Quality Checks/ Internal for MEP Works

Project Name/No: ARABIAN RANCHES PHASE III (3A & 3C) – Report No - 01 Date:23 -09-2023
Prepared by: MUHAMMAD SHAHZAD

S.No Description Photographs Photographs after Work Remarks

IN-PROPER CUTTING
FOR INSTALLATION OF
1
GI BACK BOX AND
CONDUITS IN 3C & 3B
S.No Description Photographs Photographs after Work Remarks

CONDUITS INSTALLED
2 IN FRONT OF AC GRILL
IN 3B

DB & ONU BACK BOX’s


INSTALLED WITHOUT
3
PLASTER REFERANCE IN
PHASE 3C
7 WIRE, PULLED IN
4 20MM CONDUIT IN
PHASE 3C

CONDUITS ARE OUT OF


5 PLASTER REFERENCE
WALL IN PHASE 3C
CONDUITS MISSING IN
6 STARICASE FOR LIGHT
POINTS IN PAHSE 3C

BEAM CUTTING FOR


POWER AND DATA
CONDUITS (NOT
7
PROVIDED
THERMOCOOL DURING
TIE BEAM) PHASE 3B
BEAM CUTTING FOR
POWER AND DATA
CONDUITS (NOT
8
PROVIDED
THERMOCOOL DURING
TIE BEAM) PHASE 3C

NOT FOLLOWING A
PROPER WAY FOR
9
CONDUITING IN PHASE
3C
UN-WANTED HOLE IN GI
10
BACK BOX

NO PROPER WAY OF
11 UPVC CONDUIT
CONNECTION
GI BACK BOX OUT OF
12
THE PLASTER

GI BACK BOX OUT OF


13
THE PLASTER
ETISALAT DUCT
DAMAGE IN ETISALAT
14 MANHOLE & NOT A
PROPER WAY OF
CONDUITING

AFTER GOT CLEARANCE


FROM SUB-
15 CONTRACTOR, FOUND
CONDUIT NOT
CONNECTED (NABEEL)
AFTER GOT CLEARANCE
FROM SUB-
16 CONTRACTOR, FOUND
FCU’S CONDUIT NOT
CONNECTED (NABEEL)

DB OUT OF THE
PLASTER AND IN-
17 PROPER WAY OF
CONDUITING, CAUSE
WAIST OF WIRE