The document is an observation report from the Layyah Combined Cycle Power Plant project. It details issues found with the wrong installation of drainage systems for cassette units on the HVAC system in the Electro chlorination building. The report provides descriptions of the issues, locations, and notes that corrective actions and QC approvals are required but not yet specified. It is addressed to DAN2 and was issued by the construction manager Mohamed Aboelsebaa on April 20, 2023.
The document is an observation report from the Layyah Combined Cycle Power Plant project. It details issues found with the wrong installation of drainage systems for cassette units on the HVAC system in the Electro chlorination building. The report provides descriptions of the issues, locations, and notes that corrective actions and QC approvals are required but not yet specified. It is addressed to DAN2 and was issued by the construction manager Mohamed Aboelsebaa on April 20, 2023.
The document is an observation report from the Layyah Combined Cycle Power Plant project. It details issues found with the wrong installation of drainage systems for cassette units on the HVAC system in the Electro chlorination building. The report provides descriptions of the issues, locations, and notes that corrective actions and QC approvals are required but not yet specified. It is addressed to DAN2 and was issued by the construction manager Mohamed Aboelsebaa on April 20, 2023.
Responsible Area Construction Mgr.: Eng. Said Belal
Responsible Construction Eng.: Eng. Mokhtar eltohamy
Description: wrong installation of drainage Description: wrong installation of drainage
system of cassette units on HVAC System system of cassette units on HVAC System Location: Electro chlorination building Location: Electro chlorination building Corrective Action: Corrective Action: QC Approval: QC Approval:
Description: wrong installation of drainage Description: wrong installation of drainage
system of cassette units on HVAC System system of cassette units on HVAC System Location: Electro chlorination building Location: Electro chlorination building Corrective Action: Corrective Action: QC Approval: QC Approval: