Water Consumption for Mauseleum Construction

Percentage Water
Item No. Description Volume Multiplier
of Water Consumption

1 Column 0.27 6.00 0.50 0.81


2 Footing 0.30 6.00 0.50 0.90
3 Slab 1 0.60 2.00 0.50 0.60
4 Slab 2 8.00 1.00 0.50 4.00
5 Roof Slab 14.40 1.00 0.50 7.20
6 Beam 1.44 2.00 0.50 1.44
7 step 0.28 1.00 0.50 0.14
8 Plastering 1.00 1.00 0.50 0.50
9 Cleaning 0.10 60.00 1.00 6.00
10 Others 0.50 1.00 0.50 0.25
Cu Meter 21.84

At Balanga Water District ( Commercial Rate) 25 Pesos per Cubic Meter

21.84 cubic meter x 25 pesos/ cubic meter = 546.00 pesos