Date Site
power Work descripation
12/1/2023 AIRPORT 0 DOCUMENT WORK AND DISCUSS WITH CLIENT FOR EXCAVATION WORK.
BLOCK B SPRINKLER ALIGNMENT WORK BRANCH FABRICATION AND ERECTION WORK AND DISCUSS WITH
12/2/2023 NSC
CLIENT FOR CHANGE ROOT. AND ROSET PLATE ERECTION AT SAMPLE ROOM.
12/5/2023 LEAVE.
AIRPORT 0 CLOSE BFV AT CONNECTION WITH EXISTING LINE AND SITE VISIT WITH PSP CLIENT .
NSC 2ND FLOOR PIPE FABRICATION AND PAINT APPLY ON PIPE AND ERECTION WORK.
GUJARAT
2 WATER TANK UNLODING.
COLLEGE
DRESSING AND ATTEND LEKAGE AND WATER FILLING IN LINE AND CHEK AND APPLY BLACK JAPAN AND
12/9/2023 AIRPORT 2
WRAPPING COATING ON PIPE.
12/10/2023 NSC SIGN ON PERMIT AND 2ND FLOOR BRANCH FABRICAGTION WORK AND 1ST FLOOR FLEXIBAL ERECTION.
12/11/2023 AIRPORT 0 SITE VISIT AND COMPUTER TABLE AND FAN SHIFTING TO ADANI GREEN SITE.
NSC AT BLOCK B 1ST FLOOR CLOSE HYDROTEST AND MEASURMENT WITH CLIENT.
PUMP ROOM CLEARNCE AND FABRICATION WORK. BLOCK B ATTEND LEKAGE AND PREPRETION FOR
12/12/2023 NSC
HYDROTEST AND MARKING ON DRG AT BASEMENT.
12/13/2023 AIRPORT 0 IR PREPRETION AND DISCUSS WITH CLIENT AND PSP CIVIL ENGINEER FOR EXCAVARION WORK.
PUMP ROOM CLEARANCE AND RED OXIDE APPLY ON PIPE AND STRUCTURE,BLOCK B 1ST FLOOR FLEXIBAL
12/14/2023 NSC
ERECTION WORK AND HYDROTEST PREPRETION WORK 2ND FLOOR BRANCH FABRICATION WORK.
2ND FLOOR PIPE FABRICATION WORK AND ERECTION WORK AND DISCUSSION WITH CLIENT FOR 1ST FLOOR
NSC