You are on page 1of 1

LAYYAH COMBINED CYCLE POWER

PLANT
OBSERVATION REPORT

Ref. No.: 5002-ESP-DAN02-SOR-000008

To: DAN2 Date: 20-Apr-23

Issued By Mohamed Aboelsebaa

Responsible Area Construction Mgr.: Eng. Said Belal

Responsible Construction Eng.: Eng. Mokhtar eltohamy

Description: wrong installation of drainage Description: wrong installation of drainage


system of cassette units on HVAC System system of cassette units on HVAC System
Location: Electro chlorination building Location: Electro chlorination building
Corrective Action: Corrective Action:
QC Approval: QC Approval:

Description: wrong installation of drainage Description: wrong installation of drainage


system of cassette units on HVAC System system of cassette units on HVAC System
Location: Electro chlorination building Location: Electro chlorination building
Corrective Action: Corrective Action:
QC Approval: QC Approval:

5002/AP101 Att.04 Rev.0 27 Jan. 2019 Page 1 of 1