CLOSED
structural drawings REQUIRED
R1029-03-KCD-DWG-L02-STR-5102-B;
R1029-03-KCD-DWG-L02-STR-5116-A;
R1029-03-KCD-DWG-L02-STR-5191-A;
R1029-03-KCD-DWG-L02-STR-5192-A;
R1029-03-KCD-DWG-L02-STR-5193-A;

Difference between asbuilt and DM approved drawings. As built drawings are similar NO SPECIFICATION UPDATE
02 B02 Corrected the drawings as per as-built drawings. STR MEDIUM COORDINATION & COST PROCEED R1029-05-KCD-DWG-B02-STR-3002-A LEVEL 3 CLOSED
to calculation models. REQUIRED

Level B01 Slab R1029-05-KCD-DWG-ALL-B01-3721-A, NO SPECIFICATION UPDATE


03 Deflection is not within the limit with 80% of modulus of rupture. Added extra reinforcements for slabs for reducing deflection. STR MEDIUM COORDINATION & COST PROCEED LEVEL 3 CLOSED
Reinforcement Plan R1029-05-KCD-DWG-ALL-B01-3722-A. REQUIRED

Level GF Slab NO SPECIFICATION UPDATE


04 Deflection is not within the limit with 80% of modulus of rupture. Added extra reinforcements for slabs for reducing deflection. STR MEDIUM COORDINATION & COST PROCEED R1029-05-KCD-DWG-ALL-GFL-STR-4222-A LEVEL 3 CLOSED
Reinforcement Plan REQUIRED

Level 01 Slab NO SPECIFICATION UPDATE


05 Deflection is not within the limit with 80% of modulus of rupture. Added extra reinforcements for slabs for reducing deflection. STR MEDIUM COORDINATION & COST PROCEED R1029-05-KCD-DWG-L01-STR-5067-A LEVEL 3 CLOSED
Reinforcement REQUIRED

Level L02 Slab R1029-05-KCD-DWG-L02-STR-5166-A, R1029-05-KCD- NO SPECIFICATION UPDATE


06 Deflection is not within the limit with 80% of modulus of rupture. Added extra reinforcements for slabs for reducing deflection. STR MEDIUM COORDINATION & COST PROCEED LEVEL 3 CLOSED
Reinforcement Plan DWG-L02-STR-5167-A. REQUIRED

Total m2 required

Core and Shear Wall NO SPECIFICATION UPDATE


07 PMM ratio is exceeding. Added extra reinforcements for one wall. STR MEDIUM COORDINATION & COST PROCEED R1029-05-KCD-DWG-ALL-STR-2721-B LEVEL 3 CLOSED
details REQUIRED

NO SPECIFICATION UPDATE
8 Column Schedule Shear links are not adequate for one column. Added shear links as per design requirements. STR MEDIUM COORDINATION & COST PROCEED R1029-03-KCD-DWG-L02-STR-5191-A LEVEL 1 CLOSED
REQUIRED

CORE & SHEAR NO SPECIFICATION UPDATE


09 N/A REINF & Shear links are not adequate . Added REINF & shear links as per design requirements. STR MEDIUM COORDINATION & COST PROCEED R1029-02-KCD-DWG-ALL-STR-2721 LEVEL 1 CLOSED
WALL DETAILS REQUIRED

NO SPECIFICATION UPDATE
10 Column Schedule N/A REINF & Shear links are not adequate . Added REINF & shear links as per design requirements. STR MEDIUM COORDINATION & COST PROCEED R1029-02-KCD-DWG-ALL-STR-2611 LEVEL 1 CLOSED
REQUIRED

Page 20 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - STR - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PRIORITY / KEY ISSUES / CRITICAL PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS INTERNAL STATUS

PODIUM & BASEMENT - GENERAL

R1029-02-KCD-DWG-ALL-STR-3721
NO SPECIFICATION UPDATE
11 PUNCHING SHEAR N/A PUNCHING SHEAR REINFs are not adequate . PUNCHING SHEAR REINFs as per design requirements. STR MEDIUM COORDINATION & COST PROCEED R1029-02-KCD-DWG-ALL-STR-3722 LEVEL 1 CLOSED
REQUIRED

R1029-02-KCD-DWG-ALL-STR-3722
NO SPECIFICATION UPDATE
12 ADDITIONAL REINF. N/A ADDITIONAL REINFs are not adequate . ADDITIONAL REINFs as per design requirements. STR MEDIUM COORDINATION & COST PROCEED R1029-02-KCD-DWG-ALL-STR-5166 LEVEL 1 CLOSED
REQUIRED
R1029-02-KCD-DWG-ALL-STR-5167

R1029-02-KCD-DWG-ALL-STR-4002
NO SPECIFICATION UPDATE
13 ADDITIONAL REINF. N/A ADDITIONAL beams are not provided . ADDITIONAL beams as per design requirements. STR MEDIUM COORDINATION & COST PROCEED R1029-02-KCD-DWG-ALL-STR-5002 LEVEL 1 CLOSED
REQUIRED
R1029-02-KCD-DWG-ALL-STR-5102

Total m2 required

Page 21 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - LGT - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

DISCIPLINES PRIORITY / KEY ISSUES AUTHORITY, OPERATOR &


REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT CLIENT AGREEMENT PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS IMPLEMENTATION STATUS
IMPACTED / CRITICAL TECHNICAL DESIGN REQUIRMENTS

TECHNICALLY R1029-01-LET-DWG-ALL-LGT-10000 TO
08 Ocean Drive & plaza 1. Conflict on reference naming in the plan & details. 1. Need to be rectified. MEP LOW COORDINATION PROCEED TECHNICAL DESIGN TBC LEVEL 1 CLOSED
APPROVED R1029-03-LET-DWG-GFL-LGT-40000

1. Recommend to provide steplights to follow the same design concept


intent. This is an omission. TECHNICALLY R1029-01-LET-DWG-ALL-LGT-10000 TO
09 Ocean Drive & plaza 1. Step light missing as highlighted. MEP LOW COORDINATION & COST PROCEED TECHNICAL DESIGN TBC LEVEL 3 CLOSED
APPROVED R1029-03-LET-DWG-GFL-LGT-40000
KCD implementation pending. Wasl to advise.

Silmilar reference name was used for different type of light fixtures at
different location/ areas, which will creates confusion and mistakes while
To avoid confusions we receommend to use seprate reference number TECHNICALLY R1029-01-LET-DWG-ALL-LGT-10000 TO
12 Site Wide preparing the BOQ. Lighting LOW COORDINATION PROCEED TECHNICAL DESIGN TBC LEVEL 1 CLOSED
for each type of light fixtures. APPROVED R1029-03-LET-DWG-GFL-LGT-40000
For Eg:- In Aria Hotel Façade, FB(2) Light is Linear led strip light and in the
MPV FB(2) light light is moving head projector.

The delivered lumen package is not shown in the specification. Which we TECHNICALLY R1029-01-LET-DWG-ALL-LGT-10000 TO
14 Site Wide N/A Need to revise the specification and mention the lumen package Lighting LOW COORDINATION PROCEED TECHNICAL DESIGN TBC LEVEL 1 CLOSED
advise to provide. APPROVED R1029-03-LET-DWG-GFL-LGT-40000

Total m2 required

Page 22 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - FLS - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY, OPERATOR &


DISCIPLINES PRIORITY / KEY ISSUES /
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT PURPOSE CLIENT REMARKS TECHNICAL DESIGN DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS IMPLEMENTATION STATUS
IMPACTED CRITICAL REQUIRMENTS

Typical: Occupant load calculations and egress capacity calculations missing Revised occupant load shall be calculated and submission shall be
01 GEN GENERAL COMMENT FLS LOW COORDINATION PROCEED AUTHORITY N/A N/A LEVEL 1 CLOSED
from all FLS basement and podium drawings. made upon completion of the relevant design changes

KC-Comment
B2 + B1 Central Staircase should be pressurised. Pressurization is already provided for Staircase.
02 FLS MEDIUM COORDINATION N/A AUTHORITY N/A N/A LEVEL 3 CLOSED
Entertainment 2hr fire rated lobby has been provided in place of staircase pressurisation.
No action required

B1 Central The existing arrangement is considered acceptable considering


03 Travel distance exceeds allowable limit. FLS MEDIUM COORDINATION & COST N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
Entertainment drawings have already been approved by DCD.

Not required. The egress route opens to sky between gridlines A-R to
Stair leading to the fire pump room shall be directly and immediately A-S.
GF Central
04 accessible from the fire department access road. It is currently located 70m FLS HIGH COORDINATION & COST N/A AUTHORITY N/A N/A LEVEL 1 CLOSED
Entertainment
away.
No action required

The comment is closed as Generator rooms face an open to sky


area.
GF Central Generator shall be separated from road since it is used as an escape route.
05 FLS MEDIUM COORDINATION & COST N/A AUTHORITY N/A N/A LEVEL 1 CLOSED
Entertainment Generator walls to be fire rated.
No action required

DISCUSSED AND CONFIRMED FROM FLS ; NO REQUIREMENT FOR


EXTERNAL EXIT DOOR.
At least 50% of the Central Entertainment staircases must discharge directly
GF Central to outside. Currently, only 1 out of 3 staircases discharge externally.
06 OUT OF 3 STAIRCASES 2 DISCHARGE OUTSIDE ALREADY AS PER FLS ARC, FLS HIGH COORDINATION & COST N/A AUTHORITY N/A N/A LEVEL 1 CLOSED
Entertainment
REQUIREMENT
The staircase must be rearranged to exit directly to outside.
No action required

Total m2 required
ARC
R1029-02-KCD-DWG-ALL-ARC-2045
The glazing will be changed from Normal glazing to 2-Hr fire rated FAC R1029-00-AES-SPC-FAC- 0012 of Façade -
B2 + B1 Central
07 Glazing in 2hr fire rated walls shall have a fire rating of 90 minutes. glazing. FAC HIGH COORDINATION & COST PROCEED AUTHORITY R1029-01-AESG-DWG-ALL-FAC-1010_DWG-DD Particular Specification LEVEL 3 CLOSED
Entertainment
R1029-01-AESG-DWG-ALL-FAC-1011_DWG-DD Refer to item-11
R1029-01-AESG-DWG-ALL-FAC-1012_DWG-DD

1. Door swings direction have flipped to open in the direction of the ARC
L1 Central
08 Doors to open in the direction of egress travel. egress. ARC, MEP HIGH COORDINATION PROCEED AUTHORITY R1029-03-KCD-DWG-L01-ARC-1230 NO SPECIFICATION UPDATE REQUIRED LEVEL 1 CLOSED
Entertainment
2. FHC location shifted R1029-03-KCD-DWG-L01-ARC-1232

The staircase should be separated from other areas of the building by 2hrs
fire rated construction. The FLS drawings do not show any fire rating around
It is understood that the room adjacent to the stair is an air plenum
the staircase.
L1 Central and, therefore, fire rating is not required. The comment can be
09 FLS HIGH COORDINATION AUTHORITY N/A N/A LEVEL 3 CLOSED
Entertainment closed providing the use of the plenum will not be changed.
It must be ensured that the rooms adjacent to the stair are do not pose any
risk to escaping occupants. Otherwise, the staircase walls shall achieve a fire
resistance rating of 2 hours.

L1 Central This has been checked, wall is already 2hr fire rated blockwork.
10 MEP areas shall be enclosed in 1hr fire rated construction. FLS HIGH COORDINATION N/A AUTHORITY N/A N/A LEVEL 3 CLOSED
Entertainment No further action required

Page 23 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - FLS - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY, OPERATOR &


DISCIPLINES PRIORITY / KEY ISSUES /
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT PURPOSE CLIENT REMARKS TECHNICAL DESIGN DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS IMPLEMENTATION STATUS
IMPACTED CRITICAL REQUIRMENTS

1. Staircase door-092 relocated ARC


Where the exit discharges under the building, the distance to open sky area 2. Blockwork added toward parking area R1029-03-KCD-DWG-GFL-ARC-1220
11 Aria GF ARC, FLS HIGH COORDINATION & COST PROCEED AUTHORITY NO SPECIFICATION UPDATE REQUIRED LEVEL 3 CLOSED
must not exceed 6m. 3. Blockwork and door-891 added to dvelope corridor R1029-03-KCD-DWG-GFL-ARC-1223
4. External Door-892 relocated and type of door changed R1029-01-KCD-DWG-ALL-ARC-4102

Common path and exit separation in the gym are not in line with code
requirements. 1. Glazing to ARIA Gym will be changed to 1-HR Fire Rated Glazing.
ARC
Fire rating of the fixed glazing may be achieved by using heat-
R1029-03-KCD-DWG-GFL-ARC-1220
12 Aria GF It is proposed to resolve the non-compliances by providing a fire rated strengthened glazing + window sprinklers. ARC, ID HIGH COORDINATION & COST PROCEED AUTHORITY NO SPECIFICATION UPDATE REQUIRED LEVEL 3 CLOSED
R1029-03-KCD-DWG-GFL-ARC-1223
partition + doors as shown above. This provides two distinct egress routes
R1029-01-KCD-DWG-ALL-ARC-5011
from the gym and removes the risk of both exits being unavailable at any one 2. Door adjacent to the lifts need not be fire rated.
time.

Electric vehicles are a relatively new occurrence and for this reason
this topic is not covered by the UAE Fire Code. For this reason, we do
not expect DCD to pick up on this issue. However, nowadays the
Typical for all internal spaces: Charging stations should not be located within
Typical for all risks of electric vehicle fires are better understood, and it is possible
13 escape corridors as they are a fire risk. ARC HIGH COORDINATION & COST N/A AUTHORITY N/A N/A LEVEL 3 CLOSED
buildings that DCD have a different stance on the subject compared to when
the drawings were previously approved.

KCD: This is not an authority requirement.

ARC
14 B02 MGM1 Door to open in the direction of egress travel. Door swings changed as per FLS comment. ARC HIGH COORDINATION PROCEED AUTHORITY R1029-01-KCD-DWG-B02-ARC-1200 NO SPECIFICATION UPDATE REQUIRED LEVEL 3 CLOSED
R1029-01-KCD-DWG-B02-ARC-1205

The highlighted partitions are blockwork and are achieving the 1 HR


required fire rating by FLS.
Walls between shell & core retails and the air lock lobby shall be 1 HR fire
15 GFL MGM1 ARC HIGH COORDINATION PROCEED AUTHORITY N/A N/A LEVEL 3 CLOSED
Rated
FLS drawings to be updated to reflect the same when submitting to
the local authorities.

Door swing direction is not in line with FLS requirement.


Impacted Doors ARC
Door swing Direction to be changed toward opposite direction.
B2 - 367 R1029-01-KCD-DWG-B02-ARC-1200
Updated.
16 Basement-2 B2 - 642 ARC HIGH COORDINATION PROCEED AUTHORITY R1029-01-KCD-DWG-B02-ARC-1205 NO SPECIFICATION UPDATE REQUIRED LEVEL 1 CLOSED
This comment is related to NTT and will be implemented as part of
B2 - 643 R1029-01-KCD-DWG-B02-ARC-1206
NTT implementation.
B2 - 710 R1029-02-KCD-DWG-B02-ARC-6101

Total m2 required

Page 24 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - SEC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY, OPERATOR &


PRIORITY / KEY ISSUES / IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS TECHNICAL DESIGN DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
CRITICAL STATUS
REQUIRMENTS

The item was discussed with wasl, wasl confiremd to proceed as per the current tender
01 Basement 2 N/A Risk from Delivery truck scanning location in basement 2. design. ARC, SEC MEDIUM COORDINATION & COST N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED

SEC-LAYOUTS
R1029-02-KTC-DWG-B02-SEC-1200 TO 1206
R1029-02-KTC-DWG-B01-SEC-1210 TO 1216
Re-design is required with reference to the new law for the driveway cameras, at every 30 meters Layouts & Camera schedules have been updated to comply with the New Sira Law regualtions for R1029-03-KTC-DWG-GFL-SEC-1220 TO 1227 NO SPECIFICATION UPDATE
02 All N/A SEC, ELE HIGH COORDINATION & COST PROCEED AUTHORITY LEVEL 3 CLOSED
camera shall be provided. the camera regulations. R1029-03-KTC-DWG-L01-SEC-1230 TO 1236 REQUIRED

SEC-SCHEMATIC
R1029-03-KTC-DWG-ALL-SEC-50002

SEC-LAYOUTS
R1029-02-KTC-DWG-B02-SEC-1200 TO 1206
NO SPECIFICATION UPDATE
03 All N/A Some blind spots were found on the ramp areas and driveways. All blind spots have been covered by Camera & implemented under item 02-SEC-02. SEC, ELE HIGH COORDINATION & COST PROCEED AUTHORITY R1029-02-KTC-DWG-B01-SEC-1210 TO 1216 LEVEL 3 CLOSED
REQUIRED
R1029-03-KTC-DWG-GFL-SEC-1220 TO 1227
R1029-03-KTC-DWG-L01-SEC-1230 TO 1236

SEC-LAYOUTS
Cameras & Access control for the UPS room in Aria at B01 have been added. R1029-02-KTC-DWG-B01-SEC-1213
R1029-03-KTC-DWG-GFL-SEC-1221 NO SPECIFICATION UPDATE
04 B01 N/A Camera and access control door for one of the UPS rooms is missing. SEC, ELE LOW COORDINATION & COST PROCEED AUTHORITY LEVEL 3 CLOSED
Additional identification camera have been added to the Fan Supply room in GFL central REQUIRED
entertainment. SEC-SCHEDULE
20230623 PODIUM - VSS SCHEDULE

BOH camera are not required as per the new law, need confirmation from operations team regarding
05 All N/A Operator/ Client: Cameras to remain as per the original Design. SEC, ELE LOW COORDINATION & COST N/A AUTHORITY N/A N/A LEVEL 3 CLOSED
keeping the cameras or removing them.

Access control type changed in few fire exit door to comply with DCD requirement. ACS have been SEC-LAYOUT
upadated as per the following: R1029-02-KTC-DWG-GFL-SEC-1225
R1029-02-KTC-DWG-B02-SEC-1205
NO SPECIFICATION UPDATE
06 B02, B01 GFL N/A Access control on fire exit verified with the fire consultant and operator. EN1111 to AX1111 SEC HIGH COORDINATION & COST PROCEED AUTHORITY R1029-02-KTC-DWG-B02-SEC-1206 LEVEL 3 CLOSED
REQUIRED
EN1121 to AX1121 R1029-02-KTC-DWG-B01-SEC-1215
EN1121 to RX1121, R1029-02-KTC-DWG-B01-SEC-1216
EN1111 to RX1111

Total m2 required

NO SPECIFICATION UPDATE
09 All N/A Fixed bollard design to be changed for shallow mounting. Fixed Bollards Details have been revised to a shallow mounting type with the same securtiy rating. SEC, ARC LOW COORDINATION PROCEED OPERATOR R1029-03-KTC-DWG-ALL-SEC-30005 LEVEL 1 CLOSED
REQUIRED

SEC-LAYOUT
R1029-02-KTC-DWG-B01-SEC-1211
R1029-02-KTC-DWG-B01-SEC-1212
R1029-02-KTC-DWG-B01-SEC-1215
R1029-02-KTC-DWG-B01-SEC-1216
R1029-02-KTC-DWG-B02-SEC-1201
R1029-02-KTC-DWG-B02-SEC-1202
Access control have been revised to comply with regulation as per the following:
R1029-02-KTC-DWG-B02-SEC-1205
EX 1111 to AX 1111,
R1029-02-KTC-DWG-B02-SEC-1206
EX 1111 TO RE0011,
R1029-03-KTC-DWG-GFL-SEC-1221
EX6111 TO RE0011, NO SPECIFICATION UPDATE
10 All N/A Staircase access control aren't compliant with local authority requlation. SEC LOW COORDINATION & COST PROCEED AUTHORITY R1029-03-KTC-DWG-GFL-SEC-1222 LEVEL 3 CLOSED
EX 0011 TO EX1111, REQUIRED
R1029-03-KTC-DWG-GFL-SEC-1225
EX6111 to AX1111
R1029-03-KTC-DWG-GFL-SEC-1226
EX6111 to EX1111,
R1029-03-KTC-DWG-L01-SEC-1232
EX0011 to RX1111
R1029-03-KTC-DWG-L01-SEC-1235
R1029-03-KTC-DWG-L01-SEC-1236

SEC- ACS DETAILS


R1029-03-KTC-DWG-ALL-SEC-30007
R1029-03-KTC-DWG-ALL-SEC-30013

SEC LAYOUT
R1029-02-KTC-DWG-BO2-SEC-1201
The current Door Access control of the Security control room in B02 is Pinpad. This increases the risk The Door Access control of the Security control room in B02 have been revised from Pinpad to IRIS Security NO SPECIFICATION UPDATE
11 B02 N/A LOW COORDINATION & COST PROCEED AUTHORITY LEVEL 3 CLOSED
of security breach. to increase the level of the Security. MEP REQUIRED
SEC- ACS DETAILS
R1029-03-KTC-DWG-ALL-SEC-30006

Page 25 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - SEC - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY, OPERATOR &


PRIORITY / KEY ISSUES / IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS TECHNICAL DESIGN DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
CRITICAL STATUS
REQUIRMENTS

SEC LAYOUT
R1029-02-KTC-DWG-B01-SEC-1211,
R1029-02-KTC-DWG-B01-SEC-1216,
R1029-02-KTC-DWG-B02-SEC-1201,
R1029-02-KTC-DWG-B02-SEC-1202,
B02 Security NO SPECIFICATION UPDATE
12 N/A Door Contact is missed out from several doors in the BOH rooms. Door Contact have been provided for the missed out doors in the BOH rooms. LOW COORDINATION & COST PROCEED TECHNICAL DESIGN R1029-02-KTC-DWG-B02-SEC-1203, LEVEL 3 CLOSED
B01 MEP REQUIRED
R1029-02-KTC-DWG-B02-SEC-1205,
R1029-02-KTC-DWG-B02-SEC-1206

SEC SCHEDULE
20230623 PODIUM- ACS SCHEDULE

SEC LAYOUT
R1029-02-KTC-DWG-B01-SEC-1212,
R1029-02-KTC-DWG-B01-SEC-1216,
R1029-02-KTC-DWG-B02-SEC-1201,
R1029-02-KTC-DWG-B02-SEC-1203,
R1029-02-KTC-DWG-B02-SEC-1204,
R1029-02-KTC-DWG-B02-SEC-1205,
R1029-02-KTC-DWG-B02-SEC-1206,
R1029-03-KTC-DWG-L01-SEC-1232,
Security R1029-03-KTC-DWG-L01-SEC-1233, NO SPECIFICATION UPDATE
13 B01 N/A Access Control System is missed out from several doors in the BOH rooms & Offices. Access Control System have been provided for themissed out doors in the BOH rooms & Offices. LOW COORDINATION & COST PROCEED TECHNICAL DESIGN LEVEL 3 CLOSED
MEP R1029-03-KTC-DWG-GFL-SEC-1222, REQUIRED
R1029-03-KTC-DWG-GFL-SEC-1223,
R1029-03-KTC-DWG-GFL-SEC-1225

SEC- ACS DETAILS


R1029-03-KTC-DWG-ALL-SEC-30006
R1029-03-KTC-DWG-ALL-SEC-30008

SEC SCHEDULE
20230623 PODIUM- ACS SCHEDULE

SEC LAYOUT
R1029-02-KTC-DWG-B02-SEC-1203,
R1029-02-KTC-DWG-B02-SEC-1204,
R1029-02-KTC-DWG-B02-SEC-1205
NO SPECIFICATION UPDATE
14 B02 N/A Access Control System has not been provided for turnstile. Drawings & details have been updated to include the ACS for the Turnstile ARC, SEC LOW COORDINATION & COST PROCEED TECHNICAL DESIGN SEC- ACS DETAILS LEVEL 3 CLOSED
REQUIRED
R1029-03-KTC-DWG-ALL-SEC-30006
R1029-03-KTC-DWG-ALL-SEC-30013

SEC SCHEDULE
20230623 PODIUM- ACS SCHEDULE

ARC
Refer to tracker tracker no. 02-ARC-45 for impaced documents of
New Bellagio IDF is proposed for Security Racks by reducing the size of GSM room at Basemnt -2.
IDF room of Bellagio Hotel in B2-level having space constraint as the room is being used for both ICT Architectur NO SPECIFICATION UPDATE
16 B02 BELLAGIO ARC, SEC, MEP, ICT LOW COORDINATION PROCEED TECHNICAL DESIGN LEVEL 3 CLOSED
and Security Racks. REQUIRED
Smartworld have no objection in reducing the size of GSM room.
SEC
R1029-02-KTC-DWG-B02-SEC-1204,

ARC
The following guard rooms is designed with rack sizes of 650 x 650,The room sizes are required to Refer to tracker tracker no. 02-ARC-46 for impaced documents of
increase to accommodate the rack szes of 850 X 850mm. Architectur
1. GR.OG.02 (Arrival Drive)
ARC, SEC NO SPECIFICATION UPDATE
17 ARRIVAL DRIVE N/A 2. GR.OG.03 (Arrival Drive) Cavity wall around the security rack to be removed to accommodate the 800 x 800 Rack. LOW COORDINATION PROCEED TECHNICAL DESIGN SEC LEVEL 3 CLOSED
REQUIRED
3. TC.OG.01 (Tennis Court) R1029-02-KTC-DWG-B02-SEC-1202
R1029-03-KTC-DWG-GFL-SEC-1227
R1029-01-KTC-DWG-ALL-SEC-30028
R1029-02-KTC-DWG-ALL-SEC-30009
Total m2 required

Page 26 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - VTP - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

A
S AUTHORITY, OPERATOR &
PRIORITY / KEY ISSUES / IMPLEMENTATION
REF NO S LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS TECHNICAL DESIGN DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
CRITICAL STATUS
E REQUIRMENTS
T
P
O
D
I Structural & Architectural headroom allow for 5780mm. (No Structural/
U The headroom of 4000mm with cabin height of 2700mm shall limit
Architectural update required). R-1029-01-VTI-SPC-VTP-00001_F
01 M P-SL04/05 potential manufacturers and may impact the code minimum safety space Arch/ STR MEDIUM COORDINATION PROCEED TECHNICAL DESIGN VTP LEVEL 1 CLOSED
VTP Drawings & specifications have been updated to reflect the 5780mm ANNEXURE 6
& requirements R1029-03-VTI-DWG-ALL-VTP-0018
B headroom. Page 101 Sl no 19
A
S
E
P
O
D
I Headroom is 5780mm as per tracker 02-VTP-01, there is longer requirement
Due to the limited headroom 4000, cabin height of 2700 is not feasible.
U to reduce the cabin height.
Cabin height of 2300 shall be the maximum possible with not less than 4
02 M P-SL04/05 Arch/ STR MEDIUM COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
global suppliers. If the cabin height is 2300, then the standard door size is
& No Action required
B 2100/ 2200. 2300 mm high sizes are possible under customization option.
A
S
E
P
O
D
I Safety gear has already been added as part of particular specification.
U VTIG 15-Mar 2023 - Further review has done and concluded that there is no
03 M R-PL02-01, 02 No safety gear for counterweight specified. usable space below PIT. Safety gear for Counterweight is not required. VT MEDIUM COORDINATION & COST N/A AUTHORITY N/A N/A LEVEL 3 CLOSED
&
B No Action Required
A
S
E
P
O
D
I VT analysis to be carried out as part of validation. Confirmed no issues
U
R-PL01-01,02/ R-PL-02- found.
05 M No Circulation Stuies in the Design Report No Circulation Stuies in the Design Report VT LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
01, 02
&
B No Action Required
A
S
E
P
O
D
I
U
M These lifts shall require special rating for protection not limited to IP rating
07 R-PL02-01, 02 Specification has already been updated as part of particular specifications. VT/ QS MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN NO DRAWINGS UPDATE REQUIRED R-1029-01-VTI-SPC-VTP-00001_F LEVEL 3 CLOSED
& of the fixtures, Electricals, 316 grade stainless steel etc.
Page 23 Sl no 24
B
A
S
E
M
P
O
D
I
U
Increased cabin depth by 100mm. New cabin depth 1500mm. Lift capacity VTP
08 M R-PL02-01, 02 Cabin depth is not meeting the minimum code requirement VT/QS MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN R-1029-01-VTI-SPC-VTP-00001_F LEVEL 3 CLOSED
remains same. R1029-03-VTI-DWG-ALL-VTP-0020
& Page 98 Sl no 08
B
A
S
E
P
O
D
I ARC
U R1029-01-KCD-DWG-ALL-ARC-4161
M Lift suppliers are limited with the current pit depth of 1600mm. Pit depth STR
09 P-SL-02/03 Increased Pit depth have been increased from 1600mm to 1800mm ARC/ STR/ VT MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN R-1029-01-VTI-SPC-VTP-00001_F LEVEL 1 CLOSED
& to be increased to 1800 mm to allow more suppliers to bid
Page 101 Sl no 18
B VTP
A Total m2 required R1029-07-VTI-DWG-ALL-VTP-0006
S
E
M
P
O
D
I
U
M VTP NO SPECIFICATION UPDATE
11 M2-SL3-01 The lift shaft wall is with Block Wall Lintels at bracket levels to be incorporated in VT drawings. ARC/ STR/ VT MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN LEVEL 1 CLOSED
& R1029-07-VTI-DWG-ALL-VTP-0004 REQUIRED
B
A
S
E
M
P
O
D
I ARC
U R1029-01-KCD-DWG-ALL-ARC-4162
M Lift suppliers are limited with the current pit depth of 1600mm. Pit depth STR
12 M2-SL3-01 Increased Pit depth to 1800mm ARC/ STR/ VT MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN R-1029-01-VTI-SPC-VTP-00001_F LEVEL 1 CLOSED
& to be increased to 1800 mm to allow more suppliers to bid
Page 104 Sl no 18
B VTP
A R1029-07-VTI-DWG-ALL-VTP-0004
S
E
M

Page 27 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - ACU - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY, OPERATOR &


PRIORITY / KEY ISSUES /
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS TECHNICAL DESIGN DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS IMPLEMENTATION STATUS
CRITICAL REQUIRMENTS

Most of the Plantroom walls shows 200mm solid block work, which is
01 Plantroom capable of achieving the acoustic rating of Rw 50-55 dB, thus found to NO ACTION REQUIRED ARC, ACU LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
be acoustically acceptable.

Most of the Plantroom walls shows 200mm solid block work, which is
02 Platrooms Plantroom walls to be 55db. capable of achieving the acoustic rating of Rw 50-55 dB, thus found to NO ACTION REQUIRED ARC, ACU LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 3 CLOSED
be acoustically acceptable.

B02 - CHWP Current CHWP room wall is a thermal block 200mm block, found to
03 NO ACTION REQUIRED ARC, ACU LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
perimeter Wall be acoustically acceptable.

BOH Offices The BOH offices walls maintain a 100mm thick solid blosk wall, which
04 NO ACTION REQUIRED ARC, ACU LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
Wall is found to be acoustically acceptable

Retails The retails area maintain 200mm thick solid block walls, which is
05 NO ACTION REQUIRED ARC, ACU LOW COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
Demising Walls found to be acoustically acceptable.

MEP R1029-01-HPT-SPC-KLW-00010
Equipments The Pipework isolation details are not inline with acoustic project All the pipework within the Plantrooms is to be isolated using MEP PARTICULAR SPECIFCATION
06 MEP, ACO HIGH COORDINATION & COST PROCEED AUTHORITY NO DRAWINGS UPDATE REQUIRED LEVEL 3 CLOSED
Standard specs 25mm deflection spring mounts using a goal post. ADDENDUM TO SECTION 230548
details REFER TO ITEM 6

Total m2 required

MEP R1029-01-HPT-SPC-KLW-00010
Equipments The Pipework isolation details are not inline with acoustic project All the pipework within the Plantrooms is to be isolated using MEP PARTICULAR SPECIFCATION
07 MEP, ACO HIGH COORDINATION & COST PROCEED AUTHORITY NO DRAWINGS UPDATE REQUIRED LEVEL 3 CLOSED
Standard specs 25mm deflection spring mounts using a goal post. ADDENDUM TO SECTION 230548
details REFER TO ITEM 6

Authority requirement item


MEP R1029-01-HPT-SPC-KLW-00010
The current CHWP is isolated using inertia base, which is found to be
Equipments All the pipework within the Plantrooms is to be isolated using MEP PARTICULAR SPECIFCATION
08 acoustically acceptable. MEP, ACO HIGH COORDINATION & COST PROCEED AUTHORITY NO DRAWINGS UPDATE REQUIRED LEVEL 3 CLOSED
Standard 25mm deflection spring mounts using a goal post. ADDENDUM TO SECTION 230548
However the Pipework isolation is not inline with the project acoustic
details REFER TO ITEM 6
requirements

R1029-00-KCD-DWG-ALL-ARC-531005
R1029-00-KCD-DWG-ALL-ARC-531006
R1029-00-KCD-DWG-ALL-ARC-531016
HVAC/Plantroo MEP Plantrooms to have an acoustic rated door having Rw R1029-00-KCD-DWG-ALL-ARC-531017
09 Acoustic rated door is required for MEP/HVAC plantroom. ARCH, MEP, ACO LOW COORDINATION & COST PROCEED TECHNICAL DESIGN NO SPECIFICATION UPDATE REQUIRED LEVEL 3 CLOSED
m/FAN room 35dB acoustic rating as per the project acoustic specification. R1029-00-KCD-DWG-ALL-ARC-531018
R1029-00-KCD-DWG-B02-ARC-531004
R1029-00-KCD-DWG-B02-ARC-531015

Page 28 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - KLW - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY, OPERATOR &


PRIORITY / KEY ISSUES / IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS TECHNICAL DESIGN DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
CRITICAL STATUS
REQUIRMENTS

Operator comments on current DD stage design received and all comments


There is MGM comments and responses provided in this page. First response
Page no. 15 in on DD stage were closed
01 mentions that Tricon will be presenting 50% SD. Second response metions that 85% KLW LOW COORDINATION N/A N/A N/A LEVEL 1 CLOSED
Schematic Report
SD will be presented to Operator.
No further Action required

Food authority approval requirement


There is food & waste movement happening within same internal corridor, which Kitchen internal Operation only. Identified issue can be addressed via time
could have been avoided and separate corridor was possible for clean & dirty management to ensure clean and dirty don’t cross.
KLW Layout for
02 movement to avoid any chance of cross contamination. KLW, Arch. LOW COORDINATION N/A N/A N/A LEVEL 3 CLOSED
Basement-2
There is corridor running between grid A1 & A2. It can be used for clean movement No further Action required
into commissary kitchen, bulk kitchen and room service to resolve this issue and
there will be dedicated service corridor for food movement into the kitchen.

ARC (01-ARC-34)
R1029-02-KCD-DWG-B02-ARC-1305-A
R1029-02-KCD-DWG-B02-ARC-1306-A
Finishes of service corridor changed same as Kitchen corridor. It is covered R1029-03-KCD-DWG-GFL-ARC-1321-A
Food authority approval requirement R1029-01-KCD-SPC-ARC-00001) ARCH
in 02-ARC-01 and 02-ARC-02. R1029-03-KCD-DWG-GFL-ARC-1323-A
KLW Layout for The waste transfer from interim waste room(Grid F-15) to main waste collection PARTICULAR SPECIFICATIONS, ADDITION TO
03 KLW, Arch. LOW COORDINATION & COST PROCEED AUTHORITY R1029-03-KCD-DWG-GFL-ARC-1324-A LEVEL 1 CLOSED
Basement-2 room is an issue here. This will have to either cross hot kitchen to reach to main BOH SECTION K40, M40
Exemption to be obtained during approval for the transfer of the waste to R1029-02-KCD-DWG-ALL-ARC-6110-A
corridor or cross through receiving & deboxing area. REFER TO ITEM NO.05 & 12
the colleciton room. R1029-02-KCD-DWG-B02-ARC-6102-A
R1029-02-KCD-DWG-B02-ARC-6103-A
R1029-02-KCD-DWG-B02-ARC-6104-A
R1029-02-KCD-DWG-B02-ARC-6106-A

Operational requirement
All waste from deboxing & sanitation room to come out to loading dock
The access corridor for service lobby of lift M2-SL5-01 & M2-FSL5-01 is used for
and enter to main waste collection room via dirty trolly entrance door. This
KLW Layout for waste removal from receiving area after deboxing & sanitation. This will increase
04 is the only option to resolve this issue if objected by the authority. KLW, Arch. LOW COORDINATION N/A N/A N/A LEVEL 3 CLOSED
Basement-2 chances of cross contamination.
Kitchen internal Operation only.

The report has allowance for 2 days resilience for waste holding in main
The report has many of generic details and not many details provided for project. waste collection room, although collection frequency is mentioned for daily
Schematic Report on There is no strategy provided along with skip and portable compactor capacity. The collection. Operationally if 2 days resilience is not possible, daily collection
06 N/A KLW LOW COORDINATION N/A N/A N/A LEVEL 1 CLOSED
Waste Management movement of waste from the development to the waste management room is not will be the only option.
elaborated in the report.
Note - no action

There is level difference of more than 1 meter in both main waste collection room
between the room and truck dock. There is portable compactor placed at the exit
route of waste skips. The only way of waste skip loading in garbage truck is when
Loading dock for
portable compactor has been removed from it's location.
waste skip at
07 All non recyclable waste shall be held in portable compactor and one day storage of Operation - no action required KLW LOW COORDINATION N/A N/A N/A LEVEL 1 CLOSED
basement 2 level in
organic waste shall be done in 1.1 cbm skip. The organic waste shall be converted
KLW design
into manure using composter and that shall also be held in 1.1 cbm skip till it is taken
out from waste room. the exit of 1.1 cbm skip shall be done from the exit door near
gas bottle storage cage.
Total m2 required

There is two open type skip placed for recyclable waste, removal of it is an issue in
ARC
it's present location and garbage truck parking. 1. Gas bottle room location have been swapped with open skip for easy
Loading dock for R1029-01-KCD-DWG-B02-ARC-1206_A
loading of skip by the truck.
waste skip at R1029-01-KCD-DWG-B02-ARC-1200_A
08 These skips shall be changed to 4.5 cbm capacity with wheels and 3 numbers shall be KLW, ARC. LOW COORDINATION & COST PROCEED AUTHORITY NO SPECIFICATION UPDATE REQUIRED LEVEL 1 CLOSED
basement 2 level in KWL
placed at same location, so it can be pulled out for loading into waste truck. These 2. Two no. roller shutters have been added. Refer to Door Schedule.
KLW design R1029-02-HPTS-DWG-B02-KLW-00100
skips are currntly placed inside the room, which will be changed to place them out of
R1029-02-HPTS-DWG-B02-KLW-00201
the room to resolve the issue.

No action required
There is room service located at basement 2 with dedicated kitchen. There are room
Room Service at
09 service provided in Bellagio & MGM2 as well. The report does not explain the use of After going through DD comments provided by the operator, where there is KLW LOW COORDINATION N/A N/A N/A LEVEL 1 CLOSED
Basement 2
room service in basement 2 or overall room service journey to all hotel rooms. no comments on it. We understand that it has been provided as per
operator requirement.

There is only one make specified in tender specification of kitchen & laundry
equipment. R1029-01-HPT-SPC-KLW-00010
Kitchen Equipment
KLW PARTICULAR SPECIFICATIONS,
10 Specification of all N/A It is not good practice to specify just one make and not provide any alternate to it. Specifications updated to include different suppliers. KLW MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN NO DRAWINGS UPDATE REQUIRED LEVEL 1 CLOSED
floor There should be alternate option available for all equipment, so a competitive
ADDENDUM TO SECTION 2.0
quotation be received from kitchen contractor. This shall be provided as part of REFER TO ITEM NO. 13
tender addendum.

All drain through grating within kitchen & laundry area are marked for MEP
Kitchen Equipment MEP contractor to coordinate with Kitchen contractor for size & location.
Contractor. It is a good practice to include all kitchen equipment under kitchen
11 Specification of all N/A KLW, MEP LOW COORDINATION N/A N/A N/A LEVEL 1 CLOSED
contractor scope including drain trough grating with KLW scope, so there is no scope
floor No action required.
gap within the project and it is well coordinated.

Page 29 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - KLW - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY, OPERATOR &


PRIORITY / KEY ISSUES / IMPLEMENTATION
REF NO LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT DISCIPLINES IMPACTED PURPOSE CLIENT REMARKS TECHNICAL DESIGN DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS
CRITICAL STATUS
REQUIRMENTS

Air curtain at basement 2 level within KLW design scope have not been provided with
Kitchen Equipment specification and they are marked as OS&E. There should have been specification
Air curtains are provided in the MEP package.
Specification for provided for it, so there is no scope gap. Having air curtain as OS&E will have issues in
12 N/A KLW, MEP LOW COORDINATION N/A N/A N/A LEVEL 1 CLOSED
Kitchen Equipment at coordination of MEP requirements.
No action required
Basement 2
Specification need to be added in MEP contractor scope.

MEP drawings have been updated to correct the flow rate as per Project
requirements:
Basement –
B2.53.27 – actual flow rate is 780 L/s but in the HVAC layout shown – 6000
HVAC drawings have not been included as part of detail design package. This means L/s
Detail Design at all many of general exhaust requirement is missing from design. B2.59.36 – actual flow rate is 5070 L/s but in the HVAC layout shown – 510
13 N/A MEP MEDIUM COORDINATION & COST N/A TECHNICAL DESIGN MEP DWG MEP SPEC LEVEL 1 CLOSED
floors L/s

MGM 1 -
1M05.10.07 – actual flow rate is 981 L/s but in the HVAC layout shown –
440 L/s

There is no detail provided for floor depression requirement for chiller/freezer and The architectural floor built-ups and details are allowing the depth required
drain grating. for the installation of the chillers.
Detail Design at all
15 N/A ARC, KWL LOW COORDINATION N/A N/A N/A LEVEL 1 CLOSED
floors
This needs to confirm from architectural package, if the same is included in DD No action required
package

There are total 17 numbers of uniform conveyor provided for the project. By going
through the specification of it, the capacity is considered for 4600 uniforms, This
means that each conveyor capacity is just for 300 uniforms. The capacity can easily
be increased and quantity can be reduced unless it is designed with some concept
which demands for 16 quantity. But there is nothing mentioned in report. Also Total
Uniform room at staffing for MGM1, MGM2, Aria & Bellagio is 2872(as per staffing ratio of all three TO BE RESOLVED BY
16 No update requred. Subject to operations. KLW LOW COORDINATION TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
Basement 2 hotel brands presented in report), but as per laundry calculation detail in report, total OPERATIONS
staffing is 4500.
Need staffing confirmation for uniform conveyor size and basis of 16 numbers of
conveyors, which can easily be increased.

The buffet counter is located in one enclosed room with a space of 1500mm space
between two counters. This may result in congestion during operation for a staff Space between buffet counter has been increased to 1800mm. The working
strength of 2872 staff/4500 staff. (total staffing confirmation required). space between cooking and buffet is reduced by 100mm and island buffet R1029-02-HPTS-DWG-B02-KLW-00100 R1029-02-HPTS-
Staff Restaurant at ARC, KWL
17 counter is shifted by 250mm to increase space upto 1800mm. LOW COORDINATION PROCEED TECHNICAL DESIGN DWG-B02-KLW-00701 NO SPECIFICATION UPDATE REQUIRED LEVEL 1 CLOSED
Basement 2
Total seating requirement need to be confirmed from operator. The buffet design Tray rest rail to other side of island buffet counter is removed as cold R1029-02-HPTS-DWG-B02-KLW-00703
can be changed to allow for wider space between two counters for easy movement display cabinet can not be accessed from other side
during food pick-up from buffet keeping current seating count.

Total m2 required

The report is not clear about the food preparation, if it will be prepared inhouse or
shall be outsourced. There is no provision provided for Hot and cold food cart
parking within the space, which shall be used in both case to transfer food either
from bulk cooking kitchen or outsourced.
Staff Restaurant at Minor design change may be required for hot & cold food cart parking & charging TO BE RESOLVED BY
18 No update requred. Subject to operations. KLW, Arch. LOW COORDINATION TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
Basement 2 near to buffet in case of inhouse food from bulk production kitchen. If it is OPERATIONS
outsourced, then space for hot/cold box holding will be required. This space can be
provided by increasing some space for kitchen & buffet area and space for seating
can be reduced. Current seating space available is 680 sqm and seating provided is
388.

R1029-02-HPTS-DWG-B02-KLW-00100, R1029-02-
HPTS-DWG-B02-KLW-00401, R1029-02-HPTS-DWG- R1029-01-HPT-SPC-KLW-00010
Water filter missing from few kitchen equipment (ice machine, coffee machine,
B02-KLW-00403, R1029-02-HPTS-DWG-B02-KLW-
Kitchen & Laundry combi oven, undercounter glass/dish washer, water boiler). These filers are required, Total of 17 numbers needs to be added in BOQ & specification needs to be KLW PARTICULAR SPECIFICATIONS,
19 N/A KLW/MEP MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN 00501, R1029-02-HPTS-DWG-B02-KLW-00503, R1029- LEVEL 3 CLOSED
Tender Specification where water is used for direct consumption / to prevent scaling in combi oven / to suplied. ADDENDUM TO SECTION 2.1
02-HPTS-DWG-B02-KLW-00601, R1029-02-HPTS-DWG-
prevent water marks on glasses after wash. REFER TO ITEM NO. 1
B02-KLW-00603, R1029-02-HPTS-DWG-B02-KLW-
00701, R1029-02-HPTS-DWG-B02-KLW-00703

R1029-01-HPT-SPC-KLW-00010
Electrical point need to be provided for fire suppression system within
Detail Design at all KLW PARTICULAR SPECIFICATIONS,
20 N/A Electrical point required for fire suppression system is missing in the drawing. design. Total of 3 numbers needs to be added in BOQ KLW, MEP MEDIUM COORDINATION & COST PROCEED TECHNICAL DESIGN R1029-02-HPTS-DWG-B02-KLW-00502 LEVEL 3 CLOSED
floors ADDENDUM TO SECTION 2.1
and specifications needs to be supplieed.
REFER TO ITEM NO. 12

Page 30 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - LANDSCAPE - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
REF DISCIPLINES PRIORITY / KEY OPERATOR &
LOCATION IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: SPECIFICATION REFERENCES: LEVELS IMPLEMENTATION STATUS
NO IMPACTED ISSUES / CRITICAL TECHNICAL DESIGN
REQUIRMENTS

Arch. drawing detail "WP-09 FOH BOLLARD DETAIL" reference called out bollard
finish/cladding to be specified by Landscape Architect. There is not a bollard
The finish is accounted for in Group A Tender, it needs to be included in
detail located in the "1B-Ocean Drive and Central Plaza" set.
ARRIVAL the Group B documentation. Bollard detail has been added to "1B -
COORDINATION & 345-LA-LD-1B-30200-PDF
03 DRIVE, OCEAN Ocean Drive and Central Plaza" sheet set. In addition, a plan diagram and MEDIUM PROCEED TECHNICAL DESIGN NO SPECIFICATION UPDATE REQUIRED LEVEL 3 CLOSED
Bollard detail from area "1A-Arrival Drive" to be utilized at all other primary COST 345-LA-LD-1B-30201-PDF
DRIVE annotation has been included, outlining the locations of the detailed
dropoff locations on the podium, and a standard Stainless steel finish to be used
bollards.
in all other locations along Ocean Drive. Detail was added to "1B-Ocean Drive
and Central Plaza" sheet set.

PODIUM SLOT
Proposed Slot drain and Channel / Trench drain products have been R1029-00-SKS-SPC-LAN-00012
DRAINS AND
Infrastructure drawing references landscape drawings set for slot and submitted to design team for approval / confimation. Awating response. 345-LA-LD-1B-30100 LA PARTICULAR SPECIFICATIONS, ADDENDUM TO
04 CHANNEL / ARC, INFRA MEDIUM COORDINATION PROCEED TECHNICAL DESIGN LEVEL 1 CLOSED
channel/trench drain material and product specifications Once product has been confirmed, details and references will be added 345-LA-LD-1B-30102 SECTION 00 26 30,
TRENCH
to drawings and specifications if necessary. REFER TO ITEM NO. 02
DRAINS

Refinement and coordination to be conducted post Validation Stage.


STAIR ACCESS
FROM PLAZA Upon further review, the MEP louvers are coordinated with the
Ongoing ventilation coordination with MEP prevented a proper coordinated and
TO MGM 1 generator intake requirement.
08 integrated stair access from the Central Plaza to the MGM dining terraces. LA, MEP, ARC MEDIUM COORDINATION N/A TECHNICAL DESIGN N/A N/A LEVEL 1 CLOSED
AND MGM 2
Requires additional coordination and refinement.
DINING Stiars are having proper access from Plaza to MGM.
TERRACES
NO FURTHER ACTION REQUIRED

PODIUM R1029-00-SKS-SPC-LAN-00012
The current expansion joint detial product (INPRO J151 Series) shown in details
PAVING Details have been updated to utilize the from the INPRO (502 Series) 345-LA-LD-1B-30100-PDF LA PARTICULAR SPECIFICATIONS, ADDENDUM TO
09 07 and 08 on Sheet 345-LA-LD-1B-30102 does not meet 152mm width ARC, STR, LA MEDIUM COORDINATION PROCEED TECHNICAL DESIGN LEVEL 2 CLOSED
EXPANSION which allows for the required expansion width. 345-LA-LD-1B-30102-PDF SECTION 00 26 30,
requirement.
JOINT DETAIL REFER TO ITEM NO. 03

Total m2 required

Page 31 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - TIS - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
REF DISCIPLINES PRIORITY / KEY OPERATOR & SPECIFICATION IMPLEMENTATION
ASSET IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: LEVELS
STATUS
NO IMPACTED ISSUES / CRITICAL TECHNICAL DESIGN REFERENCES:
REQUIRMENTS

R1029-02-KCD-DWG-B01-ARC-1210
PODIUM & Increase kerb radius to 3000mm and widen mouth of valet COORDINATION & R1029-01-KCD-DWG-B01-ARC-1215 NO SPECIFICATIONS
03 ARC, TIS MEDIUM PROCEED TECHNICAL DESIGN LEVEL 1 CLOSED
BASEMENT ramp. COST UPDATE REQUIRED

Kerb radius is too small.

PODIUM & Modify kerb radius and carriagewal markings and remove COORDINATION & R1029-02-KCD-DWG-B01-ARC-1210 NO SPECIFICATIONS
04 Kerb radius is too small. ARC, TIS HIGH PROCEED AUTHORITY LEVEL 1 CLOSED
BASEMENT 2no. Parking bays 692 and 693. COST R1029-01-KCD-DWG-B01-ARC-1215 UPDATE REQUIRED

PODIUM & N/A N/A


05 Single unit truck requires full area to u-turn. No modification required as per TIS ARC, TIS LOW COORDINATION N/A TECHNICAL DESIGN LEVEL 1 CLOSED
BASEMENT

PODIUM & NO SPECIFICATIONS


06 Recommended to change saile direction Change to road asile direction. Demarcations to be updated. ARC, TIS MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-B02-ARC-1200 LEVEL 1 CLOSED
BASEMENT UPDATE REQUIRED
R1029-02-KCD-DWG-B02-ARC-1202

PODIUM & NO SPECIFICATIONS


07 Increase kerb radius to 4500mm. ARC, TIS MEDIUM COORDINATION PROCEED TECHNICAL DESIGN R1029-02-KCD-DWG-B02-ARC-1200 LEVEL 1 CLOSED
BASEMENT UPDATE REQUIRED
R1029-01-KCD-DWG-B02-ARC-1206

Kerb radius is too small.


Total m2 required

The Driveway width have been increased to 4.0M to allow R1029-01-KCD-DWG-L00-ARC-1220 NO SPECIFICATIONS
08 GFL PARKING EXIT ARC, TIS MEDIUM COORDINATION PROCEED TECHNICAL DESIGN LEVEL 1 CLOSED
for manoeuvring R1029-01-KCD-DWG-L00-ARC-1221 UPDATE REQUIRED

Driveway width at the exit turn is not sufficient

Internal radius to be changed to 3.85m above sky light with


COORDINATION & R1029-02-BSB-DWG-L02-ARC-1240 NO SPECIFICATIONS
09 L02 BELLAGIO SPA Radius is too small. 0.3m kerb offset to allow typical passenger car left turn ARC, TIS, LA HIGH PROCEED TECHNICAL DESIGN LEVEL 1 CLOSED
COST UPDATE REQUIRED
movement.

COORDINATION & R1029-02-BSB-DWG-L02-ARC-1240 NO SPECIFICATIONS


10 L02 BELLAGIO HOTEL Kerb radius is too small. Increase kerb radius to 8000mm. ARC, TIS, LA MEDIUM PROCEED TECHNICAL DESIGN LEVEL 1 CLOSED
COST UPDATE REQUIRED

Page 32 of 45
T H E I S L A N D - VALIDATION TRACKER
02 - TIS - PODIUM & BASEMENT
IMPACT ON PROCUREMENT

AUTHORITY,
REF DISCIPLINES PRIORITY / KEY OPERATOR & SPECIFICATION IMPLEMENTATION
ASSET IMAGE EXTRACT ISSUE DESCRIPTION RESOLUTION PROPOSAL/COMMENT PURPOSE CLIENT REMARKS DOCUMENTS IMPACTED: LEVELS
STATUS
NO IMPACTED ISSUES / CRITICAL TECHNICAL DESIGN REFERENCES:
REQUIRMENTS

Increase kerb radius to 5000mm and remove parking space COORDINATION & R1029-02-BSB-DWG-L02-ARC-1240 NO SPECIFICATIONS
11 L02 BELLAGIO HOTEL Kerb radius is too small. ARC, TIS HIGH PROCEED AUTHORITY LEVEL 1 CLOSED
26. COST UPDATE REQUIRED

Remove parking space 14 and widen to provide sufficient COORDINATION & R1029-02-BSB-DWG-L02-ARC-1240 NO SPECIFICATIONS
12 L02 BELLAGIO HOTEL Not sufficient room to turn. ARC, TIS HIGH PROCEED AUTHORITY LEVEL 1 CLOSED
turning. COST UPDATE REQUIRED

Access has been provided to Dewa access with removable


Single Entry and single Exit Ramp is provided at Arrival Drive R1029-02-KCD-DWG-B02-ARC-1200
Bollards. NO SPECIFICATIONS
13 TAXI DROP OFF to Enter and Exit the Guest Self parking / Taxi / Office / Apt ARC, TIS MEDIUM COORDINATION PROCEED OPERATOR R1029-01-KCD-DWG-B02-ARC-1202 LEVEL 1 CLOSED
(In case of an event, bollards shall be removed and Dewa UPDATE REQUIRED
Guest. This arrangement could not be enugh in case of event
access shall be used as an addditional exit route).

Total m2 required

Page 33 of 45